مهندس صناعي
AGC
مجموع سنوات الخبرة :8 years, 10 أشهر
مهندس انتاج و مشتريات
9months working for TAI plant (low voltage blokset),
-made a job description for the production line and the workshops.
-made time studies of the different production processes
and estimated the standard time of the product.
-develop the actual layout of the plant.
-made a plan to implement the lean system.
7 months Facilities Design for Gulf TEPCO plant to establish new plant produces the same products
-make lists of the needed tools, equipments and machines and
their technical specifications.
-design the production line.
-design feeding racks.
تقدير تراكمي جيد تقدير المشروع امتياز مشروع عن نظام السلامة و الصحة المهنية بمصانع اميسال