Ahmed  Al-attar, Quantity Surveyor Engineer

Ahmed Al-attar

Quantity Surveyor Engineer

AAA consultancy

Lieu
Egypte
Éducation
Diplôme, diploma for quantity surveying and and commercials management
Expérience
5 years, 8 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :5 years, 8 Mois

Quantity Surveyor Engineer à AAA consultancy
  • Egypte - Le Caire
  • Je travaille ici depuis mars 2022

at AAA consultancy (Regulated by RICS)
- Post-contract.
Responsible for valuation for variation according to the contract to get settled VOs, preparing
interim payment recommendations, monitoring, and reporting project budget, and negotiating
the contractor claim commercially (FIDIC 99).
Valuation for claims like delay-payment, and prolongation claims, preparing studies for price
inflation impact on the contract, and reporting anticipated final accounts.

Projects:
1) ElSewedy for Development and Management (SDM) 10th of Ramadan Industrial
Park:
• Infrastructure Networks, Ancillary Buildings, and External Works.
• Roads and sidewalks work.
• Five gates contract
• Administrative building
2) Pyramids Industrial Parks (PIP) 10th of Ramadan Industrial Park:
• Grading works
• Infrastructure Networks, Ancillary Buildings, and External Works.
3) ElSewedy for Development and Management (SDM) El-Sadat Industrial Park:
• Infrastructure Networks, Ancillary Buildings, and External Works.
4) Podium 2 - Cairo Festival City - AFCAC
• Finishing cores for four business buildings and two basements and landscape.
5) Urban Business Lane - TAMEER:
• Core and shell for six business buildings and two basements and landscape and shoring.
6) Call off contracts - Al Futtaim:
• Preparing invoices and building up new rates for subcontractors according to the schedule of rates for
construction contract

- Pre-contract.
Responsible for the preparation of pre-tender estimates, comparison between contractors'
offers, and reporting to clients.
And responsible for the preparation of tender documents and awarded purchase orders.

Projects:
1) ElSewedy for Development and Management (SDM) 10th of Ramadan Industrial
Park:
• Infrastructure Networks, pump room, and slow-down chamber.
2) The capital group - on Secondment as a commercial engineer to CGP:
• Preparing tender documents for FM packages, operation contracts, and rectifications.

Assistant Cost Engineer à AAA consultancy
  • Egypte - Le Caire
  • mai 2021 à mars 2022

QS Engineer / Deputy Cost Manager at AAA consultancy
Responsible for Q.S for all Finishes and External works, value engineering for designs, and Cost estimate for all changes and RFIs.
For estimation and negotiation Variation Orders and change orders (EI) with the contractor.
Projects:
1) Podium 2 - Cairo Festival City:
• Client: AL-Futtaim Commercial and Administrative Centers (AFCAC).
• PM: (JLL)
• Supervision consultant: (RMC)
• Cost Consultant: AAA consultancy (AAA)
• Contractor: (ACC)

Projects Coordinator à Holding Company for Water & Wastewater
  • Egypte - Le Caire
  • novembre 2020 à mai 2021

Responsible for Co-ordination with six governmental Water Companies (WCs) (Dakhlia, Sharqia, Behiera, Garbia, Monufia, and Damietta), The World Bank, and PMU (Part of Egypt’s Ministry of Housing, Utilities & Urban Communities); For KPIs, following up projects, writing letters and doing reports.

Projects:
1) Sustainable Rural Sanitation Services Program (SRSSP):
• total cost: One Billion Dollar

Technical Office Engineer à 3M For Construction
  • Egypte - Port Saïd
  • janvier 2019 à novembre 2020

Responsible for Preparing Shop-drawing, Quantity Surveying, Preparing Invoices, and doing Schedules. Using Revit for Modelling and Shop drawing.
Projects:
1) Porto Said’s Hotel (RC elements & Finishing & Landscape)
2) Café Du Paris (RC elements & Finishing)
3) Porto Said Hyper Mall RC Works.
4) Building B05 (RC Elements-Final structural As-Built shop drawing-walls-Finishing Z1-Z2-Z3-Z4-Z5)
5) B07 (Finishing Z2)
6) International School NIS (RC Elements, Finishing Works & Landscape)
7) B01 (Finishing Z1 Which area 1200SQM)

Site Engineer / Structural Technical Office à Creative Studio
  • Egypte - Mansourah
  • octobre 2018 à janvier 2019

Site Finishing works at Mansoura & Jamasah
- Shop drawing all RC elements & cost analysis for building

Éducation

Diplôme, diploma for quantity surveying and and commercials management
  • à Abstract
  • avril 2023
Baccalauréat, Civil Engineering
  • à Mansoura University
  • juin 2018

Graduation Project: Soil & Foundation with Excellent grade.

Specialties & Skills

Cost Management
Critical Thinking
AutoCAD Structural Detailing (ASD)
Research
Analysis
Problem Solving
Microsoft Office
Project QS
Project Control
Cost Management
Quantity Survey
Negotiation
REVIT (Structural & Arch)
Primavera P6
AutoCAD
variations management
BOQ Preparations
cost reporting
Invoicing

Langues

Arabe
Langue Maternelle
Anglais
Moyen

Formation et Diplômes

Strategy Implementation (Formation)
Institut de formation:
Copenhagen Business School
Date de la formation:
December 2015
Durée:
3 heures
Strategy Formulation (Formation)
Institut de formation:
Copenhagen Business School
Date de la formation:
November 2015
Durée:
2 heures
Strategic Management (Formation)
Institut de formation:
Copenhagen Business School
Date de la formation:
August 2015
Durée:
2 heures
Fundamentals of Project Planning and Management (Formation)
Institut de formation:
Corsera
Date de la formation:
August 2015
Durée:
3 heures
Project Planning Online course (Formation)
Institut de formation:
Project E
Date de la formation:
February 2020
Durée:
7 heures
Cost estimation for civil works (Formation)
Institut de formation:
Udemy
Date de la formation:
July 2020
Durée:
4 heures
Cost estimation for arch works (Formation)
Institut de formation:
Udemy
Date de la formation:
May 2020
Durée:
4 heures
Construction Claims Management (Formation)
Institut de formation:
Udemy
Date de la formation:
December 2020
Durée:
8 heures
Cost Control Online Course (Formation)
Institut de formation:
online
Date de la formation:
August 2020
Durée:
12 heures
Introduction to Planning and Control projects 2021 (Formation)
Institut de formation:
Hani ismail website
Date de la formation:
January 2021
Durée:
3 heures
Construction Contracts and Law (CB514) (Formation)
Institut de formation:
Udemy
Durée:
3 heures
Contracts, Claims & Disputes Resolution (Formation)
Institut de formation:
Udemy
Date de la formation:
February 2021
Durée:
3 heures
Fundamentals of Quantity Surveying (Formation)
Institut de formation:
abstract
Date de la formation:
March 2021
Durée:
10 heures
Explanation to the General Conditions related to FIDIC 99 (Formation)
Institut de formation:
Luqman academy
Date de la formation:
November 2021
Durée:
18 heures
Construction Tendering and Cost Estimation (Pre-contract) (Formation)
Institut de formation:
Udemy
Date de la formation:
January 2022
Durée:
18 heures
QSAC (Quantity Surveying and Commercial Management) Diploma Outline, for preparing RICS APC. (Formation)
Institut de formation:
online
Date de la formation:
June 2022
Durée:
90 heures

Loisirs

  • Reading
  • Swimming