shift engineer
قناة السويس لتداول الحاويات Suez Canal Container Terminal
Total years of experience :15 years, 10 Months
( Suez Canal Container Terminl)Maintenance engineer
• Preparation & supervision of executing preventive maintenance programs.
• Repair breakdowns of equipment (RTG, STS) (ZPMC and NOELL)
• Deal with PLC Siemens S7 300 and S7 400
• Deal with Siemens drives SIMOVERT and SIMOREG
• Deal with SINAMICS and SIMOTION system
• Deal with different types of communication (Ethernet, ASI, PROFIBUS, CAN and fiber optics) .
• Deals with generators maintenance and troubleshooting.
• Deal with MV switchgears and its protection (ABB).
• Perform maintenance for MV switchgears and connectors.
• Perform RCA (root cause analysis) for breakdown to eliminate them.
.Control and instrumentation engineer in “sphinx “factory
(Citadel Capital )for float glass
• Preparation & supervision of executing preventive maintenance programs.
• PLC Allen Bradley, S7 400 monitoring and troubleshooting.
• Lead and supervise team of technicians.
• Repair faults and study reasons for it to increase the reliability of the system.
• Supervise and provide the technical training for technicians.
• Work as shift engineer which is responsible for all maintenance works in whole factory and prepare daily report about shift activities .
• Monitoring and troubleshooting SCADA system .
• Deal with different S/W of drives and PLCs.
• Deal with MV switchgears, protection (FMR).
• Perform maintenance for transformers and check functionality.
Electrical engineer in "SOGIC" "company for dyeing and finishing" in Alexandria, new Borg al Arab city
Well known about Dc motor and converter (SSD - EUROTHERMS).
• Deal with Inverter (ABB- EUROTHERM-TELEMECANIQUE-LENZE-LS and
specially SIEMENS) programming and troubleshooting.
• Work with PLC (SIMENS “LOGO, S7 200, S7 300) programming and troubleshooting
• . Preparation & supervision of executing preventive maintenance programs.
• Supervise and provide the technical training for new team members.
• Designs and cost estimation of the projects.
• Upgrading old systems including convert it from DC to AC and using PLC instead of their classical control
• Draw full blueprint for new system after modification using drawing program (Cofaso).