planing engineer
Eastern Petrochemical Company - Sharq
Total years of experience :4 years, 4 Months
Responsible for working as part of a team that repairs mechanical problems.
Developing, testing and make modifications to mechanical equipment.
Safely operated equipment and tools to complete project.
Removed and repaired various equipment’s and components of RCP(reactorcoolant pump pump) & CCP (centrifugal charging pump).
Assisting with Mechanical Installations like mechanical seals and o rings.
Complete the maintenance of pumps and valves.
• Maintenance supervisor of Condensate Precooler Air fin fan Exchanger.
• Complete the blinding as per blinding list.
• Complete the air blowing of 75 tubes of cooler for MFL.
• Complete and accomplish the pneumatic test at 5 bar.
• MFL inspection of 75 tubes.
• Assist the RT(thermal radiography)
• Complete the maintenance of stripper reboiler heater
• Assist the insulation removal and scaffolding team
• Inspect the all flanges remove and install gaskets
• Perform the SWP checklist for pressures test & PTW issuance
• Performed hydro test as per QG approved pressure test plan @20.25 Bar
• Complete the de-blinding anf torqueing.
• Provide status reports to senior management to keep them apprised of progress and any anticipated issues
• Conducted Safety and security risk analysis.
• Assist the fabrication project of Cement industry
• Supervised the installation of mechanical machines such as conveyor belts and other industrial appliances according to specification of client
• Supervised the installation of bag filters
• Assist the arrangement and shifting of materials and equipments.
completed
(DAE) DIPLOMA OF ASSOSIATE ENGINNER IN MECHENICAL TECHNOLOGY. Duration 3 Years.