Electromechanical Estimator For Burhan في Burhan International Construction Company
  • الكويت
  • يوليو 2010 إلى مارس 2014

From (1/7/2010) up to now
Burhan International Construction Company
I worked as Electromechanical Estimator For Burhan International Construction Company I've been working
Reading tender documents generally and specially electromechanical documents
Revise electromechanical documents with list of documents and collect Clarifications and confusing data to send it to client as tender queries
Preparing EM packages and sends it to subcontractors and suppliers
Prepare the technical submittals for EM works
Study of subcontractors and suppliers offers and prepare comparison statement for all EM packages..Domains in various kinds of Projects as example

( Qatar -West 4 Storey Car Park for Qatar Foundation-Education City)
(Qatar -Lusail Development - Construction Package (CP) 6B)
(Qatar -Reconstruction & Upgrading of Old Salwa RPS - GTC 333)
(Kuwait Bowling Sports Club)
(Kuwait International Fair)
(Kuwait Institute for Scientific Research)
(Jaber Al Ahmed City)
(New Jahra Hospita)
(New Alsabah hospital)

Mass Engineering Consultant في Ministry of Finance
  • الإمارات العربية المتحدة
  • يناير 2010 إلى يوليو 2010

(Ministry of Finance)
From (1/1/2010) up to (1/7/2010)
Mass Engineering Consultant
SS CONSULT-ENGI MASS CONSULT-ENGINEERING

I worked as supervisor Executive engineer For Mass Engineering Consultant I've been working supervision in the field of supplying and installing equipment in fire, plumbing and air conditioning domains in various kinds of Projects as example:

Executive engineer في Alex Construction Co
  • أغسطس 2009 إلى يناير 2010

From (1/8/2009 (to (1/1/2010
Alex Construction Company (MADINATY)
I worked as Executive engineer For Talaat Mostafa Group (Alex Construction Co), I've been working in the field of supplying and installing equipment in fire, plumbing and air conditioning domains in various kinds of Projects as example:

CONTRACTOR في Delta Contracting Company
  • الهند
  • فبراير 2006 إلى يوليو 2009

From (15/2/2006 - 15/7/2009):
Delta Contracting Company (CONTRACTOR)

I worked as Executive engineer For Delta Contracting CO, I've been working in the field of supplying and installing equipment in fire, plumbing and air conditioning domains in various kinds of Projects as example:
Moevenpick Project
I was in charge of executing: - Air conditioning and fire systems at the VIP's halls.
- Internal and external Chilled Water pipe network
- Main fire systems.
- Isolation of internal pipes.
- Installing, their connections, installing Hockup.
- Installing exhaust fan system.
- Internal network of that halls.
- Installing zone control and tamper switch.
Alfa Market, Maadi
I supervised: - Restoring air conditioning systems.
- Renovating 19 machine package unit (water cooled)
- Building two cooling towers and connecting it to the systems.
- Executing pumps of the system.
- Executing the cooling network of pipe to cooling the condenser and connecting it to the machines.
Eva Cosmetics, 6 October
I was in charge of: - Carrying out external sanitary network of the plant, sewerage system, water supply lines.
- Building internal networks of the plant: sanitary system, water supply lines, connecting them to the external network.
- Building copper pipelines network for a compressed air and copper pipelines for vacuum air.
- Connecting the plant's shampoo and gel machines to compressed air lines.
- Building wash bay chambers.
Dorra Group
- Building water supply lines for new villas.
- Executing sanitary system of the villas using cast iron and lead pipes.

A housing tower at Zamalek district
(26 Hassan Sabri st)
- Restoring supply lines and sanitary systems.
- Building fire systems.
- Renovating the upper bathrooms.

في Ahmed Abbas Consulting Engineering Firm
  • أغسطس 2005 إلى سبتمبر 2005

- Aug. 2005- Sept.2005 Ahmed Abbas Consulting Engineering Firm.

في Power Plant
  • مصر
  • يوليو 2002 إلى أغسطس 2002

- Training: - July 2002-Aug 2002 Power Plant, West Cairo.

الخلفية التعليمية

الثانوية العامة أو ما يعادلها, Engineering
  • في Minia University
  • مايو 2005

May 2005 Graduated from Faculty of Engineering, Minia University Mechanical Power Engineering Department Project: Fan Design Grade: Excellent

Specialties & Skills

AIR CONDITIONING
CAST IRON
CHILLED WATER
COOLING
ENGINEER
ESTIMATOR
EXHAUST
PLUMBING

اللغات

العربية
مبتدئ
الانجليزية
متمرّس