Total Years of Experience: 2 Years, 8 Months
September 2011
To August 2012
process engineer
at Iffco Egypt
Location :
Egypt - Suez
operates several types of units (agitation mixer-tube reactor-vacuum system-heat exchangers-cooling tower-pumps), monitoring process from control room, controlling valves of materials and steam whatever it is a manual valve or automatic valve turned from control room, supervising all maintenance troubleshoots and report factory manager about everything.
rin general : responsible for every thing in the plant during my shift
process manufacturing, man power, raw maerials, utilities, etc)
rin general : responsible for every thing in the plant during my shift
process manufacturing, man power, raw maerials, utilities, etc)
January 2010
To September 2011
Site manager
at Pan Au Sai petrochemicals
Location :
Egypt - Suez
Responsible for terminal (industrial safety, fire fighting system of the site and handling all engineering situations in site (pipelines network design, pumps maintenance) and transportation of liquid chemicals to and from tanks
Share on Facebook
Share on Twitter
Share Via Email