PIPING ENGINEER
Company (3)
Total des années d'expérience :4 years, 2 Mois
Company (3)
Co. Name: EVRMaC (13/9/2010-till now)
Subcontracted by Initec for plant piping design, critical piping stress analysis,
Special supports designs, MTO, ISOS, and as built.
Projects: -
1-Nuberia Power Plant III (750MW combined cycle project)
2-Tebbin Power Plant (2 X 350 MW Thermal power plant)
3-Cairo West Power Plant (2 X 350 MW Thermal p.p.)
Owner: Egyptian Electricity Authority.
Consultant: (PGESCo)
Location: Egypt
6- Contractor: UHDE co.
DESIGN & AS BUILT DESIGN for project HENKEL IN PORT SAID (1/9/2011-16/10/2011)
Piping
Knowledge
Elementary Course for Piping System entails the following: 1. Hardy Cross technique to analyze the pipeline systems
2. The phenomenon of water hammer.
3. Pipe drafting and design
4. ASME B31-1-2004 Power piping
5. P&ID " Piping &Instrument Drawing"& Design Criteria
6. GA Drawing & SITE ARRANGEMENT CRITERIA
7. Pipe Hangers& Supports& Caepipe piping stress analysis
8. PDMS piping &Equipment design, Draft and Isodraft.
Engineering
programs
1. Microsoft office
2. AutoCAD
3. PDMS12.6 piping design, Equipment, Isodraft, Draft, CATS&SPECS, SPOOLER, ROUTER, HVAC, CABLE TRAY, STRUCTURE, SPOOLER, ELECTRICAL COMPONENT and ADMIN.
4. Caepipe piping stress analysis
5. PREMAVERA 6 ADVANCED COURSE
6. WELDING INSPECTION FOUR METHODS
8. MAINTAINANCE OF DIESL ENGINES &HYDRAUOLIC SYSTEMS
Contractor: Initec Energia SA
Position: piping designer and stress analyst.
4 - Contractor: ECG
ECG (3 months) with KHRAFI NATIONAL (11/2010-3/2011)
design and modeling with PDMS two projects: ISM & DOM thermal power plant simple cycle
Evaluator and checker.
Underground infra pipe routing, check clashes.
5- Contractor: PETROJET co.
Responsible for giving basic course pipe& equipment to PETROJET company piping staff
Client: INTEC INERGA
Site: Cairo west Power Station.
Contractor: PGESCO (Power Generation Engineering and Services Company)
Construction & piping Engineer in Kahromika Company In Cairo west power station steam power plant from September 2009 till September 2010.
Project (2)
Project: Ben ghazi power station.
Client: kahromika.
Site: Ben ghazi Power Station.
Construction & piping Engineer in Kahromika Company In Ben ghazi power station steam power plant from August 2008 till August 2009.
May 2008: Bachelor of Engineering HELWAN University-MATARIA Branch Major: Mechanical Power and energy. Minors: STEAM POWER PLANT-GAS TURBINES- Water Desalination-Hydraulic & Pneumatic Systems-Refrigeration & Air Conditioning Systems-External &Internal Combustion Engines-Renewable energy. Final Year Grade: VERY GOOD Graduation Project: PERFORMANCE OF DIESELENGINES USING ULTERNATIVE FUELS Final Year Project Grade: Excellent Work