Total years of experience :7 years, 9 Months

Senior Surveyor at Arcadis
  • Saudi Arabia - Riyadh
  • September 2015 to August 2017

2015 - Date
National Water Company (NWC) - Development of Asset Database and Integrated Master Plan for Holy City of Makkah for ARCADIS Consultant , Makkah, KSA - Senior Surveyor

Responsibilities:

Train the contractor team on required surveying procedure
Planned and Managed the strategy of survey process.
Managed the survey teams and follow up survey work.
Reviewed the output of survey work and double check.
Perform quality assurance on survey work
Assistance of handing over the survey deliverable to the client.

Senior Surveyor at Dar Al Riyadh Consultants
  • Saudi Arabia - Riyadh
  • November 2012 to November 2014

Key Projects:

1. Providing engineering consulting services Project for the studies of preventing the dangers of flooding for the Civil Aviation Authority at the level of 24 airports in the Kingdom

Responsibilities:

Reconnaissance and exploration storm drainage inside and outside airports.
Creating control points according to Saudi control point(Geodesy).
Surveyed all storm drainage inside and outside of whole airports.


2. Providing engineering consulting services Project for development and data preparation for the operation and maintenance projects of municipal facilities at the holy capital directorate.

Responsibilities:
Prepare a Geodatabase and collect the information for all related operation and maintenance buildings under Makkah municipality .
Creating control points according to Saudi control point(Geodesy).
Survey all operation and maintenance buildings .

3. Providing engineering consulting services Project and installation of eleven subdivision plans in Al-Baha City for Al-Baha municipality .

Responsibilities:

Creating control points according to Saudi control point(Geodesy).
Survey for all subdivision plans and all its surrounded roads.
Prepare a Geodatabase and collect the information for all land use .
Assist planer engineer for collecting the information to solve the issues planning.




4. Project of Construction and Planning a border town between Salwa port and Al Batha at the Eastern borders for the Ministry of Municipal and Rural Affairs


Responsibilities

Topographic survey of all the project area .
Steak Out of the project boundary .
Assist planer engineer to solve the issues planning.
Creating control points according to Saudi control point(Geodesy).

5. Draft Technical Studies and supervision of municipal of Hail and Affiliate Municipalities.


Responsibilities:
Survey of Building information .
Survey of all road under design for Hail city.
Assist the GIS team for collecting data .

Surveyor at 2011 – 2012 Modern Technology Office for the Survey Engineering
  • Saudi Arabia - Riyadh
  • January 2011 to May 2012

Key Projects:

1. Creation of survey work and GIS Database for Daba’a Seaport

Responsibilities:

Creating control points according to Saudi control point(Geodesy).
Detailed Survey for Entire Daba’a Seaport.



2. The project of survey and review the old architectural drawings
of the five floors to the striving (Massa inside the Grand Mosque in Mecca
(expansion project of the Grand Mosque in Mecca (

Responsibilities:

Review all old architectural drawings for the five floor to the striving.
Adjust these drawings through AutoCAD Software .


3. The project of the construction and set up of data base and installing control points and survey AL Fawarah canter and the 19th village related to the canter

Responsibilities:

Creating control points according to Saudi control point(Geodesy).
Survey of entire AL Fawara Centre and the 19th village related to the canter.





4. Drafting borders project and topographic survey for the King Abdullah young people housing project under the Ministry of housing throughout the Kingdom (Riyadh, Al-Kharj, Jeddah, Al-Madina, Tabuk, Abha, Al Hasa).

Responsibilities:

Creating control points according to Saudi control point(Geodesy) for all Cities .
Steak Out of the project boundary for all Cities under Projects Supervision .
Topographic survey of all the project area for all Cities .

5.Steak out and Survey for some contractors to finalize the excavation and filling submittal invoices

Responsibilities:

Survey of Roads Sections every 25 M for the total Road length about 14 KM.
Finalize the survey Quantity through the Land Desktop Software .

Surveyor at Egypt Gaz
  • Egypt - Cairo
  • August 2008 to October 2010

1.National Project for Delivering the Natural Gas for Cairo and Al Jieza

Responsibilities:
Survey of natural Gas Pipelines path and facilities .
Survey for all cities and paper surveying maps.
Supervise of Surveying for executing the Natural Gas pipeline and Stations .
Survey the as built and steak out on the maps.
Prepare the final maps and delivered to the client.

2. Project construction for Methanol Factory for Demiat seaport

Responsibilities:
Steak Out of the project boundary .
Steak Out Concrete works.

Education

Diploma, General Survey
  • at Survey Institute
  • May 2008

Specialties & Skills

Total Station
AutoCAD
Surveying
AUTOCAD
Total Station
DATA TRANSFER
MICROSOFT OFFICE

Languages

English
Beginner
Arabic
Expert

Training and Certifications

gps (Training)
Training Institute:
AL JEHAT COMPANY
Date Attended:
June 2011
Duration:
14 hours