احمد المصرى, Senior Mechanical QA / QC Engineer

احمد المصرى

Senior Mechanical QA / QC Engineer

Intecsa Industrial

البلد
المملكة العربية السعودية
التعليم
بكالوريوس, Mechanical power Engineering
الخبرات
13 years, 9 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :13 years, 9 أشهر

Senior Mechanical QA / QC Engineer في Intecsa Industrial
  • المملكة العربية السعودية - تبوك
  • ديسمبر 2016 إلى أبريل 2022

Project: Construction of Duba Integrated Solar Combined Cycle 600 MW Power Plant

Following Project specifications and Codes requirements
Surveying and hand over the terminal points, foundations & embedded parts from civil contractors
Following the topographic survey activities and review reports
Gas Turbines Installation inspection
Steam Turbine & Condenser Installation Inspection
HRSG Installation Inspection
water treatment and waste water plants installation inspections
Provide safety, quality and schedule oversight in order to ensure appropriate oversight for all Power Block and Permanent Plant mechanical equipment installation and erection, which includes but is not limited to;pump house trash screen, pumps, motors, compressors, heat exchangers, pressure vessels, steam generators and diesel generators
Review, Sign & Control the subcontractors Inspection Requests

Senior Mechanical QA / QC Engineer في INITEC Energia S.A Spanish Company
  • مصر - السويس
  • أكتوبر 2014 إلى نوفمبر 2016

Project: Construction of SUEZ THERMAL POWER PLANT 1X650 GAS/OIL FIRED UNIT
Location: SUEZ - Egypt
Client: East Delta Electricity Production Company
Consultant: PGESCo.
Main Contractor: INITEC Energia Spanish Co.
Contractor: KAHROMIKA
CP-118 Contract
(Mechanical Equipment & Piping Installation )
(2 Desalination units Installation )
(Auxiliary Boiler Unit)

.Following Project specifications and Code requirements
Surveying and hand over the terminal points, foundations & embedded parts from civil contractor
Following the topographic survey activities and review reports
Mechanical Equipment Static & Dynamic (Pumps, Turbines, Compressors) Installation Inspection
Review the subcontractor piping isometrics welding map
Prepare project welding data base
Control Welding Productivity & Progress measurement
Review Test Packages
Preparing loops for hydro-static pressure testing & Inspection of the pressure testing
Control Final Painting & Thermal Insulation activities
Prepare the final QA/QC report of the contract

Mechanical Project Engineer في MEGA
  • مصر - القاهرة
  • فبراير 2013 إلى أكتوبر 2014

Project: Construction of Giza North 2250 MW Combined Cycle Power Plant
CP-118 "Mechanical Equipment / Piping Installation"
Contract quantity surveying and re-measurement
Prepare the data base of the project
To supervise and follow up all mechanical work carried out in the project
Progress measurement for all process as per the contract
Preparing monthly invoice for construction work progress
Review the RFIs and FCNs
Evaluate additional mechanical work at site and preparing cost addition proposal

Mechanical Construction Engineer في Suiz Steel Company
  • مصر - السويس
  • يوليو 2011 إلى فبراير 2013

Construction of the Direct Reduction Plant (DRP) - Hot DRI charge 1.95 Mtpy of DRI
Piping Construction Engineer Process piping

Responsible for installation and testing the piping systems in:
• DRP Reactor Tower area
• DRP Cooler Tower area
• DRP HYTEMP Tower area

Mechanical construction Engineer في KAHROMIKA
  • مصر
  • أغسطس 2008 إلى يوليو 2011

Construction of ALSHABAB SIMPLE CYCLE GAS TURBINE POWER PLANT 1000 MW (8 X125 MW
Mechanical Construction Engineer)
Responsible for the mechanical installations in unit 6
• The steel structure of the unit
• The gas turbine enclosure
• The air inlet duct system
• The exhaust gas system (duct / chimney)

Construction of ELTEBBIN THERMAL POWER PLANT 2X350 MW Gas / Oil Fired Units
CP-118 Mechanical Contract (Piping / Equipments)

Piping Construction Engineer Power Piping
Responsible for installation of critical piping systems
1. Main steam system
2. Feed water system
3. Extraction steam and FWH drains system
4. Auxiliary steam system

الخلفية التعليمية

بكالوريوس, Mechanical power Engineering
  • في Cairo University
  • مايو 2008

Specialties & Skills

اللغات

الانجليزية
متوسط