Electrical Engineer
Egyptian Electricity Authority
Total years of experience :14 years, 9 Months
From 10/1988 to 06/2000
General Department of Design Egyptian Electricity Authority, Abbassia, Egypt
Tendering& Pre and Post Tender documents and contract execution for Extra High Voltage substation, for a voltage up to 500/220/66 KV, Refer to IEC standards and IEEE:
• Conventional and GIS Switchgear
• Current and voltage transformers.
• Circuit Breakers
• Switches and Isolators
• Arrestors
• Power Transformers
• Reactors
• Aux. Transformers and AC/DC Low voltage systems.
From 10/1985 to 10/1988
- Egyptian Electricity Authority/CairoZone/220KV Heliopolis Substation/
Installation of substation components, such as all electrical works at the Gantry for main power transformer as well as its disconnecting switchgears, and control panels inside substation Control room, including A.C low voltage utility supplied by 2 x 500 KVA station transformer, As well, D.C voltage supplied by two rectifiers for Relay& protection system