احمد  حامد, Project Manager - PMC

احمد حامد

Project Manager - PMC

Khatib & Alami

البلد
مصر - القاهرة
التعليم
بكالوريوس, Interior Architecture
الخبرات
22 years, 8 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :22 years, 8 أشهر

Project Manager - PMC في Khatib & Alami
  • المملكة العربية السعودية - مكة المكرمة
  • أشغل هذه الوظيفة منذ يناير 2022

• Developed implementation methodologies to rein in project costs while meeting key milestones.
• Developed and initiated projects, including managing costs, schedule and performance.
• Achieved project deadlines by coordinating with contractors to manage performance.
• Eliminated discrepancies by reviewing performance, status and safety adherence.
• Identified plans and resources required to meet project goals and objectives by setting realistic timelines and checkpoints.
• Identified, reviewed and applied policies and procedures by exercising informed judgment to achieve optimal performance.
• Orchestrated projects within strict timeframes and budget constraints by solving complex problems and working closely with senior leaders.
• Modified and directed project plans to meet organizational needs.

Site Project Manager في MH Group - ECD Company
  • مصر - القاهرة
  • يونيو 2020 إلى ديسمبر 2021

• Verified construction documentation conformed to quality assurance standards and client requirements.
• Tested models of alternate designs and processing methods to assess feasibility, operating condition effects, possible new applications and necessity of modification.
• Performed on-site field surveys and wrote technical narratives to document processes and design changes.
• Prepared, checked and coordinated documentation to support component design and application.
• Provided technical leadership for company to effectively steer strategic plans and future projects.
• Reduced costs by driving competitive subcontractor bids and effective contract execution.
• Maintained zero site accidents at Site.
• Surveyed sites to determine material needs and accurately manage inventories and budgets.
• Prepared specialty subcontractor bug packages, materials for project management and estimation processes.
• Provides guidance regarding scope of work, schedules, procedures, field construction problems, and other technical information.
• Determines budget estimates and staffing requirements for the defined scope and schedule.
• Establishes, monitors, and maintains construction engineering quality control in the field.
• Collaborates with construction management to eliminate any hazards associated with the work that may adversely affect the environment or the safety or health of employees.
• Ensures that personnel of the assigned group engage in safe work practices in compliance with site specific safety procedures and industry standards.
• Establishes and maintains a close working relationship with client representatives, and contractors and government entities.
• Maintains project control documentation, necessary permits, design drawings and specifications, back charge documents, change orders, etc.
• Monitors contractor performance pertaining to schedule and conformance to plans and specifications.
• Makes decisions regarding long range planning, scheduling, budgeting, work priorities, and personnel.
• Performs other responsibilities associated with this position as may be appropriate.

Site Project Manager في 7 Pillars International
  • مصر - القاهرة
  • نوفمبر 2018 إلى مايو 2020

• Verified construction documentation conformed to quality assurance standards and client requirements.
• Tested models of alternate designs and processing methods to assess feasibility, operating condition effects, possible new applications and necessity of modification.
• Performed on-site field surveys and wrote technical narratives to document processes and design changes.
• Prepared, checked and coordinated documentation to support component design and application.
• Provided technical leadership for company to effectively steer strategic plans and future projects.
• Reduced costs by driving competitive subcontractor bids and effective contract execution.
• Maintained zero site accidents at Site.
• Surveyed sites to determine material needs and accurately manage inventories and budgets.
• Prepared specialty subcontractor bug packages, materials for project management and estimation processes.

Procurement Manager في Andalusia group for healthcare services
  • المملكة العربية السعودية - جدة
  • نوفمبر 2016 إلى أكتوبر 2018

• Performed monthly reconciliation of open purchasing orders.
• Solved diverse supply chain problems involving numerous sources, logistics and scheduling factors.
• Devised and executed annual purchasing plans and contracts.
• Oversaw budget and all purchasing needs for all Construction & Renovation Projects for both Egypt & KSA.
• Decreased material expenses by managing tracking and supply.
• Implemented policies to reduce cost and eliminate waste.
• Assessed areas of service concern and developed improvement plans.
• Developed and initiated incentive and recognition programs for suppliers.
• Purchased new products and oversaw inventory stocking and availability.
• Coordinated paperwork, updated spreadsheets and maintained permanent records.
• Established clear lines of communication between Company and suppliers.
• Sourced vendors-built relationships and negotiated prices.
• Maximized operational effectiveness across territory.
• Generated weekly, monthly, quarterly and yearly reports on purchasing operations

Project Coordinator Engineer في Saudi Bin Ladin Group
  • المملكة العربية السعودية - جدة
  • أكتوبر 2010 إلى أكتوبر 2016

• Gathered requirements for ongoing projects and organized details for management use.
• Kept projects on schedule by managing deadlines and adjusting workflows as needed.
• Tracked all hours and expenses to keep project on task and within budgetary parameters.
• Provided technical direction and initiatives to other engineers, designers and technicians.
• Developed executive presentations and reports to facilitate project evaluation and process improvement.
• Transitioned projects from estimation and pre-construction phase to well-defined project execution plan.
• Checked compliance of company safety plan and delivered recommendations to address regulatory issues.
• Supervised multiple projects from project start through delivery by prioritizing needs and delegating assignments.
• Built strong relationships with internal and external stakeholders and devised strategies, initiatives, and events promoting products and services.
• Planned and arranged meetings with external organizations and individuals, enabling all parties to meet and discuss project progress.
• Collaborated with project leaders to comply with accounting needs for project maintenance requirements.
• Coordinated presentations for customers and project members detailing project scope, progress and results, keeping all entities well-informed of milestones and goals.
• Maintained project schedules by managing timelines and making proactive adjustments.
• Collaborated with project owners and team members to set ambitious but achievable goals.

Senior Site Engineer في Vinci Construction
  • مصر - القاهرة
  • مايو 2009 إلى سبتمبر 2010

• Established and implemented construction schedules, methods, equipment and labor requirements, using Gantt charts and MS Project.
• Checked technical designs and drawings for adherence to standards.
• Coordinated site investigations, documented issues and escalated to executive teams as needed.
• Performed quality control procedures on equipment and materials.
• Recorded daily events and activities in site diary to evaluate process and improve productivity.
• Prepared site reports and organized subcontractor invoices, codes documentation and schematics.

Senior Site Engineer في CDC - Qatar
  • قطر - الدوحة
  • سبتمبر 2005 إلى أبريل 2009

• Established and implemented construction schedules, methods, equipment and labor requirements, using Gantt charts and MS Project.
• Coordinated site investigations, documented issues and escalated to executive teams as needed.
• Performed quality control procedures on equipment and materials.
• Recorded daily events and activities in site diary to evaluate process and improve productivity.
• Prepared site reports and organized subcontractor invoices, codes documentation and schematics.
• Managed various stages of construction projects, including finishing & light concrete works.
• Supervised and monitored daily tasks of all subcontractors.

Technical Office Engineer في Contrack Facilities Management
  • مصر - القاهرة
  • أكتوبر 2001 إلى أغسطس 2005

• Participate in implementing technical office policies and procedures.
• Study the project contract documents (time schedule, project design drawings, BOQ, etc.).
• Update the shop drawing log before sending the shop drawing to the consultant for approvals.
• Study and prepare requests for information (RFIs) for all missing, unclear, conflicting or other technical matters that may arise during construction.
• Review sub-contractors’ shop drawings as well as outsourced shop drawings and coordinate their approval process with the project consultant.
• Coordinate with the Surveying Engineer to provide him all the information about land coordinates and any site measurement required.
• Participate in solving/reporting any unexpected technical difficulties, and other problems that may arise during construction to the Technical Office Manager for discussion and proper solution.
• Prepare as-built drawings at the end of the project and hand over to the project consultant.

الخلفية التعليمية

بكالوريوس, Interior Architecture
  • في Faculty of Applied Arts
  • يونيو 2001

Specialties & Skills

Adobe Photoshop
Interior Design
AutoCAD
Microsoft Excel
Negotiation
Leadership
Coordination
Multitask
Management

اللغات

الانجليزية
متمرّس
العربية
اللغة الأم

التدريب و الشهادات

VALUE ENGINEERING – SAVE INTERNATIONAL (الشهادة)
تاريخ الدورة:
July 2014
صالحة لغاية:
January 9999
PROJECT MANAGEMENT PROFESSIONAL PMP (الشهادة)
تاريخ الدورة:
December 2014
صالحة لغاية:
January 9999
BD + C 301 CONSTRUCTION LEED RATING SYSTEM (الشهادة)
تاريخ الدورة:
April 2012
صالحة لغاية:
January 9999
AIA CODE-50 COURSE – FIRE DOOR SYSTEM (الشهادة)
تاريخ الدورة:
April 2013
صالحة لغاية:
January 9999
QUALITY CONTROL & QUALITY ASSURANCE (الشهادة)
تاريخ الدورة:
February 2010
صالحة لغاية:
January 9999

الهوايات

  • FOOTBALL