Lead Project Field Engineer
El Sewedy Power
Total years of experience :12 years, 3 Months
1-Define and implement the engineering strategies for contract fulfilment in line with the projects strategies.
2- Manage engineering team including internal resources and engineering subcontractors.
3-Prepare, maintain and develop the engineering execution plan and provide input for the project and procurement execution plan.
4-Prepare and follow engineering budget including cost of subcontracted engineering services.
5-Prepare and update engineering organization chart and request nomination of discipline lead engineers.
6-Manage and control the interface between the project engineering team and the project internal and external stakeholders.
7-Participate in contract technical negotiations and provide support to proposal negotiation team. Manage the technical hand-over from the proposal team.
8-Ensure timely response on technical issues internally as well as to the customer and/or his representative.
9-Perform technical risk assessment and corresponding risk reviews.
10-Resolve all open technical issues in the best interest of the project and provide technical input for claim management.
11-Releases the submission of engineering deliverables to customer and/or consulting engineer.
12-Clarifies and supports site in all technical issues, lead the field engineering team and coordinate with the respective engineering teams in office.
13-Follow company and engineering department procedures and workflow.
14-Participate and provide necessary input to build and enrich company's lesson learned and knowledge database.
As a Member of the Project Team of Aweer Power Station ‘H’ Phase IV (700 MW, Siemens gas turbines “F”-Class working on the Design of the Balance of Plant (BOP) Systems & Equipment My key responsibities include:
1-Compressed Air System Equipment sizing and calculation.
2-Diesel Fuel Oil System Equipment Sizing and calculation.
3-Sharing the engineering documents with consultant and owner (EDF/DEWA) until closing all comments and taking approval seal.
4-Issuing Request for quotation and submitting to Procurement team.
5-Reviewing all Techno Commercial offers from bidders and prepare technical evaluation sheets and finalize purchase orders.
6-Reviewing all documents with vendors and until finalize approval cycle.
1- Participated in the proposal preparation of Beni Suef Power Plant Project.
2- Participated in the contract preparation and negotiations of the supply and the erection and commissioning services of the Power Block Packages for Project with Program Management Team.
3- Following up all the technical, contractual, and logistical issues associated with the supply and service contracts of the Packages.
4- Following up & supporting the erection, commissioning, and start up phases of the Power Block Packages
* I am working as mechanical design engineer responsible for:
Fire protection system :
1- Deluge System Transformers.
2- Wet Pipe Sprinkler System.
3- Fire hose cabinet system.
4- Distribution portable fire extinguishers system.
* I am responsible for :
1- Make a calculation on elite software.
2- Routing for pipes and coordination with another systems.
* Project: (Aldiwanya power station 4x125 MW GE 9E Frame in Iraq Simple
Cycle)
* EPC project joint venture (JV) with the Arab Contractors
* Following up all the technical, contractual, and logistical issues associated with the supply and service contracts of the Packages.
* Following up & supporting the erection, commissioning, and start up phases of the Power Block Packages
As a member of the Mechanical Construction Team of Power System Projects (PSP) working on the Contract of the Egyptian Project, (El Ain El Sokhna Supercritical Thermal Power Plant 2x650 MW-Water Treatment Plant CP-111) with Veolia company responsibilities included:
1- Reviewing drawings (General Arrangement, Layout, P&ID, Isometrics, and Detailed Drawings) for conformance with the contract and assist their Constructability.
2- Ensuring Construction work complies with all Engineering Standards, Codes, Specifications and Design Instruction, and Safety Standards.
3- Planning and Scheduling Site Construction jobs to meet Contractual Milestones.
4- Providing Technical Information and Interpretation of Drawings and Specifications to Site Crew.
5- Conducting Risk Assessments identifying the hazards in a specific construction job and take necessary measures to reduce the probability and severity of the risks.
6- Assigning field employees to a particular piping construction work area and supervise their
7- Continually finding solutions to conflicts in Mechanical/Structural drawings and specifications by conferring with the Client. Also, coordinate Inspections with Client and Consultant as per the contract.