Ahmed Ibrahim Eldesouky, Quality Manager

Ahmed Ibrahim Eldesouky

Quality Manager

Parsons International

Location
Egypt - Alexandria
Education
Master's degree, Projects Quality Management
Experience
27 years, 11 Months

Share My Profile

Block User


Work Experience

Total years of experience :27 years, 11 Months

Quality Manager at Parsons International
  • Qatar - Doha
  • My current job since September 2011

New Doha International Airport, QATAR
Quality Manager

• Develop and Implement the Project QA/QC management system at site
• Coordinate with the Customers representatives on all quality matters
Coordinate quality inspections with all site subcontractors and vendors
• Coordinate, review and approve all receipt quality inspections
• Coordinate all non-destructive testing on site
• Distribute relevant QA/QC documentation to site subcontractors
• Verify that all quality related site activities are in accordance with the applicable codes and standards
• Plan, manage and participate in the site internal and external site audits
• Coordinate all quality site inspections through the site QC in-spectors
• Ensure all quality control documentation is are competed for as-built hand over
• Control all non-conformance reports and ensure remedial ac-tions are taken
• Complete site quality control instructions and action remedial responses
• Review specifications and undertake relevant training to the site QC inspectors
• Monitor the implementation of the approved site QC plans for subcontractors
• Coordinate and complete the approval of the sites QC technical submittals
• Coordinate with construction Managers on all quality issues
• Monitor quality and safety Key Performance Indicators for all site subcontractors
• Chair the QA/QC meetings with projects subcontractors QC personnel
• Elaborating inspection and test programs
• Ensure the Safety is adhered to at site
• Assure all technical documents relative to site quality control are current status

Quality & HSE Manager at CB&I Lummus
  • Egypt - Cairo
  • February 2007 to September 2011

Responsible for Quality and HSE Management by:
 The establishment, implementation and maintain of the Company Quality Management System.
 Ensuring that all projects are executed with appropriate HSEQ programs.
 Creating a culture which fosters Knowledge Management and a Learning Organization.
 Maintaining and improving the accessibility of the Company Management System.
 Performing system audits.
 Preparation and Arrangement for certification for ISO 9001, ISO 14001 & OHSAS 18001.
 Coaching the departments in HSEQ aspects.
 Coaching the Projects for Total Quality Management.
 Monitoring HSEQ performance on the projects.
 Coordinating / facilitating Company improvement initiatives;
 Facilitating the continual improvement process;
 Facilitating the use of the Lessons Learned and Best Practice processes to improve project performance;
 Enhancing internal communication.

Project HSEQ Manager for Nagarjuna Refinery Project
(Cuddalore - India):
 Administering quality related matters and providing support for quality issues on the project.
 Developing the Project Quality Plan.
 Monitoring and improving the effectiveness of the Project Quality System.
 Scheduling and facilitating internal Project Quality System Audits and Technical Audits
 Planning, executing and reporting Quality Surveillance Audits
 Reviewing Quality Plans and Inspection and Test Plans (ITP’s) to be implemented by vendors and subcontractors.
 Monitoring vendor and sub-contractor quality surveillance and inspection programs and results to insure compliance with the project requirements.
 Collecting Lessons Learned during and for use on the project
 Interface with Client for QA reviews, audits, etc
 Initiate/facilitate Project Discipline Audit Cycle
 Verify proper Project close-out (incl. TQM)
 Verify development and implementation of the HSSE Plan (incl. Occupational Health)
 Monitor HSSE Management Audits
 Monitor Site HSSE Subcontractor Audits

Deputy QA/QC Manager at TAV Tepe Akfen
  • Egypt
  • December 2004 to December 2006

Designation: DEPUTY QA/QC MANAGER

Responsible for:

· The implementation of the Company’s Quality Management System in accordance with the Quality Plan.

· Preparation, implementation and updating of the Project Quality Plan and procedures.

· To investigate and give approval for the selection of key materials and subcontractors when required.

· The surveillance of quality control works, planning and implementation for the inspections, required tests and ensure preparation of required documentation.

· To inform and advise the Managers, Superintendents of Civil, Mechanical, Electrical and Finishing Installations about potential or existing quality problems that may require action.

· To review the quality and give approval for the materials before ordering materials and equipment coming to site.

· To prepare Reports about non-conforming materials and construction, and to ensure that non-conforming materials and construction are not incorporated into Work.

· To ensure that all informational reports, certificates, approvals and control forms required for the start of work are ready prior to the work start.

· The planning and implementation of inspections and tests.

· To ensure calibration and control of on-site measuring and test equipment and devices used to determine conformance to specified requirements.

· To review material test reports and to assure that the specified tests are performed in an adequate number and results are in conformance with the specification requirements.

· To ensure and control that works are carried out according to the design defined by the Design Consultant.

· Delegation the responsibility for verifying the implementation of the Project Quality Management System, identifying quality problems and promoting their solution.

· Ensuring that a quality system is established and maintained in accordance with ISO 9001.

· Reporting on the performance of the quality system to the top management

Senior Project Engineer at KHALDA PETROLEUM CO.
  • Egypt
  • September 2003 to September 2004

"Q.C. Management for the Construction Work in the petroleum and gas plants."

- Accommodations, Internal service roads, Pipe lines, Workshops, Stores, Tanks, ... etc.

Project Engineer "OWNER REPRESENTATIVE". at EDF EGYPTIAN ENGINEERING CO.
  • Egypt
  • January 2001 to June 2003

EAST PORT SAID POWER PLANT project.
2*341 MW UNITS

Owner: ELECTRICITE' DE FRANCE "EDF"

Main contractor: Joint venture between: SAE International (French Construction Company).
& Orascom Construction Industries.
Subcontractor: Orascom Construction industries.

Responsible for:

· Follow up the execution of the contract through the reference documents, (contract; GTS; DTS; BOQ; the exaction drawings; the work procedures;...).

· Control the civil work activities (earth works, pilling works, concrete works, steel structure, finishing, embedded parts, laboratory and site tests for the concrete, piles and other tests.

· Control the preloading and soil improvement works and tests.

· Control the slipform for the construction of the chimney concrete shaft.

· Control the execution of the steel flue (construction, welding and insulation works).

· Control the materials of the steel flue, turbine generator foundations, electrical and control building, (anchors and embedded parts) for storage and handing over.

· The following up and control of the contractors' quality plan and schedules.

· Review the civil work contractors (CWC) working procedures and schedules.

· Attendances and Management for the technical and schedules meetings.

· Control of the measurements prepared by design offices or the contractors.

· Prepare estimations (quantities and prices according to the BOQ) for the extra jobs.

· Writing the letters and mails.

· Follow up the documentation for each WU: Drawings, mails, quality plans, tests, certificates.

· Preparing the progress reports.

· Monitoring of the quantities and updating the computerized files.

· Respect of the safety rules and procedures.

· Coordination between the civil, electromechanical and commissioning works.

Civil Construction Project Supervisor. at SAMSUNG ENGINEERING CO., LTD.
  • Egypt
  • August 1998 to September 2000

Responsible for: THE QUALITY CONTROL AND SCHDUALE CONTROL FOR ALL THE SITE CONSTRUCTION CIVIL WORK;
In the following large size industrial and petrochemicals projects.

*** SIDPEC POLYETHYLENE project. ***
200, 000 MT/Y Polyethylene plant

Owner: SIDI KERIR PETROCHEMICALS CO.(SIDPEC) "SPC"

Main contractor: SAMSUNG ENGINEERING CO., LTD "SECL"
Subcontractor: "PETROJET"

Exploitation cost: 222, 000, 000$

Work duration: Mar. 1999 ~ SEP. 2000


*** Western Desert Gas Development project. *** (WDGD)

Owner: KHALDA PETROLEUM CO.

Main contractor: SAMSUNG ENGINEERING CO., LTD "SECL"
Subcontractor: "PETROJET"

Exploitation cost: 372, 000, 000$

Work duration: Aug. 1998 ~ Mar. 1999

Senior Construction Civil Engineer at The Petroleum Projects And Technical Consultation Co."PETROJET"
  • Egypt
  • August 1996 to August 1998

In the following large size industrial and petrochemicals projects.

*** SIDPEC ETHYLENE project. ***
300, 000 MT/Y Ethylene plant

Owner: SIDI KERIR PETROCHEMICALS CO. (SIDPEC) "SPC"

Subcontractor: "PETROJET"

Exploitation cost: 277, 000, 000$

Designation: Senior Construction Civil Engineer.

Responsible for:
· All the mobilization and construction work as an assistant for the project manager.
· Preparation for the work shop drawings and erection drawings for the steel structures of SIDPEC Ethylene project as a senior engineer in the technical office of "Maadia work shop".
· Technical evaluation of bid for the sporting playgrounds project in the Egyptian petrochemical Co.

Work duration: Nov. 1997 ~ Aug. 1998


*** AMMONIA / UREA FERTILIZER project. ***
ABU QIR III

Owner: ABU QIR FERTILIZER CO.

Main contractor: UDHE GMBH "German Construction Co."
Subcontractor: "PETROJET"

Exploitation cost: 1, 100, 000, 000 L.E.

Designation: Construction Civil Engineer.
Responsible for:
· Supervising the piles work (3400 piles miscellaneous types).
· Construction work for the main pipe rack.
· Construction work for the main substation building.
· Construction work for underground cable trench.

Work duration: Aug. 1996 ~ Nov. 1997.

DESIGNER CIVIL ENGINEER at ENGINEERING CONSULTING CORPORATION
  • Egypt
  • October 1995 to August 1996

Responsible for:

· Design for many villas and residence buildings.
· Maintenance for great residence building in ALEX.

Education

Master's degree, Projects Quality Management
  • at Alexandria University
  • May 2012

M.Sc. in Projects Quality Management, Alexandria University, (undergraduate)

Diploma, Construction Projects Management
  • at Alexandria University
  • May 2007

Diploma in Construction Projects Management, Alexandria University 2007

Bachelor's degree, Civil Engineering
  • at Alexandria University, Faculty of Engineering
  • May 1995

- Graduation Project: Contracts, Specifications & Construction Projects Management. - Construction Projects Management Diploma (Under graduation). - IRCA Certified as an Internal Auditor for the Quality Management System (ISO 9001: 2000)

Specialties & Skills

Safety Management Systems
Process Improvement
Change Management
Construction Management
Quality Management
IRCA Certified as an Internal Auditor for the Quality Management System
ISO 9001: 2008; ISO 9000, ISO 9004, ISO 14001, ISO19011, ISO/IEC 17025
AUTO CAD; EXCEL; WORD; POWER POINT; STAAD; SAP; PRIMAVERA; M.S. PROJECT
QA/QC, Specifications & Construction Management

Languages

English
Expert
Arabic
Expert

Training and Certifications

The Lummus way Quality system (Training)
Training Institute:
LUMMUS
Date Attended:
February 2007