ahmed ismail, TERMINAL DEPOT MANAGER

ahmed ismail

TERMINAL DEPOT MANAGER

Totalenergies

Location
Egypt - Cairo
Education
Bachelor's degree, metallurigical
Experience
19 years, 4 Months

Share My Profile

Block User


Work Experience

Total years of experience :19 years, 4 Months

TERMINAL DEPOT MANAGER at Totalenergies
  • Egypt - Suez
  • My current job since May 2021

Job's scale :
- The Depot has 8 KM3 of storage capacity with average annual throughput volume of 0.5
Million M3.
- Products: Gasoline (2 Grades) & Gas Oil.
- Subordinates & Team: 43 employees (9 Staff + 34 Outsourced).
- The Depot is operated in 3 shifts (24/7).
- Average Annual OPEX Budget: 1 Million USD.
- Average Annual CAPEX budget: 3.5 Million USD.

depot deputy manager at total egypt
  • Egypt - Cairo
  • March 2019 to April 2021

Job's scale :
-The depot consists of two locations, have 73 staff (12 of them are TOTAL statutory
staff), the operation through 2 shifts (24 /7)
-The Depot have 10 vertical above ground storage tanks of a total capacity 11, 000 M3.
-The tanks are split on two locations 25 meters apart, storing two products Gasoil (4
Tanks), Gasoline 92 (4 Tanks) and Gasoline 95 (2 Tanks)
-The annual dispatching capacity is over 1 million Tons in 2016
-Receive products from Pipeline company in via two dedicated pipeline

Depot & Into Plane Airprot Manager at total egypt
  • Egypt - Marsa Alam
  • December 2014 to February 2019

a. develop a well-motivated team of staff at RMF committed to safety, efficiency, performance and
teamwork.
b. lead, manage, and be accountable for the Fuel Farm Operations, assets and the manpower in Fuel
c. Managing a multicultural work force Management for obtaining the best results while working for
their development and growth. Carrying out, Training Need Analysis and implementation, Competency
Assessment, Job Design, Performance appraisals, etc.
d. Quality Management in all aspects of working but not limited to quality control, q Improvements,
statistical analysis, etc.
To continuously and actively assess and manage all risks associated with our operations, especially
those associated with “Change” issues and
non-routine activities.
f. Risk/Safety Management including accidents & command activities (Failure, Prevention, Planning &
Corrective measures)
g. Handling & resolving operational emergencies of RMF ’s activities.
h. Developing a conducive work environment by inculcating good ethical work practices in dealings
within and outside RMF work force, including openness and fairness in all interactions

Assistant Superintendent at chevron egypt
  • Egypt - Marsa Alam
  • December 2012 to November 2014

1- Assist the Superintendent in supervising the preventive maintenance schedule working with the
maintenance team for both facilities; into plan & storage depot.
2- Direct, lead and supervise the day-to-day fuelling operations at the Apron, Monitor and ensure
adequate strategic stock inventory to service customers at all times, Plan and monitor the into-plane
deliveries to ensure no recorded delays and smooth operations, with a view to achieving customer
satisfaction, safety, product integrity and efficiency.
3- Cooperate with the superintendent in following up the facility action plan for closing all gaps identified
from previous audits (OE, risk
assessment, inspections, external local authority inspections…etc)
4- Work with superintendent on following the deployment of targeted OE processes in line with Chevron
deployment plan and score card. Review technical standards and manufacturers recommendation required
for the annual/ monthly preventive maintenance plan.
5- Review daily inventory management reconciliation for both product and facility warehouse including
investigating out of limit gain/ losses cases and ensuring availability of critical spare parts above their
minimum stock required to ensure smooth daily operations and reduce refuellers breakdown time if any.
6- Ensure that all plant and equipment are properly maintained and made available for operations through
the implementation of planned maintenance programs and active troubleshooting & repairing of
breakdowns.

Site Qa/Qc Manager at ARCHIRODON CONSTRUCTION OVERSEAS - HALUL-QATAR
  • Qatar - Doha
  • November 2009 to November 2012

Client: Qatar petroleum (QP)
Consultant: GL
Contract Amount: US$ 200, 000, 000.
Location of Project: Halul Island-offshore, State of Qatar
Description of project Works: - EPIC of New Desalination Plant and Potable Water
Storage Tanks at Halul Island

Welding & Fabrication Engineer at ARCHIRODON CONSTRUCTION OVERSEAS- UAE
  • United Arab Emirates - Abu Dhabi
  • December 2008 to November 2009

Ruwais 3rd NGL Train Project, Marine Works at GASCO’s Facilities, Abu Dhabi,
U.A.E
Client: Abu Dhabi Gas Industries Co. (GASCO)
Consultant: GASCO, Abu Dhabi
Contract Amount: US$ 140, 600, 000(subcontract)
Description of project Works:
Engineering Procurement and Construction for:(Steel Jetty with two berths including
topsides and buildings/Dredging./Seawater intake pipelines and bell mouths).

Qa/Qc Engineer & Punch List Coordinator at ALGHANIM INTERNATIONAL CONTRACTING -KUWAIT
  • Kuwait
  • December 2007 to November 2008

emergency power plant 2008(epp008)1000 Megawatt (simple cycle)
This project one of the largest and fastest power project in gulf area, total cost 1 billion
us$ because of it was executed in 6 month only which includes commercial commissioning.
Main client: Ministry Of Electricity And Water(KWUAIT)

Mechanical QA QC Engineer at KHARAFI NATIONAL KUWAIT
  • Kuwait - Al Ahmadi
  • January 2007 to November 2007

Projects: upgrading of facilities and reallocation of gathering center no 3, 4, 5, 7, 8, 21, 23
and Bs 140 and 150
This project long term duration and considered one of the largest implement for all pipe
line and tanks since its first construction in 1975, the project value around 850 million
USD (project no EF1500)

Mechanical Inspection Engineer at Alexandria petroleum maintenance PETROMAINT-Egy
  • Egypt - Alexandria
  • January 2005 to January 2007

Projects:
A- Maintenance, replacement, alteration and repair of different types of tanks (fixed roof /
floating roof double deck )such as tank 09/02/14 (76.6 Mt/12Mt /34.5Mt Dia)for the bottom
plates, zero welds, roof compartment, cooling ring system, close drain system, roof drain
system, drain sumps, shell repairs, fire fighting system, cathodic protection anodes
B- Maintenance of arrow separators at such as arrow separators/ cluster (13) separator/
production separator T.B. 8/2 & 6/1
C- Fabrication Of fir fighting system of tank 03 at fieran terminal station.
D- Fabrication Of Diesel Tank shell nozzles (Inlet, Outlet, Drain, Fire Fighting & Cooling Ring).
E-Fabrication Of Pipes Upgrading Of Tank Battery 6/1 Which Connect 3 Separators To New
Manifold, Petreco Plant, Gas Scrubber And Flare. F- Fabrication of the connections of two
booster pumps within suction line 10'' and delivery line of 8'' in tank battery 6/1.
G- Fabrication of two new manifold which will feed to the tank battery 6/1, 8/2 and 8/1.
H- Fabrication of the API skimmer gratings at the petreco plant.
I- Fabrication of two pipe lines 12'' from 6/1 to 8/2. & 6''/10 km length at ras gara field

Education

Bachelor's degree, metallurigical
  • at Suez Canal University
  • May 2003

metallurgical engineering from petroleum and mining engineering faculty