Wimax Integration & broadband transmission Teams Leader
Motorola
مجموع سنوات الخبرة :3 years, 2 أشهر
Was responsible for leading 8 I&C teams in the field to reach the
required target.
ð Was responsible for providing all the needed technical support to
insure reaching the required target in time.
ð Controlled sites execution process within time and quality.
ð Attended the required meetings with customer.
ð Was responsible for arranging the weekly implementation plan to
meet customer’s needs.
ð Was responsible for arranging the implementation teams.
ð Was responsible for arranging and submitting daily work content.
ð Was responsible for supervising the installation quality.
ð Was responsible for reporting the daily field actions to the PM.
ð Was responsible for arranging the work area according to customer
requirements.
ð Fed back the quality problems to execution team.
ð Was responsible for following customer and owner quality standards
and make sure to satisfy them.
ð Periodically make performance evaluation to reach the required
target.
ð Actually executed and successfully delivered:
Ø Installation, commissioning and acceptance of about 60 WIMAX
SAAP sites in Makkah region. (ATHEEB account).
Ø Installation, commissioning and acceptance of 120 MW links in
Makkah region (NEC 1+0, 1+1, 2+0 EXPIC). (ATHEEB
account).
Ø Makkah MW backbone project (BB) including the installation
and commissioning of 12 MW links XPIC HP. (ATHEEB
account).
Ø Installation, commissioning and acceptance of 40 MW broadband
links (4+0) with CX2600 in Dammam and Hefouf region. (Zain
account)
ð Left the project after full completing Makkah WIMAX network.
ð Received sufficient official appreciation from the customer and my
PM.
Participated as Telecom system installation and integration engineer for the following projects;
1. Etisalat - Huawei rollout project in Egypt. (2G, 3G and MW).
2. Etisalat - Huawei IP-DSLAM and OSN deployment project in Egypt. (ISP project)
Achieved; PMI Membership. PMP credential certified license:1424321 PgMP.
Grade: Excellent with honor. Percentage: 94.9% (the highest ever grade in the Faculty) GPA: 3.83 Rank : First Graduation Project: (OF-CDMA) (Optical Fiber-Code Division Multiple Access) Project Grade: Excellent