acting as the main technical adviser on a construction site for subcontractors, crafts people and operatives;
•
setting out, levelling and surveying the site;
•
checking plans, drawings and quantities for accuracy of calculations;
•
ensuring that all materials used and work performed are as per specifications;
•
overseeing the selection and requisition of materials and plant;
•
agreeing a price for materials, and making cost-effective solutions and proposals for the intended project;
•
managing, monitoring and interpreting the contract design documents supplied by the client or architect;
•
liaising with any consultants, subcontractors, supervisors, planners, quantity surveyors and the general workforce involved in the project;
•
liaising with the local authority (where appropriate to the project) to ensure compliance with local construction regulations and by-laws;
•
liaising with clients and their representatives (architects, engineers and surveyors), including attending regular meetings to keep them informed of progress;
•
day-to-day management of the site, including supervising and monitoring the site labor force and the work of any subcontractors;
Page 2 of 4
•
planning the work and efficiently organizing the plant and site facilities in order to meet agreed deadlines;
•
overseeing quality control and health and safety matters on site;
•
preparing reports as required;
•
resolving any unexpected technical difficulties and other problems that may arise.
•
In the following projects:
Kingdom Tower (Tallest high-rise building on the world) from June2015 till now Owner : Kingdom Holding Company
Consultant : Dar El-Handsa
Contractor : Saudi Bin Laden Group (SBG)
Total Price: 1, 2 Billion $ Expansion of King Abdul-Aziz International Airport from April 2014 till May 2015 Owner : Ministry of Finance
Consultant : Dar El-Handsa Contractor : Saudi Bin Laden Group (SBG ) Total cost: 7.2 Billion $ 1st Ring Road from December 2013 till March 2014
Owner : Ministry of Finance
Consultant : Dar El-Handsa
Contractor : Saudi Bin Laden Group (SBG)
Total cost: 500 Million $
•
setting out, levelling and surveying the site;
•
checking plans, drawings and quantities for accuracy of calculations;
•
ensuring that all materials used and work performed are as per specifications;
•
overseeing the selection and requisition of materials and plant;
•
agreeing a price for materials, and making cost-effective solutions and proposals for the intended project;
•
managing, monitoring and interpreting the contract design documents supplied by the client or architect;
•
liaising with any consultants, subcontractors, supervisors, planners, quantity surveyors and the general workforce involved in the project;
•
liaising with the local authority (where appropriate to the project) to ensure compliance with local construction regulations and by-laws;
•
liaising with clients and their representatives (architects, engineers and surveyors), including attending regular meetings to keep them informed of progress;
•
day-to-day management of the site, including supervising and monitoring the site labor force and the work of any subcontractors;
Page 2 of 4
•
planning the work and efficiently organizing the plant and site facilities in order to meet agreed deadlines;
•
overseeing quality control and health and safety matters on site;
•
preparing reports as required;
•
resolving any unexpected technical difficulties and other problems that may arise.
•
In the following projects:
Kingdom Tower (Tallest high-rise building on the world) from June2015 till now Owner : Kingdom Holding Company
Consultant : Dar El-Handsa
Contractor : Saudi Bin Laden Group (SBG)
Total Price: 1, 2 Billion $ Expansion of King Abdul-Aziz International Airport from April 2014 till May 2015 Owner : Ministry of Finance
Consultant : Dar El-Handsa Contractor : Saudi Bin Laden Group (SBG ) Total cost: 7.2 Billion $ 1st Ring Road from December 2013 till March 2014
Owner : Ministry of Finance
Consultant : Dar El-Handsa
Contractor : Saudi Bin Laden Group (SBG)
Total cost: 500 Million $
November 2012
To November 2013
Site Engineer
at Hussein Sabbour Consulting Engineering Bureau
Location :
Egypt - Cairo
Responsibilities were in the following areas and activities:
• Create and hand out schedules for construction staff working in the field
• Perform field quality control observations and assessments
• Inspect and assess the quality of materials being used for construction projects
• Calculate the quantity of material, supplies and equipment needed for each individual project
• Verify and approve invoices of purchases
• Oversee the work of field staff to ensure efficacy of work procedures
• Ensure compliance to project specifications
• Make sure that all construction activities are being carried out in accordance to preset safety rules
• Ensure availability of resources and materials at all times
• Provide recommendations for repair work.
• Perform continuous evaluation on trends and ensure that preventative maintenance is managed at each stage of the project
• Survey maps and blueprints prior to creating construction plans
• Determine project feasibility and direct all resources to the site in a time efficient manner
• Provide technical advice to field staff in order to ensure that construction procedures are being carried out properly
• Identify construction constraints and plan and carry out measures to counter them
• Prepare public reports such as bid proposals and environmental impact statements
• Test sites to ensure appropriateness for construction project • Prepare period reports and assessments for each project phase
• Create and hand out schedules for construction staff working in the field
• Perform field quality control observations and assessments
• Inspect and assess the quality of materials being used for construction projects
• Calculate the quantity of material, supplies and equipment needed for each individual project
• Verify and approve invoices of purchases
• Oversee the work of field staff to ensure efficacy of work procedures
• Ensure compliance to project specifications
• Make sure that all construction activities are being carried out in accordance to preset safety rules
• Ensure availability of resources and materials at all times
• Provide recommendations for repair work.
• Perform continuous evaluation on trends and ensure that preventative maintenance is managed at each stage of the project
• Survey maps and blueprints prior to creating construction plans
• Determine project feasibility and direct all resources to the site in a time efficient manner
• Provide technical advice to field staff in order to ensure that construction procedures are being carried out properly
• Identify construction constraints and plan and carry out measures to counter them
• Prepare public reports such as bid proposals and environmental impact statements
• Test sites to ensure appropriateness for construction project • Prepare period reports and assessments for each project phase
August 2011
To August 2012
Site Engineer
at Rowad modern engineering
Location :
Egypt - Cairo
acting as the main technical adviser on a construction site for subcontractors, crafts people and operatives;
•
setting out, levelling and surveying the site;
•
checking plans, drawings and quantities for accuracy of calculations;
•
ensuring that all materials used and work performed are as per specifications;
•
overseeing the selection and requisition of materials and plant;
•
agreeing a price for materials, and making cost-effective solutions and proposals for the intended project;
•
managing, monitoring and interpreting the contract design documents supplied by the client or architect;
•
liaising with any consultants, subcontractors, supervisors, planners, quantity surveyors and the general workforce involved in the project;
•
liaising with the local authority (where appropriate to the project) to ensure compliance with local construction regulations and by-laws;
•
liaising with clients and their representatives (architects, engineers and surveyors), including attending regular meetings to keep them informed of progress;
•
day-to-day management of the site, including supervising and monitoring the site labor force and the work of any subcontractors; In the following projects: Toyota Show Rooms, Cairo, Egypt. Owner : Toyota Consultant : RAK Contractor : Rowad Modern Engineering (RME) Total cost: 42 Million EGP
•
setting out, levelling and surveying the site;
•
checking plans, drawings and quantities for accuracy of calculations;
•
ensuring that all materials used and work performed are as per specifications;
•
overseeing the selection and requisition of materials and plant;
•
agreeing a price for materials, and making cost-effective solutions and proposals for the intended project;
•
managing, monitoring and interpreting the contract design documents supplied by the client or architect;
•
liaising with any consultants, subcontractors, supervisors, planners, quantity surveyors and the general workforce involved in the project;
•
liaising with the local authority (where appropriate to the project) to ensure compliance with local construction regulations and by-laws;
•
liaising with clients and their representatives (architects, engineers and surveyors), including attending regular meetings to keep them informed of progress;
•
day-to-day management of the site, including supervising and monitoring the site labor force and the work of any subcontractors; In the following projects: Toyota Show Rooms, Cairo, Egypt. Owner : Toyota Consultant : RAK Contractor : Rowad Modern Engineering (RME) Total cost: 42 Million EGP
Share on Facebook
Share on Twitter
Share Via Email