• Alsulaiman Mall (Structural steel 10000m²)
Preparing the BOQ, Specifications, time schedule plan, Review shop drawing and supervising works from scratch (demolishing the existing building, excavation, construction of concrete
And steel Structure and finishing the main building)
• Golnar hotel Renovation 3*
Planning, Review shop drawing and supervising finishing works from scratch.
Cairo AirPort, Egypt
• Saudi Air lines VIP Lounge (Al Fursan)
Preparing shop drawing and supervising finishing works from scratch.
• Saudi Food and Drug Authority Branch Office (Project Value is 78 million SR)
Planning, Supervising Construction progress from scratch and making coordination between
The intersecting activities and leading the Project Schedule aiming to complete the Project in time within the Project budget.
Planning & Senior Site Engineer
• Omran General Hospital (100 Beds) (Project Value is 127 million SR)
Planning, Supervising Project progress and making coordination between the intersecting activities and leading the Project Schedule aiming to complete the Project in time.
Supervising Constructions from scratch, preparing the Shop drawing for site layout with infra-structure coordination, supervising its execution, supervising mechanical installation of granite cladding for façades
• Unayzah Technical College (Project Value is 109 million SR)
Septic Tank, Main Fence Constructions, Preparing the Shop drawing for site layout with infra-Structure coordination and supervising its execution.
Jul 2011 - May 2012
• Coral Sea Resort (Sensatori) 5*
Renovation of Royal and presidential Villas (Project Value is 5 million LE)
Supervising Constructions for Extensions and finishing work from scratch, Landscape and Electromechanical Works.
Nov 2011 - May 2012
• Eurogypt Contractors chairman’s villa renovation and Extension.
(Project Value is 1 million LE)
Oct 2010 - Jun 2011
• Coral Sea Resort (Sensatori) 5* (Project Value is 38 million LE)
Supervising finishing work from scratch in the following areas:
1. Main Lobby.
2. Main Gate.
3. Arabian restaurant.
4. Italian restaurant.
5. Shopping Arcade.
6. Diving Centre.
7. Electrical Works for main lobby, main Gate, Arabian, Italian Rest., shopping Arcade and Diving Centre.
8. Renovation of Japanese Restaurant (Teppanyaki).
9. Wooden pergola.
10. Alucobond Cladding for panoramic elevator and hotel entrance canopy
Dec 2006 - Oct 2010
Site, Draft & Q.S. Engineer
• Melia Sharm hotel 5*. (Project Value is 28 million LE)
Supervising finishing work from scratch in the following areas:
1. 165 guest rooms.
2. Main building and public areas.
3. Two Presidential villas and Royal villa.
4. Four Wooden pergolas.
5. Pool Bar.
6. Fish restaurant.
7. Kids club.
Dec 2007 - Aug 2009
Site, Draft & Q.S. Engineer
• Tiran Island hotel 4*. (Project Value is 9 million LE)
Supervising finishing work from scratch in the following areas:
1. Amphitheater.
2. Multi-Purpose Hall.
3. Hardscape.
4. Business center.
5. Beach Restaurant and Bar Counter.
6. Out Door Bar (Pasha Bar).
Oct 2007 - Dec 2007
Site Engineer
• Savoy hotel 5*. (Project Value is 4 million LE)
Supervising finishing work from scratch in the following areas:
1. 65 guest rooms.
2. Wooden pergola.
3. Two Beach Bars and Terrace bar.
4. Specialty Restaurants and Mandarin bar In Soho square.
Dec 2006 - Dec 2007
Site Engineer
• Sol Syren hotel 4*. (Project Value is 11 million LE)
1. All guest rooms (205 rooms …furniture work).
2. Main building and public area.
3. Restaurant and bar on the main swimming pool.
4. Four Wooden pergolas.
• Graduation Project : Survey • Graduation Project Degree : Very Good