Quality Control Manager for Tahya Misr Terminal at Damietta Port
Quality Control Manager of Julius Nyerere Hydro Power Project 2115 MW
Main Dam
Power Waterway System
PowerHouse
Saddle Dams
Permanent Bridge
Permanent Roads
SwitchYard
Employer Operation Village
Quality Control Manager for the Three Tunnels under Suez Canal Port Said ( Sinai ) 17 Billion EGP The three tunnels (two Roadways and one Railway) under Suez Canal (Port Said), an industrial zone west of the Gulf of Suez, are under construction simultaneously with the excavation of the new canal. The road tunnels will reach 48 m depth, with 3, 187 m length and 10.8 m-diameter each with two 3.75 m-wide lanes. The railway tunnels will reach a 48 m depth, with 6, 705 m length and five ventilation shafts.
The state-owned Arab Contractors Company (AC) and the private Orascom Construction Industries (OCI), under the supervision of the Armed Forces Engineering Authority, will construct the three tunnels using TBMs.
Herrenknecht was awarded the TBM contract for the three tunnels
1- Ensure assigned projects are completed within budgets and schedules
2- Manages programs and projects.
3- Monitors progress & ensure quality of projects
4- Manage the project team including architects engineers, consultant & construction managers
5- Develop schedules &budgets for assigned projects
6- Identify & evaluate alternation solutions.
7- Ensure that projects managers work cooperatively with the appropriate Client Service Directors
1- Suez Thermal Power Plant
Suez thermal power project is designed to include a 1×650 MW steam thermal power plant to interconnect with National Unified Power System (NUPS) through a 220 KV GIS switchyard. The power block is comprised of one Rankine cycle turbine generator unit with a nominal rated capacity of 650 MW. The unit is capable of generating rated capacity using natural gas, residual (mazout) oil, or a combination of both. The unit station arrangement includes an enclosed turbine building, an open boiler building, a control room, and all associated structurers and facilities
Finishing of National Bank Of Egypt Towers (Cairo Plaza)
4 Star Hotel with area 500000 sq ft and cost of 120, 000000 dhs
- Mazaya towers 3B + G + 39 + M ( Residential & Commercial Bldgs )
Two towers Icon 1 & Icon 2 for an area 449, 000 sqft in Jumeirah Lake Towers ( JLT )
Finishing and hand over 123, 000000 dhs per tower
- Centre Point Logistics Ware House Jabal Ali Free Zone Dubai
Super structure ( under construction ) 600, 000000 dhs
Finishing Works:
1-for Water Pumping Stations
2- Luxor Airport
3-Central Library - Cairo University
Minister of Finance of Algeria
Greatest Cairo Metro Line-2, Phase- 2C
1-Moneib Station
2- Sakkiet mekki Station
Bahamas Ultra Light Studios, 6th of October, Dream Land City.
Greatest Cairo Metro Phase 2 B.
Al-Azhar Road Tunnel. ( Attaba Shaft)
Faculty of Medicine
Hospital of Obstetrics and Gynecology.