Resident Engineer
Dar Al-Handasah Consultants (Shair and Partners)
Total years of experience :32 years, 4 Months
for the Holy Haram, Saudi Arabia.
Supervision of construction for an extension to the Makkah Holy Haram to
accommodate additional 800, 000 worshipers, comprising a new building of 4
praying levels with a capacity of 300, 000 worshipers, connected at its ground,
first and roof floors to the First Saudi Extension of Makkah Haram, and
includes a basement level for electromechanical services; state-of-the-art
technology in natural and artificial climate and lighting controls; security,
crowd management, and sound distribution and control systems; structural
health monitoring sensors; cleaning equipment; interactive signage; and high
end interior finishing works. The project provides internal courtyards covered
with 12 operable skylights, 6 fixed ones, 4 fixed domes of 18 m diameter
each, and one 36 m diameter sliding dome above the 24 m wide and 26 m
high ceremonial spine connecting the north and south piazzas through a 59 m
wide main gate at the north end flanked by 2 new minarets (135 m high each)
on its left and right sides and a 30 m wide gate at the south end. The project
also comprises 194, 000 m² external praying piazzas accommodating 314, 000
worshipers with 2, 500 toilet cubicles and 850 ablution points beneath them; a
service building of 6 overlapped radial steps accommodating 8, 750 toilets,
5, 370 ablution points, 2 helipads, service and solid waste management
facilities, authorities’ offices and a 110, 000 m² praying area at its roof level for
165, 000 worshipers; several bridges (total of 42, 750 m²) linking the new
building to the service building and to the existing Holy Haram; a service road
below the external piazzas and dedicated service culverts carrying all
infrastructure utility networks.
• Follow up the site works progress and time schedule.
• Follow up the administration issues.
• Coordination between all trade, also between dar team and contractor.
• Held the periodic meetings, and follow up the related requirements.
• Preparing the periodic reports to the higher managers.
Project manager, Makarem mena hotel, of about 4400 mt2, contains (1 basement - Gr. Floor - 4 typ. Floors - roof) of about 66 million rivals
Om Alqura hotel, of about 3400 mt2, contains (3 basements -Gr. Floor- Mezz. Floor- 1st. floor-12 typ. Floors - roof) of about 100 million rivals
- Follow up the site works progress and time schedule.
- Follow up the administration issues.
- Coordination between all trade, also between supervision team and contractor.
- Held the periodic meetings, and follow up the related requirements.
- Preparing the periodic reports to the higher managers.
Project manager, 4 stars Hotel on pbt no. (194) Central area -Almadina Almonaoura, of about 1128 mt2, contains (3 basements - Gr. Roor- Mezz. Floor-13 typ. Floors - roof) of about 60 million riyals.
- Follow up the site works progress and time schedule.
- Follow up the administration issues.
- Coordination between all trade, also between supervision team and contractor
- Held the periodic meetings, and follow up the related requirements.
Senior Consultant Engineer, Albashiria hotel on plot no. (2095) Central area -Almadina Almonaoura, of about 3500 mt2, contains (3 basements - Gr. Ftoor- Mezz. Floor- 1s*, floor-12 typ. Floors - roof) of about 150 million rivals.
- Inspect and follow up the structural site works.
- Review shop drawings and payments.
- Preparing progress reports and follow up time schedule for structural works.
- Inspect and follow up some of architectural items.
Structural consultant engineer International coastal road, distance between (Ras Elbar - Gamasa) with 20 km length
- Re-planning and development of old Cairo.
- Egyptian embassy and Ambassador's residence in Riyadh
- Industrial region in Aswan
- Irrigation line of Tora prison's farm
- Some other small projects