Senior Architect / Project : Blue waters island
Al Shafar General contracting
مجموع سنوات الخبرة :19 years, 7 أشهر
- Development of shop drawings for approval and coordination - Leading a team of architect - Identification of RFI's. for any discrepancies/contradictions - Follow up with material submittals and approval from the consultant - Preparation and submission of technical reports. - Manage all Architectural / landscape packages with subcontractors and coordination - Reviewing the deliverables of subcontractors prior to consultant submission - provide the technical support to the construction team
Mohamed Bin Rashid Library /senior architect
coordinate between all disciplines
Responsibilities
Project Coordinator for 3 packages in GEM project as following:
1-Roof expanded metal panels (37 million $ ) - By Alico / Pridedmann (Germany)
The GEM project will be covered by inclined aluminum metal lath panels as the design intent and part of these panels will be movable by motorized parts so the telescopic gantry can go over the digital stream glass roof. Coordination between these metal lath panels and fall arrest system on the roof and lightning protection system.
2-Pre-tension s/s cable facades (11million euro)-By Roschmann (Germany)
This system used in the project in the pyramid end gable façade to provide clear view to the pyramids based on pre-tension stainless steel cables (30mm diameter) fixed to steel truss and stainless steel clamps will be fixed to the glass panels.
In the Cairo light court is pyramid shape subtracted from the building and has 2 inclined glass facades based on pre-tensions stainless steel cable system and Glass Bridge fixed to the 2 inclined facades.
3- Maintenance system / fall arrest system on the roof plan (10.6million euro)-By XSPlatforms(Nederland)
The maintenance and cleaning system will rely on monorail system and telescopic gantry, the monorails system will used for all facades and inclined facades with mullion guide rail and restrain pins and lighting fixture replacement in the area without gantry or catwalk area.
The fall arrest system will be used on the roof mesh panels via stainless steel brackets with life line system according to the British code as a life line system for the labors are working on the roof
Responsibilities
• Prepare information regarding design, specifications, materials and equipment
• Direct the production of construction documents, drawings and specifications
• Coordinate schedules and workloads
• Review architectural documents for potential conflict with other disciplines
• Generally act as the leading individual contributor and coordinator of design problem-solving
• Responsible for overseeing that all necessary testing is completed and subsequent information is reported
• Built CAD drawings (2D & 3D ) based on information provided by customers and engineers
• Prepared engineering support for in-house projects
• Conducted research needed to complete architectural projects
• Completed design work, including schematics and cost estimates for in-house projects
• Provided technical expertise and guidance in preparation of efficient datasets, layouts, work statements & drawings .
• Prepare information regarding design, specifications, materials and equipment
• Direct the production of construction documents, drawings and specifications
• Coordinate schedules and workloads
• Review architectural documents for potential conflict with other disciplines
• Generally act as the leading individual contributor and coordinator of design problem-solving
• Responsible for overseeing that all necessary testing is completed and subsequent information is reported
Executing quality supporting department.
Worked in several projects during this period as Quality controls site engineer & preparing shop drawings to be executed.
Duties include : projects included execution of wide range of concrete structures, finishing
بكالوريوس عماره دفعه ٢٠٠٣