أحمد محسن, facility management engineer

أحمد محسن

facility management engineer

eltaybat

البلد
الإمارات العربية المتحدة
التعليم
دبلوم, project management professionals
الخبرات
12 years, 5 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :12 years, 5 أشهر

facility management engineer في eltaybat
  • مصر - القاهرة
  • أشغل هذه الوظيفة منذ يناير 2015

Management :
• Management of Fit Out projects for office spaces including Civil and MEP retrofit works. Ensuring that projects will be completed as per agreed completion timelines, scope of works and specifications while keeping costs within the approved budget.
• Provides project cost estimates and justifies the detailed BOQ to the client.
• Prepares the project schedule (PERT & CPM Methods through MS Project)
• Leads resolution of site conflicts between client requirements, consultant's comments and
contractor's work delivery (quality and workmanship).
• Monitors the work progress via Earned Value Analysis and reports project development
• comparing planned and actual accomplishment by S-curve and relevant bar charts.
• Hand-over and project closure inclusive of payments update thru various ERP systems.
• Supports the Facility Manager and the technical team in the operations and maintenance of Electrical and Mechanical systems and equipment at site.
• Assists on the delegation and deployment of technical staff on their regular preventive and corrective maintenance.
• Leads technical investigations on system breakdown and anomalies.
• Provides a comprehensive analysis report and enlightens the client on the root cause and recommendations to address the problem.
• Represents the client in organizing and leading meetings with consultants and landlord during project coordination meetings.
Supports the Business Development Team and Tendering / Estimation Manager in participating to tenders and leading compliance to RFPs related to projects, retrofit and fit out work
Technical :
Pumping work :
• Design & installation for all irrigation network ( dripers, pivots & sprinkels )
• Design & installation for pumping stations
• Design & installation for filter station
Water treatment :
• Design & installation of huge reservoirs with automatic dosing pumps to dose chemicals for water treatment ( fe & mg )
• Design & installation of complete unit to treat wells water to be applicable for human use
Mechanical work :
• Heavy equipments
1. Tractors ( lampergini, gohn deer and pelaruse )
2. Agliculture equipments ( planter (monesem ), harvester, spreader, sowing, sprayer, disk harrow and power harrow ( kune, lelly, depetri and euro prima )
• Irrigation equipments :
1- Maintenance for 15 pivot ( valley )
• Generators :
2- operation & maintenance for 32 generator ( perkiens & CAT)
• pumps :
3- maintenance for ( saier & grandfous ) supmersable, booster pumps
maintenance for wells piping

project engineer في fridal
  • مصر - القاهرة
  • ديسمبر 2012 إلى ديسمبر 2014

• Responsible for the on-time, cost effective, and quality conscious completion of fit-out projects.
• In-charge of site coordination meetings to settle conflicts between plan and actual installation condition.
• Formulates recovery plans in cases where equipment delivery and installation work delay occurs. Approval of contractors’ progress reports, variation order and construction progress billing.
• Oversees the daily operations of on-going Civil and MEP fit-out projects.
• Tracks the site team's productivity and ensures that acceptable workmanship is delivered at site by assessing the work done by earned value analysis.
• Approves all manpower, materials & consumables requisitions. Controls site expenses & ensures that these costs are within the allocated budget.
• Interacts with consultants and client representatives to resolve immediate site concerns & to update them on the actual work progress.
• Make them aware of the problems encountered & inform them about the mitigating actions applied to resolve the concern.
• Interacts with other contractors to address all overlapping conflicts and coordination concerns. Ensures that all potential work hindrances are identified and corresponding countermeasures will be part of the work execution plan.
• Conducts site inspection, prepares Bill of Quantities, Scope of Works, Material Estimates and Job Cost Analysis to come up with a cost competitive proposal as for the client.
• Performs Engineering Analysis as support to the company’s Consultancy Dept.
Maintains constant, effective and professional relationship with key clients as part of and to sustain business development for acquiring new projects
• Responsible for making visabilty study for new machines & new production lines
• Design & fabricate new machine, production lines such as ( pepper cutting lines, chille paste prepration & packaging line, dry pepper ( bin dryers )and roasting machines for roasting pepper
• Install new factory ( plumbing, Electro mechanical, production lines )
• Supervisor for installing new labeling, filling, roosting, dehydration, cutting, boilers and compressor product line which contain pumps and pipes installation, and maintain centrifugal pumps.
• Responsible for fabricated and design steel and manufacturing new conveyor belts, tanks elevators and maintain it.
• Working on design new filling ( product/brine ) station for pickles production lines.
• Project planning and supervision for new production facilities, lines and development.

Construction Engineer (Deputy Project Manager) في shotmed
  • مصر - السويس
  • ديسمبر 2011 إلى ديسمبر 2012

work to Erection parts of tanks and pipelines, in the elain elsokhna power station

Follow up the implementation of the daily plan that was approved by the project manager according to the work guidance in co-operation with project manager.

Make daily reports, follow up the productivity of the site provide the planning department with this reports.

Review plans and ensure the implementation of work according to specifications.

Reprogramming of the daily work in case of emergency and noticing the project manager.

Follow up the daily tests results with the laboratory and quality management.

Field co-ordination between the foreman’s and surveyors in accomplishing daily work.

Review the work program and the preparation of requisitions and ensure they are delivered on time and also inform the project manager to do the necessary.

Follow up the foreman’s and surveyors and clarify their daily work program.

Distribution of the daily work between foreman’s regarding the work plan.

الخلفية التعليمية

دبلوم, project management professionals
  • في American university in cairo
  • فبراير 2016

project management professionals

بكالوريوس, hi
  • في egypion aviation academy
  • أكتوبر 2011

Basic course for training in workshops from ministry of civil aviation about engines (jet & turbo) t

دبلوم, microsoft office
  • في Russian Cultural Center
  • يوليو 2011

Course in ICDL from Russian Cultural Center certificated from UNISCO organization.

بكالوريوس, mechanical power
  • في Institute of Aviation And Engineering Technology – Egyptian Aviation Academy
  • مايو 2011
دبلوم, programming
  • في cyper soft
  • يوليو 2008

Course in Introduction to Matlab from Cyber Soft educational center.

Specialties & Skills

Microsoft Excel
Microsoft PowerPoint
Power Plant Operations
Mechanical Analysis
microsoft (word,powerpoint,excel)
Non distractive test (pt,mt,ut,rt)
auto cad
Microsoft office

اللغات

الانجليزية
متمرّس
العربية
متمرّس

العضويات

egyption syndicate of engineers
  • mech. eng
  • December 2011
federation of arab engineers
  • mech. eng
  • December 2011

التدريب و الشهادات

fluid mechanics and pumps (تدريب)
معهد التدريب:
Cairo Oil Refining Company in Mostorod
تاريخ الدورة:
July 2007
heavy machines , airconditioning, firefighting &water desalination (تدريب)
معهد التدريب:
The arab contractors (osman ahmed osman &co).
تاريخ الدورة:
July 2009
automatic & manual transmition (تدريب)
معهد التدريب:
industrial traning council (ITC)
تاريخ الدورة:
February 2009
engine paramters ,maintenance and modifications (تدريب)
معهد التدريب:
industrial traning council (ITC)
تاريخ الدورة:
February 2010