civil construction supervisor
ROSNEFT Middle East Company
Total years of experience :10 years, 8 Months
supervise all construction activities
conduct daily, weekly and monthly meetings with contractors and management
report daily weekly and monthly report to top management
control quality of materials
Project name: GATHERING AND EXPORTING OF 15 KM OF PIPE-LINE WITH ROW FROM PSK
T0 FSK WITH FACILITIES
Employer: RENWA GROUP
Supervision and consultation by: DNO
Employment period: From December 2018 to present
Position at work: Project Civil Surveyor at RENWA Group
Activities in project:
• Supervising all surveyor’s fieldwork
• Control the cutting and filling works of the road.
• Reviewing the designs of ROW.
• Checking the locations and elevations of Culverts.
• Setting up the pic launchers and receivers with anchor-bolts.
• Installing and checking the manifolds, anchor supports
• Calculate the quantity of earthworks during the work using CIVIL 3D.
• Preparing and Draw final As-built by Civil3D and Infraworks.
• Survey all side by Fly-Drone with Processing.
• Submitting and preparing the survey RFI to Client.
Project name: CONSTRUCTION OF CHAMANKE E TO CHAMANKE C TIE-INS FLOW-LINE
(TRENCHING AND CIVIL WORKS) ATRUSH BLOCK B.V.
Employer: H.M. H GROUP
Supervision and consultation by: RENWA GROUP & TAQA GLOBAL
Employment period: From August 2018 to December 2018
Position at work: Project Management Surveyor at RENWA Group
Activities in project:
• Supervising all surveyor’s fieldwork
• Control the cutting and filling works of the road.
• Reviewing the designs of the ROW and Drainage System
• Checking the locations and elevations of Culverts.
• Setting up the Cellar box.
• Installing and checking the vertically Angle of Conductor pipe by Total Station.
• Calculate the quantity of earthworks during the work using CIVIL 3D
Project Name: DRILLING PAD AND RELATED FACILITIES FOR CHAMANKI G-PADWELL
LOCATION (ATRUSH BLOCK B.V.)
Employer: NASHWAN COMPANY
Supervision and consultation by: TAQA GLOBAL
Employment Period: From October 2017 to August 2018
Position at Work: Surveyors Team Leader at NASHWAN COMPANY
Activities in project:
Supervising all surveyor’s fieldwork.
• Control the cutting and filling works in road and pads.
• Designing all the projects by Civil3D and Infraworks.
• Putting the corner of rig-site and other pads using DGPS.
• Setting up the Cellar box and Waste Water pit.
• Checking the vertically Angle of Conductor pipe by Total Station.
• Putting the culvert locations using a total station and GPS.
• Calculate the quantity of earthworks during the work using CIVIL 3D.
• Survey the road and pads using DGPS and total station.
• Draw the final As-built of all project by Civil3D and Infraworks.
Project name: B3 CAMP FACILITY CONSTRUCTION
Employer: NDN GROUP
Supervision and consultation by: HKN
Employment period: From May 2018 to Oct 2018
Position at work: Technical &QS Surveyor at NDN GROUP-office works only
Activities in project:
• Surveying all site by GPS.
• Exporting the survey stake data to field surveyors.
• Re-Design some parts of the project by CIVIL3D.
• Controlling all surveyors’ works during the project.
• Calculate volume of cut& fill and quantity of material by Excel and CIVIL3D.
• Preparing weekly and monthly reports of the quantity of all materials
• Draw the final As-built of all project by Civil3D.
Project name: Basis of plant (BOP) site and Old-World Bridge (OWB) site remediation
(ATRUSH BLOCK B.V.)
Employer: NASHWAN COMPANY
Supervision and consultation by: TAQA GLOBAL
Position at work: surveyors team leader at NASHWAN
COMPANY
Activities in project:
• Surveying all site by GPS.
• Control cutting and filling the site by GPS.
• Design the drainage system of a site by CIVIL3D.
• Control placing the base-course of all site
• Calculate volume of cut& fill and quantity of material by Excel and CIVIL3D.
Project name: ROADWAYS, DRILLING PAD AND RELATED FACILITIES FOR CK-7 WELL LOCATION
Employer: NASHWAN COMPANY
Supervision and consultation by: TAQA GLOBAL
Employment period: From October 2015 to till now
Position at work: surveyors team leader in NASHWAN COMPANY
Activities in project:
• Supervised all surveyors’ fieldwork.
• Supervise cutting and filling works in road and pads.
• Putting the alignment of access road by using DGPS
• Putting the corner of rig-site and other pads and Culvert locations using DGPS
• Calculate the quantity of earthworks during the work using CIVIL 3D.
• Make blasting reports using CIVIL 3D.
• Survey the road and pads using DGPS and total station
Project name: water supply project in Kurdistan-package 1.
Employer: STFA-FERNAS-KAYLON joint venture
Supervision and consultation by Khatib and Alami off-shore
Employment period: From September 2014 to April 2015
Position at work: Supervisor surveyor in Khatib and Alami off-shore
Activities in project:
• Supervised all contractor surveying fieldwork.
• Supervise the locations of pipe line alignments.
• Checking the coordinates of chambers using a total station and GPS.
• Checking all elevations and dimensions of chambers.
• Calculate the executed quantities by the contractor and approve his payment.
• Locate and check the place of (PVR-ARV-WO-FLW-FY) Valves
•Review the As-build drawings prepared by the contractor surveyors.
Project name: Opening and paving the (33) local road in Duhok city
Employer: AROSH COMPANY
Employment period: December 2013 to august 2014
Position at work: Chief Surveyor at AROSH COMPANY
Activities in project:
• Determine the routes of local roads this will enable the contractor.
• Checking the cutting and filling uses level instrument.
• Check the sub-grade and sub-base layer using a total station Leica and level
instrument.
• Fixing elevation of curb-stone, pavement, gutter and grade layer using level and
total station
• Calculate Quantities of all executed work during the project.
• Locate the place of open channels.
Project name: Establishing Water Drainage Network in Duhok-City
Implement company: AROSH COMPANY
Employment period: from august 2013 to December 2013
Position at work: Land Surveyor at AROSH COMPANY
Activities in project:
• Setting out an alignment of drainage.
• Checking excavation work using level instrument.
• Fixing elevation of Lean concrete and height of manhole.
• Locate places of manholes using a total station.
• Checking the backfilling works at drainage excavation.
• Checking the working setup the corrugate pipe at a diameter that 70 cm of thickness.
Project name: Opening and Repairing 8 KM Of Main Road in Atrosh Hand
Implement company: HEWSEL COMPANY
Employment period: from September 2012 to January 2013
Position at work: Land Surveyor at HEWSEL COMPANY
Activities in project:
• Setting out the centerline of the road using the total station instrument.
• Checking the excavation works by using the level and total station.
• Fixing the grade elevations
• Verifying elevations of shoulders.
• Locate the culverts positions.