Ahmed Naeem, Sr.Tendering & Estimation Engineer

Ahmed Naeem

Sr.Tendering & Estimation Engineer

AL-AYUNI Investment & Contracting Co. (AICC)

Location
Saudi Arabia - Riyadh
Education
Diploma, Professional Program in Project Management " PRMG Certificate "
Experience
14 years, 10 Months

Share My Profile

Block User


Work Experience

Total years of experience :14 years, 10 Months

Sr.Tendering & Estimation Engineer at AL-AYUNI Investment & Contracting Co. (AICC)
  • Saudi Arabia - Riyadh
  • My current job since August 2017

•Estimate costs for engineering projects based on an analysis of project technical requirements.
•Collect and analyzes all project costs, including raw materials, labor, equipment and tooling to ensure estimates are accurate.
•Identify and quantify potential cost uncertainties to ensure costing models capture the full range of potential costs.
•Update costs as necessary based on new information and project scope changes.
•Contribute to moderately complex aspects of a project.
•Request for items’ quotations analyze and compare received quotations based on defined specifications to pick-up the most suitable ones.
•Prepare the direct cost “Comparison sheets” and coordinate with internal parties when dealing with unusual complex items in order to bring out the project’s lump sum in an optimized and accurate manner.
Key Projects: 1. Sharma to Tabuk Road Upgrade Sections 1 & 2 - NEOM (Awarded)
My role: Complete cost estimating for civil works including asphalt work with new MOT standards (76-10 S, H & V)
The project scope of work is the construction of new road parallel to the existing Sharma to Tabuk with maintaining the existing road, including U-turns, guardrails, street lighting, and other works (about 30km).
2. General Maintenance for Railway Network. (Awarded)
My role: Complete cost estimation for civil works and maintenance works.
The project scope of work is the maintenance works for 1700 km railways (3 lines) between Riyadh - Dammam.
3. FMS Construction of Facilities and Infrastructure to support MH-60R Aircraft (Awarded)
Construction of Buildings, infrastructure works specially Airfield and Fuel system related civil works.
4. JUBAIL - RIYADH PHASE 3, YANBU - MADINA PHASE 4 & SHUQAIQ PHASE 3WATER TRANSMISSION SYSTEM - SWCC
Pipelaying and Station Construction Works.
5. South Al Mutlaa N2 & N3 - KUWAIT
The project's scope of work consist of 150 kilometers of roads & related structures & numerous art works, lighting infrastructure, water distribution, rain-water gathering and sewage systems and other civil works necessary for the distribution of electricity, installation of telecommunications networks and traffic control at South Al Mutlaa City.
6. Rehabilitation & Maintenance of Dammam Abu Hadhriyah Highway - MOT
7 Dumat al jandal wind independent power plant
Construction of BOP (wind turbine foundations, Crane pads, masts and roads).
8. WAS City Development - North Infrastructure - MAADEN (Lowest bidder)
9. Aramco - Shaybah Airport Runway Upgrade Airport Rehabilitation using rubblization method.

Sr. Cost Control Engineer at Beijing Emirates International Construction
  • Saudi Arabia - Riyadh
  • April 2017 to August 2017

1. Responsible to control and monitor project total expenditure including verifying and checking of invoices and claims from suppliers, vendors and subcontractors to ensure that all project expenditures are captured and properly recorded.
2. Checking and revision the budget.
3. Preparing weekly and Bi Weekly report for the execution versus to IPC's (submittal, approval and cash collected).
4. Preparing monthly status report using EV.
5. Tracking, allocating and recording the Actual Cost through the software ERP system.
6. Creating the budget and ETC for direct and indirect cost.
7. Assisting on decision making by preparing a complete cost analysis for the critical BOQ items.
8. Predict completion dates, Budget estimate at completion and prepare look ahead reports.
9. Perform project costing related reporting to the team and management’s review on a monthly basis to ensure that expenditures are kept within the project budget

Sr. Procurement Engineer at Beijing Emirates International Construction
  • Saudi Arabia - Riyadh
  • January 2017 to April 2017

1) Develops specifications and performance test requirements to facilitate procurement of parts and equipment for aeronautical and aerospace products: Analyzes technical data, designs, preliminary specifications, manufacturing limitations, supplier facilities, and availability of parts and equipment.
2) Consults with engineering personnel to establish performance criteria and specifications for manufacturing and testing.
3) Investigates potential suppliers and recommends those most desirable.
4) Advises company personnel, suppliers, and customers of nature and function of parts and equipment.
5) Interviews supplier representatives regarding specifications, costs, inspection, and similar problems relating to parts and equipment.
6) Arranges and participates in conferences between suppliers and engineers, purchasers, inspectors, and other company personnel to facilitate material inspection, substitution, standardization, rework, salvage, utilization, and economical procurement of parts and equipment installed in aircraft, spacecraft, or related products.
MOI-King Abdullah Bin Abdulaziz's Project 2 (KAP2) KAP2 consists of a variety of building types including medical centers, training facilities, shooting ranges, clinics & forensic laboratories, recreational facilities, auditoriums and congregational facilities, mosques, shops, sports buildings and other institutional facilities.
MOI-King Abdullah Bin Abdulaziz's Project 5 (KAP5)
KAP5 consists of residential buildings, administrative offices, traffic divisions, police stations, drug control units, civil defense centers etc.

Sr.Tendering & Estimation Engineer at Hassan Allam Saudi Construction Company
  • Saudi Arabia - Riyadh
  • March 2014 to January 2017

• For Self Executed scope, read carefully the tender documents, study the project’s type, scope of work and specifications (including drawings, Bill of Quantity, milestones, etc...).
• Prioritize and quantify major items / long lead quotations required by the Estimators for enquiries and prepare RFQ & follow up quotations and prepare quotation comparison for major materials.
• Prepare the direct cost “break down analysis” of the Self executed scope and coordinate with internal parties when dealing with unusual complex items in order to bring out the project’s lump sum in an optimized and accurate manner.
• Managing various statistical data, Quantity take-offs, Material price lists, labor cost per hour, equipment, etc.
• Researching historical data (Purchase orders, Subcontracts, productivity analysis reports, etc.) And compiling summary reports to develop guidelines and precedence for future estimates.
• Build the relationships and liaise with internal customers and external suppliers and subcontractors and manage daily correspondence for quantities, costs and specifications.
• For Procurement scope, read carefully the tender documents, study the project’s type, scope of work and specifications (including drawings, Bill of Quantity, milestones, etc...).
• Prioritize and quantify major items / long lead quotations required by the Estimators for enquiries and prepare RFQ & follow up quotations and prepare quotation comparison for major materials.
• Request for items’ quotations analyze and compare received quotations based on defined specifications to pick-up the most suitable ones.
• Prepare the direct cost “Comparison sheets” and coordinate with internal parties when dealing with unusual complex items in order to bring out the project’s lump sum in an optimized and accurate manner.
Key Projects:
1. Riyadh Metro Project- Package 1-Civil Work for elevated stations 1A1, 1A2 :
The works includes construction of the civil and structural concrete works of the basement box, the underground structures and utilities and the mezzanine central supporting beam (spine) of stations 2A1 and 2A2. Client is BACS consortium.
2. DUBA Green Integrated Solar Combined-Civil Works For The Power Block And Tanks Areas - $30M: The works includes but not limited to Pilling, Earth Work, Concrete works, Steel Structure, some finishing and insulation works Client is INITEC Energía-SSEM Consortium.
3. Project Of The Custodian Of The Two Holy Mosques, King Abdullah Bin Abdul Aziz For Development of Security Quarters for Ministry of Interior- KSA - $4.5B:
Project comprises the construction of nine reformatories in different Cities in KSA. The work includes Construction of around 900 buildings using precast system in addition to all required utility networks, Landscaping and road works. Client is Ministry of interior.
4. Civil Works, package of foundation 3 and 4, Waad Al-Shamaal Integrated Solar Combined Cycle Power Plant - $50M:
The works includes but not limited to, Earth Work, Concrete works, Steel Structure, and insulation works. Client : Abeinsa- Abengoa
5. Construction Of Infrastructure For Soliman Al-Rajhi Colleges Project - Al-Qassim - KSA -
$100M: (Awarded)
The works includes Networks (Potable, irrigation, Storm, sewage) and all required Roads works.
6. Construction of South boarders residential Project (Salwa Section) - SALWA - KSA -
$200M:
Construction of around 158 Buildings using precast system with all required networks, Landscape and roads. Client is Ministry of interior. (Awarded)

Technical Office Engineer at Hassan Allam Construction"HAC", Algiers
  • Algeria - Algiers
  • May 2013 to March 2014

• Preparation of procurement requests, detailing, preparation of method statements, materials submittals, drawings submittals, quality, safety.
• Prepare QS for civil & arch. Drawings.
• Fully aware of the project specifications, drawings and contractual terms.
• Ensure that all drawings, documentation and records in use are reviewed, approved and controlled for adequacy.
• Ensure the implementation of the Project Quality Plan.
• Ensure proper control of Subcontractors invoices.
• Review and monitor the progress of the project.

Sr.Tendering & Estimation Engineer at Hassan Allam Construction
  • Afghanistan
  • July 2011 to May 2013

• Read and interpret correctly tender documents including Conditions of Contract, Specifications, Drawings and Preamble to Bill of Quantities.
• Prepare clarification letter to the Consultants for any unclear items / specifications.
• Workout all the relevant prices for the items in the tender BOQ by breaking items to the bottom level using CCS software, Direct all enquiries to suppliers and subcontractors.
• Attend the site visit for tender and prepare report. Provide full support for preparing submission documents in time. Compile the work breakdown.
• Attend the queries relating to any aspect of the project during the tender and execution stage.
• Implement quality procedures, particularly Contract Review/ Estimation / Document Control.

Assistant Contracts Administrator at Mena for Touristic & Real Estate Investment
  • Egypt - Cairo
  • September 2010 to July 2011

• Participate in business negotiations and give recommendations before contracts are signed.
• Review draft contracts of the company to ensure that company goals and objectives are well-considered in the contract.
• Prepares documents needed before contracts are created with business partners such as process specifications and progress reports.
• Give recommendations and request amendments to the contract if necessary.
• Monitor the results and efficiency of the contracts.
• Review and Final approval of all Monthly Interim Progress Payment Applications including VO accounts, EOT claims and additional monies to ensure provision of all substantiated documentation to maximize cash flow.

Site engineer at Total Engineering
  • Egypt - Cairo
  • July 2009 to September 2010

• Check site work to ensure compliance with the specifications and drawings.
• Inspect construction site to monitor progress and ensure conformance to engineering plans, specifications and construction safety standards.
• Analyze reports, maps, drawings, blueprints, tests and other related to the project.
• Ensure that all needed equipments, materials and manpower are available on site as required.
• Prepare regular progress reports.
• Take off quantities from drawings for measurement purposes and assist in the preparation of requisitions .
• Prepare and maintain site testing records .

Education

Diploma, Professional Program in Project Management " PRMG Certificate "
  • at American University in Cairo (AUC)
  • January 2011

Professional Program in Project Management

Bachelor's degree, eng_ahmedna3em@yahoo.com
  • at faculty of engineering- civil engineering
  • May 2009

Specialties & Skills

Planning
Cost Control
Civil Engineering
Tendering
Estimating
Autocad , primavera

Languages

English
Intermediate

Memberships

Egyptian Engineers Syndicate
  • Egyptian Engineers Syndicate
  • September 2009

Training and Certifications

Team Work & Communication Skills (Certificate)
Date Attended:
December 2011
Valid Until:
December 2011