Senior Technical Architect engineer
REZAIK AlGEDRAWY CONSTRUCTION COMPANY
Total des années d'expérience :14 years, 8 Mois
(Riyadh Township Phase 1A Northern Construction Work) (1082 villas) and 4 Masjids - 1 Kinder Garten - 3 NCC buildings
•Responsible to ensure that the site is supplied with all documentation, methods and materials needed to carry out the works
•prepare the architecture workshop drawings for all the project also the sitting out plan
•coordinate with the precast companies to follow the drawings and rectify all the missed information's
•Prepare the construction method statements and risk assessments, and develop work methods and temporary works necessary for your area
•Prepare temporary works drawings and site related design drawings.
•Follow up on the permanent work design and coordinate this with the site.
•Coordinate on a daily basis with the subcontractors, and assist in the preparation of the work requisition for the subcontracted works.
•Prepare technical and commercial comparison sheets of offers received from the subcontractors, and follow up of the subcontracted works, including the payment applications.
•Prepare work requisition for all required permanent materials, and prepare material submittals and follow-up of the approval process.
•Follow-up on the deliveries and invoicing of these permanent materials.
•Anticipate standard solutions and take initiative and make suggestions, you challenge prevailing assumptions.
•Demonstrate great ability to work effectively and efficiently in constantly changing business environment, you know how to deal with failures and look critically at own work.
•Plan, organize and prioritize own work, you seek confirmation of priorities when confronted with unusual situations, and you report on the state of affairs.
•Understand your role in the team and in the broader departmental organization, you document best practices and coach one or more specialists.
•Demonstrate responsibility and ownership and report spontaneously to your manager.
•Summarize data in a logical way and you check whether your own observations or interpretations are correct.
•Dealing with similar or regularly reoccurring situations, you start to apply risk management analysis.
Senior architect finishing manager at sabic project consists of 1253 villas with 5 types and 6 immam villas also 5 mosques ( 1500, 650, 2* 450, 350 )
• follow up the progress in the site
• Planning long and short strategy based upon main strategy.
• Calculating the productivity for all the projects
• Planning how to control manpower, cost, and tools and supervising for sub-contractor.
• Following up the resources required (manpowerـــ which is noted from planning section) as per development plan.
• Delineation for workability (skilled - unskilled) for minimum target "financial calculation” as per activity cost analysis.
• Setting scope and responsibility according to the system used in accordance with the strategy of running item of activity.
• Delineation for arise exalting unskilled manpower also staff.
• Coordinate with technical office about new projects specification giving the opinion in accordance with available materials, and work-ability, viewing through tracking sheet.
• Managing and operating thought of Central information and decentralization of decision-making.
• Prepare presentation reports for cost and supporting work ability monthly.
• Finishing Manpower histogram, Projects Manpower requirement and recruitment plane.
• Control and calculate the productivity for all the manpower under us more than 6519 employees.
• Creating new systems and strategies for our department to avoid any missing information’s
• Controlling the vacations and the manpower distributing in all the company projects
• Coordinate with the technical main office about the best way to work
• Coordinate with the accountant main office to calculate the cost and the productivity of the manpower
• Preparing tendering documents.
• Preparing formal reports and documents.
• Coordinate between all the activities in the project (specially finishing activities)
• Planning long and short strategy based upon main strategy.
• Creating manpower system and strategy.
• Creating productivity system and strategy.
• Creating cost analysis system and strategy.
• Creating Material System and strategy.
• Creating subcontractor system and strategy.
• Creating accountant system and strategy.
• Creating attendance information’s system - manpower analysis and strategy.
• Creating the subcontractor system and strategy.
• Calculating the productivity for all the projects
• Creating Tracking sheets for all the projects
• Planning how to control manpower, cost, and tools and supervising for sub-contractor.
• Following up the resources required (manpowerـــ which is noted from planning section) as per development plan.
• Delineation for workability (skilled - unskilled) for minimum target "financial calculation” as per activity cost analysis.
• Setting scope and responsibility according to the system used in accordance with the strategy of running item of activity.
• Delineation for arise exalting unskilled manpower also staff.
• Coordinate with technical office about new projects specification giving the opinion in accordance with available materials, and work ability, viewing through tracking sheet.
• Managing and operating thought of Central information and decentralization of decision-making.
• Prepare presentation reports for cost and supporting work ability monthly.
• Finishing Manpower histogram, Projects Manpower requirement and recruitment plane.
• Control and calculate the productivity for all the manpower under us more than 6519 employees.
• Creating new systems and strategies for our department to avoid any missing information’s
• Controlling the vacations and the manpower distributing in all the company projects
• Coordinate with the technical main office about the best way to work
• Coordinate with the accountant main office to calculate the cost and the productivity of the manpower
• Preparing tendering documents.
• Preparing formal reports and documents.
• Coordinate between all the activities in the project (specially finishing activities)
Detailed Roles & Responsibilities: STRATEGIC.
• Coordinator for all fabricated items for finishing work.
• Ensuring that the project Architect work is carried out in accordance with the required quality, cost and time schedule.
• coordinating and administrating of Architect related material and drawing submittals in accordance to the specifications
• Follow up closely procurement schedule and confirmations of delivery for material and equipment
• Ensuring that Architect work is executed on site in accordance with the contract drawings, specifications, agreed procedures and method statements
• Review, control and approval of Architect subcontractors work procedures and method statements.
• Carry out inspections on site and ensure that the installation is in accordance with the specification.
• Liaison with the Engineer’s Architect Supervisory Engineer, inspectors and relevant staff.
• Ensuring the Architect subcontractor provides and adheres to the necessary control documentation in an orderly and organized way.
• Ensure that As Built Drawings and O&M Manuals and related documentation are prepared, reviewed, submitted and approved in a timely manner and in accordance with contract requirements.
• Checking that Architect valuations with progress and checking variations produce a report of performance of Architect contractors.
• Preparation of coordinated reflected ceiling and builders work drawings.
• Arrange for timely builder’s works for smooth functioning of all site activities.
• Attend design coordination meetings with Project Management team, Consultants and other contractors as required.
• Produce a performance report of Architect -contractors.
• Follow-up to the problems that hinder the progress and solve with departments.
• Coordinate with HR, GR and Housing Division about Employee statements.
Project: - Aramco Dhahran housing project (2D & 2E) (779 villas)
• Supervise on the activities in the site and make forecast for our plan to finalize the project.
• Calculating the required manpower in each activity and distribute them.
• Calculating the productivity of manpower in each activity.
• Coordinate with the stores to avoid any wastage.
• Coordinate between all the activities in the project (specially finishing activities)
• Planning long and short strategy based upon main strategy.
• Planning how to control manpower, cost, and tools and supervising for sub-contractor.
• Coordinator for all fabricated items for finishing work.
• Ensuring that the project Architect work is carried out in accordance with the required quality, cost and time schedule.
• coordinating and administrating of Architect related material and drawing submittals in accordance to the specifications
• Follow up closely procurement schedule and confirmations of delivery for material and equipment
• Ensuring that Architect work is executed on site in accordance with the contract drawings, specifications, agreed procedures and method statements
• Review, control and approval of Architect subcontractors work procedures and method statements.
• Carry out inspections on site and ensure that the installation is in accordance with the specification.
• Liaison with the Engineer’s Architect Supervisory Engineer, inspectors and relevant staff.
• Ensuring that the Architect subcontractor provides and adheres to the necessary control documentation in an orderly and organized way.
• Ensure that As Built Drawings and O&M Manuals and related documentation are prepared, reviewed, submitted and approved in a timely manner and in accordance with contract requirements.
• Checking that Architect valuations correspond with progress and checking of variations produce a report of performance of Architect contractors.
• Preparation of coordinated reflected ceiling and builders work drawings.
• Arrange for timely builder’s works for smooth functioning of all site activities.
• Attend design coordination meetings with Project Management team, Consultants and other contractors as required.
• Produce a performance report of Architect -contractors
Detailed Roles & Responsibilities: STRATEGIC.
• Considers creative solutions to job requirements that reduce manpower requirements, cost, and/or time.
• Considers creative solutions to job requirements that distinguish Amana from other competitors.
• Responsible for the introduction of new methods of construction, equipment, and machinery to improve the Structural and architect services.
• Assists Procurement in selecting, evaluating and negotiating with architect subcontractors and suppliers operational.
• Studies Structural and architect scope of work and tender documents to ensure that all work has been quoted accordingly.
• Studies contract documents to become thoroughly acquainted with exact requirements and specifications of the job.
• Manages the process of preparing material submittals and subcontractor shop drawings of architect scope of work for submission to consultants.
• Ensures the quick and delay-free issuance of all permits required for architect scope of work.
Project: - (SATORP HOP project) (106 villas)
• Supervise on the activities in the site and make forecast for our plan to finalize the project.
• Calculating the required manpower in each activity and distribute them.
• Calculating the productivity of manpower in each activity.
• Coordinate with the stores to avoid any wastage.
• Coordinate between all the activities in the project (specially finishing activities)
• Planning long and short strategy based upon main strategy.
• Planning how to control manpower, cost, and tools and supervising for sub-contractor.
• Coordinator for all fabricated items for finishing work.
• Ensuring that the project Architect work is carried out in accordance with the required quality, cost and time schedule.
• coordinating and administrating of Architect related material and drawing submittals in accordance to the specifications
• Follow up closely procurement schedule and confirmations of delivery for material and equipment
• Ensuring that Architect work is executed on site in accordance with the contract drawings, specifications, agreed procedures and method statements
• Review, control and approval of Architect subcontractors work procedures and method statements.
• Carry out inspections on site and ensure that the installation is in accordance with the specification.
• Liaison with the Engineer’s Architect Supervisory Engineer, inspectors and relevant staff.
• Ensuring that the Architect subcontractor provides and adheres to the necessary control documentation in an orderly and organized way.
• Ensure that As Built Drawings and O&M Manuals and related documentation are prepared, reviewed, submitted and approved in a timely manner and in accordance with contract requirements.
• Checking that Architect valuations correspond with progress and checking of variations produce a report of performance of Architect contractors.
• Preparation of coordinated reflected ceiling and builders work drawings.
• Arrange for timely builder’s works for smooth functioning of all site activities.
• Attend design coordination meetings with Project Management team, Consultants and other contractors as required.
• Produce a performance report of Architect -contractors
Detailed Roles & Responsibilities: STRATEGIC.
• Considers creative solutions to job requirements that reduce manpower requirements, cost, and/or time.
• Considers creative solutions to job requirements that distinguish Amana from other competitors.
• Responsible for the introduction of new methods of construction, equipment, and machinery to improve the Structural and architect services.
• Assists Procurement in selecting, evaluating and negotiating with architect subcontractors and suppliers operational.
• Studies Structural and architect scope of work and tender documents to ensure that all work has been quoted accordingly.
• Studies contract documents to become thoroughly acquainted with exact requirements and specifications of the job.
• Manages the process of preparing material submittals and subcontractor shop drawings of architect scope of work for submission to consultants.
• Ensures the quick and delay-free issuance of all permits required for architect scope of work.
Project: - (SATORP HOP project) (106 villas)
• Supervise on the activities in the site and make forecast for our plan to finalize the project.
• Calculating the required manpower in each activity and distribute them.
• Calculating the productivity of manpower in each activity.
• Coordinate with the stores to avoid any wastage.
• Coordinate between all the activities in the project (specially finishing activities)
• Planning long and short strategy based upon main strategy.
• Planning how to control manpower, cost, and tools and supervising for sub-contractor.
• Coordinator for all fabricated items for finishing work.
• Ensuring that the project Architect work is carried out in accordance with the required quality, cost and time schedule.
• coordinating and administrating of Architect related material and drawing submittals in accordance to the specifications
• Follow up closely procurement schedule and confirmations of delivery for material and equipment
• Ensuring that Architect work is executed on site in accordance with the contract drawings, specifications, agreed procedures and method statements
• Review, control and approval of Architect subcontractors work procedures and method statements.
• Carry out inspections on site and ensure that the installation is in accordance with the specification.
• Liaison with the Engineer’s Architect Supervisory Engineer, inspectors and relevant staff.
• Ensuring that the Architect subcontractor provides and adheres to the necessary control documentation in an orderly and organized way.
• Ensure that As Built Drawings and O&M Manuals and related documentation are prepared, reviewed, submitted and approved in a timely manner and in accordance with contract requirements.
• Checking that Architect valuations correspond with progress and checking of variations produce a report of performance of Architect contractors.
• Preparation of coordinated reflected ceiling and builders work drawings.
• Arrange for timely builder’s works for smooth functioning of all site activities.
• Attend design coordination meetings with Project Management team, Consultants and other contractors as required.
• Produce a performance report of Architect -contractors
Detailed Roles & Responsibilities: STRATEGIC.
• Considers creative solutions to job requirements that reduce manpower requirements, cost, and/or time.
• Considers creative solutions to job requirements that distinguish Amana from other competitors.
• Responsible for the introduction of new methods of construction, equipment, and machinery to improve the Structural and architect services.
• Assists Procurement in selecting, evaluating and negotiating with architect subcontractors and suppliers operational.
• Studies Structural and architect scope of work and tender documents to ensure that all work has been quoted accordingly.
• Studies contract documents to become thoroughly acquainted with exact requirements and specifications of the job.
• Manages the process of preparing material submittals and subcontractor shop drawings of architect scope of work for submission to consultants.
• Ensures the quick and delay-free issuance of all permits required for architect scope of work.
Project: - MA`ADEN MUTRAFIAH housing project (794villas)
• Supervise on the activities in the site and make forecast for our plan to finalize the project.
• Calculating the required manpower in each activity and distribute them.
• Calculating the productivity of manpower in each activity.
• Coordinate with the stores to avoid any wastage.
• Coordinate between all the activities in the project (specially finishing activities)
• Planning long and short strategy based upon main strategy.
• Planning how to control manpower, cost, and tools and supervising for sub-contractor.
• Coordinator for all fabricated items for finishing work.
• Ensuring that the project Architect work is carried out in accordance with the required quality, cost and time schedule.
• coordinating and administrating of Architect related material and drawing submittals in accordance to the specifications
• Follow up closely procurement schedule and confirmations of delivery for material and equipment
• Ensuring that Architect work is executed on site in accordance with the contract drawings, specifications, agreed procedures and method statements
• Carry out inspections on site and ensure that the installation is in accordance with the specification.
• Ensuring that the Architect subcontractor provides and adheres to the necessary control documentation in an orderly and organized way.
• Checking that Architect valuations correspond with progress and checking of variations produce a report of performance of Architect contractors.
• Preparation of coordinated reflected ceiling and builders work drawings.
• Arrange for timely builder’s works for smooth functioning of all site activities.
• Attend design coordination meetings with Project Management team, Consultants and other contractors as required.
• Produce a performance report of Architect -contractors
Project: - Royal commission housing project C-13 (428villas)
• Supervise on the activities in the site and make forecast for our plan to finalize the project.
• Calculating the required manpower in each activity and distribute them.
• Calculating the productivity of manpower in each activity.
• Coordinate with the stores to avoid any wastage.
• Coordinate between all the activities in the project (specially finishing activities)
• Planning long and short strategy based upon main strategy.
• Planning how to control manpower, cost, and tools and supervising for sub-contractor.
• Coordinator for all fabricated items for finishing work.
• coordinating and administrating of Architect related material and drawing submittals in accordance to the specifications
• Ensuring that Architect work is executed on site in accordance with the contract drawings, specifications, agreed procedures and method statements
• Carry out inspections on site and ensure that the installation is in accordance with the specification.
• Arrange for timely builder’s works for smooth functioning of all site activities.
• Attend design coordination meetings with Project Management team, Consultants and other contractors as required.
GOSI housing project
• Supervise on the activities in the site and make forecast for our plan to finalize the project.
• Calculating the required manpower in each activity and distribute them.
• Calculating the productivity of manpower in each activity.
• Planning how to control manpower, cost, and tools and supervising for sub-contractor.
• Site engineer supervise on all the work in the site.
• Technical Office Engineer in El Fattah Company for Construction
• Prepare workshop Drawings.
• Prepare as Built Drawings.
• Managing the construction works including the coordination and supervision of multiple disciplines subcontractors.
• Quality control & material testing.
• Quantity survey & preparing the monthly certificates and contractor invoices.
EL KHAMIL 6th October housing project (30villas and 15 apartment
• Site engineer supervise on all the work in the site.
• Ensure measurement and control of direct and indirect manpower standards
• Analyze current state processes, conduct root cause analysis and introduce leading
practice solutions to minimize costs and improve service levels
• Technical Office Engineer in Egyptian Company for Construction
• Prepare workshop Drawings.
• Prepare as Built Drawings.
• Managing the construction works including the coordination and supervision of multiple disciplines subcontractors.
• Quality control & material testing.
• Quantity survey & preparing the monthly certificates and contractor invoices.
• Technical Office Engineer Prepare Workshop Drawings.
• Designing a lot of villas as the villa for Eng. MAGDY el ASYED in green waves compound
• Prepare as Built Drawings.
• Quality control & material testing.
• Quantity survey & preparing the monthly certificates and contractor invoices.
UNDERGRADUATE ARCHITECTURE ENGINEER
UNDERGRADUATE ARCHITECTURE ENGINEER
UNDERGRADUATE ARCHITECTURE ENGINEER
UNDERGRADUATE ENGINEER
undergraduate engineer
UNDERGRADUATED ENGINEER
undergraduate engineer
Saudi Real Estate Institute - المعهد العقاري السعودي Issued Sep 2023 · Expires Sep 2033 Credential ID 167093Credential ID 167093 Skills: Sustainable Design
Project Management Professional (PMP) is an internationally recognized\[citation needed\] professional designation offered by the Project Management Institute (PMI). As of March 2018, there are 833, 025 active PMP certified individuals and 286 chartered chapters across 210 countries and territories worldwide.\[1\] The exam is based on the PMI Project Management Body of Knowledge.
Quality management ensures that an organization, product or service is consistent. It has four main components: quality planning, quality assurance, quality control and quality improvement. Quality management is focused not only on product and service quality
(English language course) READ , WRITE , CONVERSATION
B.Sc. Architectural Engineering and Technology
Le lien a été supprimé pour non-respect des conditions d'utilisation. Veuillez contacter l’équipe d'assistance pour plus d'informations.