احمد نجم,  Senior Technical Architect engineer

احمد نجم

Senior Technical Architect engineer

REZAIK AlGEDRAWY CONSTRUCTION COMPANY

البلد
المملكة العربية السعودية
التعليم
دبلوم, Mostadam -AP (Sustainability)
الخبرات
14 years, 8 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :14 years, 8 أشهر

Senior Technical Architect engineer في REZAIK AlGEDRAWY CONSTRUCTION COMPANY
  • المملكة العربية السعودية - الرياض
  • ديسمبر 2020 إلى مارس 2024

(Riyadh Township Phase 1A Northern Construction Work) (1082 villas) and 4 Masjids - 1 Kinder Garten - 3 NCC buildings
•Responsible to ensure that the site is supplied with all documentation, methods and materials needed to carry out the works
•prepare the architecture workshop drawings for all the project also the sitting out plan
•coordinate with the precast companies to follow the drawings and rectify all the missed information's
•Prepare the construction method statements and risk assessments, and develop work methods and temporary works necessary for your area
•Prepare temporary works drawings and site related design drawings.
•Follow up on the permanent work design and coordinate this with the site.
•Coordinate on a daily basis with the subcontractors, and assist in the preparation of the work requisition for the subcontracted works.
•Prepare technical and commercial comparison sheets of offers received from the subcontractors, and follow up of the subcontracted works, including the payment applications.
•Prepare work requisition for all required permanent materials, and prepare material submittals and follow-up of the approval process.
•Follow-up on the deliveries and invoicing of these permanent materials.
•Anticipate standard solutions and take initiative and make suggestions, you challenge prevailing assumptions.
•Demonstrate great ability to work effectively and efficiently in constantly changing business environment, you know how to deal with failures and look critically at own work.
•Plan, organize and prioritize own work, you seek confirmation of priorities when confronted with unusual situations, and you report on the state of affairs.
•Understand your role in the team and in the broader departmental organization, you document best practices and coach one or more specialists.
•Demonstrate responsibility and ownership and report spontaneously to your manager.
•Summarize data in a logical way and you check whether your own observations or interpretations are correct.
•Dealing with similar or regularly reoccurring situations, you start to apply risk management analysis.

senior architecture finishing engineer at sabic housing project في Azmeel Contracting
  • المملكة العربية السعودية - الجبيل
  • أبريل 2019 إلى ديسمبر 2020

Senior architect finishing manager at sabic project consists of 1253 villas with 5 types and 6 immam villas also 5 mosques ( 1500, 650, 2* 450, 350 )
• follow up the progress in the site
• Planning long and short strategy based upon main strategy.
• Calculating the productivity for all the projects
• Planning how to control manpower, cost, and tools and supervising for sub-contractor.
• Following up the resources required (manpowerـــ which is noted from planning section) as per development plan.
• Delineation for workability (skilled - unskilled) for minimum target "financial calculation” as per activity cost analysis.
• Setting scope and responsibility according to the system used in accordance with the strategy of running item of activity.
• Delineation for arise exalting unskilled manpower also staff.
• Coordinate with technical office about new projects specification giving the opinion in accordance with available materials, and work-ability, viewing through tracking sheet.
• Managing and operating thought of Central information and decentralization of decision-making.
• Prepare presentation reports for cost and supporting work ability monthly.
• Finishing Manpower histogram, Projects Manpower requirement and recruitment plane.
• Control and calculate the productivity for all the manpower under us more than 6519 employees.
• Creating new systems and strategies for our department to avoid any missing information’s
• Controlling the vacations and the manpower distributing in all the company projects
• Coordinate with the technical main office about the best way to work
• Coordinate with the accountant main office to calculate the cost and the productivity of the manpower
• Preparing tendering documents.
• Preparing formal reports and documents.
• Coordinate between all the activities in the project (specially finishing activities)

Construction and cost control manager in the main office في Azmeel Contracting
  • المملكة العربية السعودية - الخبر
  • أكتوبر 2017 إلى أبريل 2019

• Planning long and short strategy based upon main strategy.
• Creating manpower system and strategy.
• Creating productivity system and strategy.
• Creating cost analysis system and strategy.
• Creating Material System and strategy.
• Creating subcontractor system and strategy.
• Creating accountant system and strategy.
• Creating attendance information’s system - manpower analysis and strategy.
• Creating the subcontractor system and strategy.
• Calculating the productivity for all the projects
• Creating Tracking sheets for all the projects
• Planning how to control manpower, cost, and tools and supervising for sub-contractor.
• Following up the resources required (manpowerـــ which is noted from planning section) as per development plan.
• Delineation for workability (skilled - unskilled) for minimum target "financial calculation” as per activity cost analysis.
• Setting scope and responsibility according to the system used in accordance with the strategy of running item of activity.
• Delineation for arise exalting unskilled manpower also staff.
• Coordinate with technical office about new projects specification giving the opinion in accordance with available materials, and work ability, viewing through tracking sheet.
• Managing and operating thought of Central information and decentralization of decision-making.
• Prepare presentation reports for cost and supporting work ability monthly.
• Finishing Manpower histogram, Projects Manpower requirement and recruitment plane.
• Control and calculate the productivity for all the manpower under us more than 6519 employees.
• Creating new systems and strategies for our department to avoid any missing information’s
• Controlling the vacations and the manpower distributing in all the company projects
• Coordinate with the technical main office about the best way to work
• Coordinate with the accountant main office to calculate the cost and the productivity of the manpower
• Preparing tendering documents.
• Preparing formal reports and documents.
• Coordinate between all the activities in the project (specially finishing activities)
Detailed Roles & Responsibilities: STRATEGIC.
• Coordinator for all fabricated items for finishing work.
• Ensuring that the project Architect work is carried out in accordance with the required quality, cost and time schedule.
• coordinating and administrating of Architect related material and drawing submittals in accordance to the specifications
• Follow up closely procurement schedule and confirmations of delivery for material and equipment
• Ensuring that Architect work is executed on site in accordance with the contract drawings, specifications, agreed procedures and method statements
• Review, control and approval of Architect subcontractors work procedures and method statements.
• Carry out inspections on site and ensure that the installation is in accordance with the specification.
• Liaison with the Engineer’s Architect Supervisory Engineer, inspectors and relevant staff.
• Ensuring the Architect subcontractor provides and adheres to the necessary control documentation in an orderly and organized way.
• Ensure that As Built Drawings and O&M Manuals and related documentation are prepared, reviewed, submitted and approved in a timely manner and in accordance with contract requirements.
• Checking that Architect valuations with progress and checking variations produce a report of performance of Architect contractors.
• Preparation of coordinated reflected ceiling and builders work drawings.
• Arrange for timely builder’s works for smooth functioning of all site activities.
• Attend design coordination meetings with Project Management team, Consultants and other contractors as required.
• Produce a performance report of Architect -contractors.
• Follow-up to the problems that hinder the progress and solve with departments.
• Coordinate with HR, GR and Housing Division about Employee statements.

Architectural finishing manager project Aramco Dhahran في Azmeel Contracting
  • المملكة العربية السعودية - الخبر
  • نوفمبر 2016 إلى أكتوبر 2017

Project: - Aramco Dhahran housing project (2D & 2E) (779 villas)
• Supervise on the activities in the site and make forecast for our plan to finalize the project.
• Calculating the required manpower in each activity and distribute them.
• Calculating the productivity of manpower in each activity.
• Coordinate with the stores to avoid any wastage.
• Coordinate between all the activities in the project (specially finishing activities)
• Planning long and short strategy based upon main strategy.
• Planning how to control manpower, cost, and tools and supervising for sub-contractor.
• Coordinator for all fabricated items for finishing work.
• Ensuring that the project Architect work is carried out in accordance with the required quality, cost and time schedule.
• coordinating and administrating of Architect related material and drawing submittals in accordance to the specifications
• Follow up closely procurement schedule and confirmations of delivery for material and equipment
• Ensuring that Architect work is executed on site in accordance with the contract drawings, specifications, agreed procedures and method statements
• Review, control and approval of Architect subcontractors work procedures and method statements.
• Carry out inspections on site and ensure that the installation is in accordance with the specification.
• Liaison with the Engineer’s Architect Supervisory Engineer, inspectors and relevant staff.
• Ensuring that the Architect subcontractor provides and adheres to the necessary control documentation in an orderly and organized way.
• Ensure that As Built Drawings and O&M Manuals and related documentation are prepared, reviewed, submitted and approved in a timely manner and in accordance with contract requirements.
• Checking that Architect valuations correspond with progress and checking of variations produce a report of performance of Architect contractors.
• Preparation of coordinated reflected ceiling and builders work drawings.
• Arrange for timely builder’s works for smooth functioning of all site activities.
• Attend design coordination meetings with Project Management team, Consultants and other contractors as required.
• Produce a performance report of Architect -contractors
Detailed Roles & Responsibilities: STRATEGIC.
• Considers creative solutions to job requirements that reduce manpower requirements, cost, and/or time.
• Considers creative solutions to job requirements that distinguish Amana from other competitors.
• Responsible for the introduction of new methods of construction, equipment, and machinery to improve the Structural and architect services.
• Assists Procurement in selecting, evaluating and negotiating with architect subcontractors and suppliers operational.
• Studies Structural and architect scope of work and tender documents to ensure that all work has been quoted accordingly.
• Studies contract documents to become thoroughly acquainted with exact requirements and specifications of the job.
• Manages the process of preparing material submittals and subcontractor shop drawings of architect scope of work for submission to consultants.
• Ensures the quick and delay-free issuance of all permits required for architect scope of work.

Architectural finishing manager at satorp project في Azmeel Contracting
  • المملكة العربية السعودية - الجبيل
  • نوفمبر 2015 إلى أكتوبر 2016

Project: - (SATORP HOP project) (106 villas)
• Supervise on the activities in the site and make forecast for our plan to finalize the project.
• Calculating the required manpower in each activity and distribute them.
• Calculating the productivity of manpower in each activity.
• Coordinate with the stores to avoid any wastage.
• Coordinate between all the activities in the project (specially finishing activities)
• Planning long and short strategy based upon main strategy.
• Planning how to control manpower, cost, and tools and supervising for sub-contractor.
• Coordinator for all fabricated items for finishing work.
• Ensuring that the project Architect work is carried out in accordance with the required quality, cost and time schedule.
• coordinating and administrating of Architect related material and drawing submittals in accordance to the specifications
• Follow up closely procurement schedule and confirmations of delivery for material and equipment
• Ensuring that Architect work is executed on site in accordance with the contract drawings, specifications, agreed procedures and method statements
• Review, control and approval of Architect subcontractors work procedures and method statements.
• Carry out inspections on site and ensure that the installation is in accordance with the specification.
• Liaison with the Engineer’s Architect Supervisory Engineer, inspectors and relevant staff.
• Ensuring that the Architect subcontractor provides and adheres to the necessary control documentation in an orderly and organized way.
• Ensure that As Built Drawings and O&M Manuals and related documentation are prepared, reviewed, submitted and approved in a timely manner and in accordance with contract requirements.
• Checking that Architect valuations correspond with progress and checking of variations produce a report of performance of Architect contractors.
• Preparation of coordinated reflected ceiling and builders work drawings.
• Arrange for timely builder’s works for smooth functioning of all site activities.
• Attend design coordination meetings with Project Management team, Consultants and other contractors as required.
• Produce a performance report of Architect -contractors
Detailed Roles & Responsibilities: STRATEGIC.
• Considers creative solutions to job requirements that reduce manpower requirements, cost, and/or time.
• Considers creative solutions to job requirements that distinguish Amana from other competitors.
• Responsible for the introduction of new methods of construction, equipment, and machinery to improve the Structural and architect services.
• Assists Procurement in selecting, evaluating and negotiating with architect subcontractors and suppliers operational.
• Studies Structural and architect scope of work and tender documents to ensure that all work has been quoted accordingly.
• Studies contract documents to become thoroughly acquainted with exact requirements and specifications of the job.
• Manages the process of preparing material submittals and subcontractor shop drawings of architect scope of work for submission to consultants.
• Ensures the quick and delay-free issuance of all permits required for architect scope of work.

Architectural finishing manager at satorp project في Azmeel Contracting
  • المملكة العربية السعودية - الجبيل
  • نوفمبر 2015 إلى أكتوبر 2016

Project: - (SATORP HOP project) (106 villas)
• Supervise on the activities in the site and make forecast for our plan to finalize the project.
• Calculating the required manpower in each activity and distribute them.
• Calculating the productivity of manpower in each activity.
• Coordinate with the stores to avoid any wastage.
• Coordinate between all the activities in the project (specially finishing activities)
• Planning long and short strategy based upon main strategy.
• Planning how to control manpower, cost, and tools and supervising for sub-contractor.
• Coordinator for all fabricated items for finishing work.
• Ensuring that the project Architect work is carried out in accordance with the required quality, cost and time schedule.
• coordinating and administrating of Architect related material and drawing submittals in accordance to the specifications
• Follow up closely procurement schedule and confirmations of delivery for material and equipment
• Ensuring that Architect work is executed on site in accordance with the contract drawings, specifications, agreed procedures and method statements
• Review, control and approval of Architect subcontractors work procedures and method statements.
• Carry out inspections on site and ensure that the installation is in accordance with the specification.
• Liaison with the Engineer’s Architect Supervisory Engineer, inspectors and relevant staff.
• Ensuring that the Architect subcontractor provides and adheres to the necessary control documentation in an orderly and organized way.
• Ensure that As Built Drawings and O&M Manuals and related documentation are prepared, reviewed, submitted and approved in a timely manner and in accordance with contract requirements.
• Checking that Architect valuations correspond with progress and checking of variations produce a report of performance of Architect contractors.
• Preparation of coordinated reflected ceiling and builders work drawings.
• Arrange for timely builder’s works for smooth functioning of all site activities.
• Attend design coordination meetings with Project Management team, Consultants and other contractors as required.
• Produce a performance report of Architect -contractors
Detailed Roles & Responsibilities: STRATEGIC.
• Considers creative solutions to job requirements that reduce manpower requirements, cost, and/or time.
• Considers creative solutions to job requirements that distinguish Amana from other competitors.
• Responsible for the introduction of new methods of construction, equipment, and machinery to improve the Structural and architect services.
• Assists Procurement in selecting, evaluating and negotiating with architect subcontractors and suppliers operational.
• Studies Structural and architect scope of work and tender documents to ensure that all work has been quoted accordingly.
• Studies contract documents to become thoroughly acquainted with exact requirements and specifications of the job.
• Manages the process of preparing material submittals and subcontractor shop drawings of architect scope of work for submission to consultants.
• Ensures the quick and delay-free issuance of all permits required for architect scope of work.

Senior Architectural finishing engineer at maaden project في Azmeel Contracting
  • المملكة العربية السعودية - الجبيل
  • نوفمبر 2014 إلى نوفمبر 2015

Project: - MA`ADEN MUTRAFIAH housing project (794villas)
• Supervise on the activities in the site and make forecast for our plan to finalize the project.
• Calculating the required manpower in each activity and distribute them.
• Calculating the productivity of manpower in each activity.
• Coordinate with the stores to avoid any wastage.
• Coordinate between all the activities in the project (specially finishing activities)
• Planning long and short strategy based upon main strategy.
• Planning how to control manpower, cost, and tools and supervising for sub-contractor.
• Coordinator for all fabricated items for finishing work.
• Ensuring that the project Architect work is carried out in accordance with the required quality, cost and time schedule.
• coordinating and administrating of Architect related material and drawing submittals in accordance to the specifications
• Follow up closely procurement schedule and confirmations of delivery for material and equipment
• Ensuring that Architect work is executed on site in accordance with the contract drawings, specifications, agreed procedures and method statements
• Carry out inspections on site and ensure that the installation is in accordance with the specification.
• Ensuring that the Architect subcontractor provides and adheres to the necessary control documentation in an orderly and organized way.
• Checking that Architect valuations correspond with progress and checking of variations produce a report of performance of Architect contractors.
• Preparation of coordinated reflected ceiling and builders work drawings.
• Arrange for timely builder’s works for smooth functioning of all site activities.
• Attend design coordination meetings with Project Management team, Consultants and other contractors as required.
• Produce a performance report of Architect -contractors

Architectural finishing engineer at c-13 royal commission في Azmeel Contracting
  • المملكة العربية السعودية - الجبيل
  • ديسمبر 2013 إلى نوفمبر 2014

Project: - Royal commission housing project C-13 (428villas)
• Supervise on the activities in the site and make forecast for our plan to finalize the project.
• Calculating the required manpower in each activity and distribute them.
• Calculating the productivity of manpower in each activity.
• Coordinate with the stores to avoid any wastage.
• Coordinate between all the activities in the project (specially finishing activities)
• Planning long and short strategy based upon main strategy.
• Planning how to control manpower, cost, and tools and supervising for sub-contractor.
• Coordinator for all fabricated items for finishing work.
• coordinating and administrating of Architect related material and drawing submittals in accordance to the specifications
• Ensuring that Architect work is executed on site in accordance with the contract drawings, specifications, agreed procedures and method statements
• Carry out inspections on site and ensure that the installation is in accordance with the specification.
• Arrange for timely builder’s works for smooth functioning of all site activities.
• Attend design coordination meetings with Project Management team, Consultants and other contractors as required.

Architectural finishing engineer at gosi housing project في Azmeel Contracting
  • المملكة العربية السعودية - الجبيل
  • أكتوبر 2013 إلى ديسمبر 2013

GOSI housing project
• Supervise on the activities in the site and make forecast for our plan to finalize the project.
• Calculating the required manpower in each activity and distribute them.
• Calculating the productivity of manpower in each activity.
• Planning how to control manpower, cost, and tools and supervising for sub-contractor.

Construction Site Engineer في Azmeel Contracting
  • مصر - القاهرة
  • ديسمبر 2012 إلى أكتوبر 2013

• Site engineer supervise on all the work in the site.
• Technical Office Engineer in El Fattah Company for Construction
• Prepare workshop Drawings.
• Prepare as Built Drawings.
• Managing the construction works including the coordination and supervision of multiple disciplines subcontractors.
• Quality control & material testing.
• Quantity survey & preparing the monthly certificates and contractor invoices.

Construction Site Engineer في Egyptian Company for Construction (EGYPCO)
  • مصر - القاهرة
  • أبريل 2011 إلى ديسمبر 2012

EL KHAMIL 6th October housing project (30villas and 15 apartment
• Site engineer supervise on all the work in the site.
• Ensure measurement and control of direct and indirect manpower standards
• Analyze current state processes, conduct root cause analysis and introduce leading
practice solutions to minimize costs and improve service levels
• Technical Office Engineer in Egyptian Company for Construction
• Prepare workshop Drawings.
• Prepare as Built Drawings.
• Managing the construction works including the coordination and supervision of multiple disciplines subcontractors.
• Quality control & material testing.
• Quantity survey & preparing the monthly certificates and contractor invoices.

Architectural designer engineer في Engineering Office (A2G2) (Dr. Ali Gaber & Dr. Ahmed Mustafa)
  • مصر - القاهرة
  • أكتوبر 2010 إلى مارس 2011

• Technical Office Engineer Prepare Workshop Drawings.
• Designing a lot of villas as the villa for Eng. MAGDY el ASYED in green waves compound
• Prepare as Built Drawings.
• Quality control & material testing.
• Quantity survey & preparing the monthly certificates and contractor invoices.

UNDERGRADUATE ENGINEER في Urban Projects – Consultants Office (Dr. HUSSEIN GHANNAM)
  • مصر - القاهرة
  • يوليو 2009 إلى أغسطس 2009

UNDERGRADUATE ARCHITECTURE ENGINEER

UNDERGRADUATE ARCHITECTURE ENGINEER في Arab Contractors Company (Institute for Construction Engineering and Management Technologies)
  • مصر - القاهرة
  • يونيو 2009 إلى يوليو 2009

UNDERGRADUATE ARCHITECTURE ENGINEER

UNDERGRADUATE ARCHITECTURE ENGINEER في Arab Contractors Company (in Development & Training Department)
  • مصر - القاهرة
  • يونيو 2008 إلى يوليو 2008

UNDERGRADUATE ARCHITECTURE ENGINEER

UNDERGRADUATE ENGINEER في EGYPCO construction company site field.
  • مصر - القاهرة
  • أغسطس 2007 إلى سبتمبر 2007

UNDERGRADUATE ENGINEER

undergraduate engineer في Modern Academy for Engineering & Technology
  • مصر - القاهرة
  • يونيو 2007 إلى يوليو 2007

undergraduate engineer

UNDERGRADUATED ENGINEER في Modern Academy for Engineering & Technology
  • مصر - القاهرة
  • يوليو 2006 إلى أغسطس 2006

UNDERGRADUATED ENGINEER

undergraduate engineer في EGYPCO construction company site field.
  • مصر - القاهرة
  • يوليو 2005 إلى سبتمبر 2005

undergraduate engineer

الخلفية التعليمية

دبلوم, Mostadam -AP (Sustainability)
  • في Saudi Real Estate Institute - المعهد العقاري السعودي
  • سبتمبر 2023

Saudi Real Estate Institute - المعهد العقاري السعودي Issued Sep 2023 · Expires Sep 2033 Credential ID 167093Credential ID 167093 Skills: Sustainable Design

دبلوم, Project Management Professional (PMP)
  • في Saudi engineering council
  • أبريل 2017

Project Management Professional (PMP) is an internationally recognized\[citation needed\] professional designation offered by the Project Management Institute (PMI). As of March 2018, there are 833, 025 active PMP certified individuals and 286 chartered chapters across 210 countries and territories worldwide.\[1\] The exam is based on the PMI Project Management Body of Knowledge.

دبلوم, Diploma, QA/ QC and management System
  • في AZMEEL CONSTRUCTION COMPANY
  • فبراير 2014

Quality management ensures that an organization, product or service is consistent. It has four main components: quality planning, quality assurance, quality control and quality improvement. Quality management is focused not only on product and service quality

دبلوم, Diploma, Specialist training program certificate (English language course)
  • في Cairo University
  • يوليو 2010

(English language course) READ , WRITE , CONVERSATION

بكالوريوس, Bachelor's degree, B.Sc. Architectural Engineering and Technology
  • في Modern Academy For Engineering And Technology
  • مايو 2010

B.Sc. Architectural Engineering and Technology

Specialties & Skills

Architecture
Management
Finishing
Technical Drawing
Interior Architecture
ENGINEERING
NEGOTIATION
logistics
painting
COMPUTER ASSOCIATES PACKAGES
INVOICES
architectural design
structural
ARCHITECTURE
FINISHING
quantity surveying
quality engineering
procurement
architect
MICROSOFT WORD
planning
3DS max
autocad
landscape design
site inspection
urban planning
MICROSOFT OFFICE
DOCUMENTATION
quality auditing
microsoft powerpoint
revit ARCHITECTURE
MEETING FACILITATION
primavera p6
sketchup
operation
MICROSOFT WORKS
construction
materials
residential
maintenance engineering
site supervision
quality assurance
accounting
program management
problem solving
work instructions
supervisory experience
ms project

حسابات مواقع التواصل الاجتماعي

الموقع الشخصي
الموقع الشخصي

لقد تم حذف الرابط بسبب انتهاكه لسياسة الموقع. يرجى التواصل مع قسم الدعم لمزيد من المعلومات.


فيس بوك
فيس بوك
facebook.com/negmfire


انستغرام
انستغرام
instagram.com/anegm1

اللغات

العربية
اللغة الأم
الانجليزية
متمرّس
الفرنسية
مبتدئ

العضويات

Saudi engineering council
  • architecture engineer
  • October 2013
Egyptian Engineers Syndicate
  • architecture engineer
  • May 2010

التدريب و الشهادات

Mostadam AP (تدريب)
معهد التدريب:
Saudi Real Estate Institute - المعهد العقاري السعودي
تاريخ الدورة:
September 2023
المدة:
15 ساعة
A2G2 CERTIFICATE (الشهادة)
تاريخ الدورة:
October 2010
صالحة لغاية:
March 2011
SUMMER TRAINING (الشهادة)
تاريخ الدورة:
July 2009
SUMMER TRAINING (الشهادة)
تاريخ الدورة:
July 2008
Certificate of appreciation from (MADEEN) as finishing engineer in recognition my work (الشهادة)
تاريخ الدورة:
November 2015
fire protection in façade / safe and tested solutions for perimeter fire barrier (الشهادة)
تاريخ الدورة:
November 2017
approval from (sabic project) as senior finishing engineer in recognition my work (الشهادة)
تاريخ الدورة:
September 2020
Specialist training program certificate (English language course) (الشهادة)
تاريخ الدورة:
July 2010
Certificated from Saudi engineering council (الشهادة)
تاريخ الدورة:
October 2013
QA/ QC and management System (الشهادة)
تاريخ الدورة:
February 2014
Certificate of appreciation from (AECOM & MA`ADEN. Saudi Arabian mining company) as finishing eng (الشهادة)
تاريخ الدورة:
November 2015
Certificate of appreciation from (SATORP HOP project) as finishing engineer in recognition my work (الشهادة)
تاريخ الدورة:
October 2016
Project management Professional course (PMP) (الشهادة)
تاريخ الدورة:
April 2017
Construction Management Foundations (الشهادة)
تاريخ الدورة:
October 2020
Construction Management: Introduction to Lean Construction (الشهادة)
تاريخ الدورة:
October 2020
Project Management Simplified (الشهادة)
تاريخ الدورة:
October 2020
on the job site : construction (الشهادة)
تاريخ الدورة:
October 2020
Autodesk 3ds max design (تدريب)
معهد التدريب:
Autodesk
تاريخ الدورة:
December 2009
المدة:
33 ساعة
Autodesk 3ds max design (تدريب)
معهد التدريب:
Autodesk
تاريخ الدورة:
December 2009
المدة:
33 ساعة
Autodesk Revit architecture fundamentals (تدريب)
معهد التدريب:
Autodesk
تاريخ الدورة:
April 2012
المدة:
33 ساعة

الهوايات

  • • Volunteer work • Reading: Politics, Communication books, Religion and History. • Sports: Running,
    I already get awards from Arab contract construction company - satorp - madeen - Aramco - engineering Saudi council