أحمد عثمان محمود, Customer Service Team Leader

أحمد عثمان محمود

Customer Service Team Leader

ALHAMRANI UNIVERSAL COMPANY

البلد
عمان - مسقط
التعليم
بكالوريوس, Industrial Electronics And Control Department
الخبرات
12 years, 10 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :12 years, 10 أشهر

Customer Service Team Leader في ALHAMRANI UNIVERSAL COMPANY
  • المملكة العربية السعودية - الرياض
  • يوليو 2010 إلى يوليو 2019

• Working in ALHAMRANI Universal Company which is the reprehensive one for DIEBOLD ATM in Saudi Arabia as ATM Maintenance Engineer.
• Working as team leader.
• Self-motivated, able to work under remote supervision
• Distribute order work to the team and receive feedback report .
• Fix and maintain ATM faults.
• Installing ATM in the site.
• Configure ATM and onlining.
• Installation ATM software and the necessary updates
• Making preventive maintenance for all ATM kinds
(OPTEVA 522, 562, 750, 740, 760.720, 328, 828, BNA, BCRM AND ECRM)

Production ,Managment ,Planning في Elsewedy For Engineering Industries Factory
  • مصر - القاهرة
  • مارس 2007 إلى يوليو 2010

• I was the responsible engineer in the production lines of all kinds of luminaries (Recessed, surface, prismatic, street light luminaries and spots)
• Supervision on more than 40 technicians in assembly workshop.
• Assist in training technicians.
• Making simple electrical diagram demonstrate the luminaries connection using AutoCAD.
• Monitoring product quality.
• Providing solutions to increase the production and quality.
• Control the use of material and avoid damage and waste.
• Making order work to every technician to be executed.
• Making yearly plan by the no. of luminaries should by assemble.
• Provide the necessary materials for the implantation of the plan.
• Monitors the level of materials.
• Escalates any issues related to the shortage and quality of materials used for assembly to the head manager

• Control the use of material and avoid damage and waste.
• Making order work to every technician to be executed.
• Making yearly plan by the no. of luminaries should by assemble.
• Provide the necessary materials for the implantation of the plan.
• Monitors the level of materials.
• Escalates any issues related to the shortage and quality of materials used for assembly to the head manager
• Understands electrical drawings.

Electrical - Mechaanical Maintenance Engineer في E.E.C For Developed Plastic
  • مصر
  • أكتوبر 2006 إلى مارس 2007

• Working in E.E.C. for Developed Plastic as maintenance Engineer.
• Making Electrical and Mechanical maintenance to HUSKY PET plastic Injection Molding Machine and their accessories (Water Chiller and Hopper Dryer).
• Making PM (Preventive Maintenance) As per machine manuals.
• Perform fault analysis and troubleshooting of electrical and mechanical faults .
• Monitors product quality until packaging.

الخلفية التعليمية

بكالوريوس, Industrial Electronics And Control Department
  • في Faculty of Electronic Engineering
  • مايو 2006

University degree: Bachelor of Electronic Engineering. College: Faculty of Electronic Engineering. University: Menofia University. Department: Industrial Electronics and control. Project: Automation Control System (Green House Environmental controlled using PLC). Project Grade: Excellent Graduation year: May 2006.

Specialties & Skills

Production
Electronics
Electrical
Manufacturing
Maintenance
maintenance
MANAGEMENT
LEADERSHIP
MATERIALS MANAGEMENT
MONITORS
QUALITY

حسابات مواقع التواصل الاجتماعي

الموقع الشخصي
الموقع الشخصي

لقد تم حذف الرابط بسبب انتهاكه لسياسة الموقع. يرجى التواصل مع قسم الدعم لمزيد من المعلومات.

اللغات

العربية
متمرّس
الانجليزية
متمرّس

التدريب و الشهادات

Cctv and security systems (تدريب)
معهد التدريب:
Alhamrani Universal Company
ATM Maintenance Training (تدريب)
معهد التدريب:
AlHamrani
تاريخ الدورة:
April 2011
المدة:
150 ساعة

الهوايات

  • chess