Electrical Engineer
Hyder consulting
Total years of experience :14 years, 7 Months
Job Description:
A) Site Works:
• Inspect construction related to M, E&I installations as per approved shop drawings.
• Inspect material upon delivery and ensure proper storage.
• Maintain records for executed works.
• Inspect completed works.
• Check/update as built review.
• Maintain records for testing and commissioning.
• Arrange and prepare the site for PAC inspection and handing over.
B) Office works:
1-Update the following construction activities on daily basis:
• Construction progress drawings.
• Pipe laying progress record.
• Inspection test records.
• Manpower & Equipment record.
• Material delivery record.
• Site diary.
• Measurement record of work done.
• Pressure test record.
• Construction photos record.
• Inspection request record.
b) Maintain daily report.
c) Assist in preparation of as-built drawing.
d) Co-ordinate with site ARE regarding the daily construction activities.
Job description: First line technical support for networks and running complete system diagnosis for POS system using visual basic and SQL server and crystal systems using visual basic and SQL server and crystal, and performing site visits.
• Installation and commissioning of the Centrifuge system.
• Supervision of Dn 12000 mm Ductile Iron twin pipeline with Valve Chambers and Pumping Station.
• Supervision and inspection of line protection system
• Installation/Pre-commissioning and functional test of the Transmission Pumps.
• Inspection of Air conditioning system.
• Inspection & supervision of various system of piping for diesel engine generator set.
• Installation, testing and commissioning or compressed air system.
I have two Bachelor Degrees • Bachelor degree in Electrical Engineering (General Electrical) University of the District of Columbia UDC (Washington D.C) (2009). • B.sc in Electrical Engineering (communications and electronics) Modern Academy for engineering and technology (2009).