Total Years of Experience: 16 Years, 2 Months
September 2017
To Present
Construction manager
at Construction M anager. China State Construction Engineering Corporation, Middle Eas
Location :
United Arab Emirates
Road, Utilities) for PROJECT R881/ 3C2:
COMPREHEN SIVE IMPROVEMENTS OF THE
PARALLEL ROADS - PHASE 3C2 (792, 800, 000 AED).
Description of the Project
The project is the continued extension of Al Asayel Street (D72) and First Al Khail Street
(D86). The improvements in this contract is mainly includes the upgrading of Al Yalayis
COMPREHEN SIVE IMPROVEMENTS OF THE
PARALLEL ROADS - PHASE 3C2 (792, 800, 000 AED).
Description of the Project
The project is the continued extension of Al Asayel Street (D72) and First Al Khail Street
(D86). The improvements in this contract is mainly includes the upgrading of Al Yalayis
July 2016
To August 2016
Construction manager
at Construction M anager. China State Construction Engineering Corporation, Middle Eas
Location :
United Arab Emirates
Road, Utilities) for Main Terminal Land side, Abu Dhabi AirPort with
ADAC (348, 732, 887 AED).
Description of the Project
Construction of the Landside Primary and Secondary Roads Component Project which is
a part of the Midfield Terminal Complex (MTC) for the Abu Dhabi International Airport
Development.
The project is based on a Main Contractor contract with a total construction period of 790
calendar days, including 5.5km of primary roads of 2 to 4 lanes, 8km of grade secondary
roads, 170, 000m2 of Asphalt surfacing for the primary and secondary roads, 11 No. post
tensioned bridge structures with spans in range of 36m to 50m with total length of 1.7km,
700, 000m3 of embankment and 1.7km of MSE Wall, and 4 electrical substation buildings
and associated electrical and mechanical installations.
The Primary Roads provide access and egress from the E-10 highway to the Midfield
Terminal Building (MTB). This looped roadway will provide the principal access point to
and from the MTB and will connect into the new E-10 intersection that is being
simultaneously constructed under a separate Abu Dhabi Department of Transport
contract. Between the E-10 highway and the MTB, the roadway is elevated on a
combination of cast-insitu post-tensioned bridge structures and embankment
Page 3 of 12
construction with earth reinforced walls provided at locations where embankment slopes
cannot be accommodated. In addition to the MTB, the Primary Roads also provide
structurally elevated access to the upper (third) floor of the MTB car park that represents
the principal parking facility for the terminal building. The approximate road area is
120, 000m2 with a total length of approximately 5, 600m with 2-4 lanes in each direction.
The Secondary Roads loop from the boundary of the airport with the E-10 intersection
and comprise of an at-grade local road network that is connected to the Primary Roads.
The Secondary Roads will provide access to the Employees Consolidation Centre, the
Long Term Car Park and the Landside Goods and Waste Facility that are critical facilities
for the functionality of the MTB. They will also serve the future development of the Airport
City commercial district. The road network comprises mainly two lanes in each direction
with roundabouts provided for traffic control at each of the aforementioned facilities. The
total length of secondary roads is approximately 6, 200m with mainly 2-lanes in each
direction.
ADAC (348, 732, 887 AED).
Description of the Project
Construction of the Landside Primary and Secondary Roads Component Project which is
a part of the Midfield Terminal Complex (MTC) for the Abu Dhabi International Airport
Development.
The project is based on a Main Contractor contract with a total construction period of 790
calendar days, including 5.5km of primary roads of 2 to 4 lanes, 8km of grade secondary
roads, 170, 000m2 of Asphalt surfacing for the primary and secondary roads, 11 No. post
tensioned bridge structures with spans in range of 36m to 50m with total length of 1.7km,
700, 000m3 of embankment and 1.7km of MSE Wall, and 4 electrical substation buildings
and associated electrical and mechanical installations.
The Primary Roads provide access and egress from the E-10 highway to the Midfield
Terminal Building (MTB). This looped roadway will provide the principal access point to
and from the MTB and will connect into the new E-10 intersection that is being
simultaneously constructed under a separate Abu Dhabi Department of Transport
contract. Between the E-10 highway and the MTB, the roadway is elevated on a
combination of cast-insitu post-tensioned bridge structures and embankment
Page 3 of 12
construction with earth reinforced walls provided at locations where embankment slopes
cannot be accommodated. In addition to the MTB, the Primary Roads also provide
structurally elevated access to the upper (third) floor of the MTB car park that represents
the principal parking facility for the terminal building. The approximate road area is
120, 000m2 with a total length of approximately 5, 600m with 2-4 lanes in each direction.
The Secondary Roads loop from the boundary of the airport with the E-10 intersection
and comprise of an at-grade local road network that is connected to the Primary Roads.
The Secondary Roads will provide access to the Employees Consolidation Centre, the
Long Term Car Park and the Landside Goods and Waste Facility that are critical facilities
for the functionality of the MTB. They will also serve the future development of the Airport
City commercial district. The road network comprises mainly two lanes in each direction
with roundabouts provided for traffic control at each of the aforementioned facilities. The
total length of secondary roads is approximately 6, 200m with mainly 2-lanes in each
direction.
July 2014
To June 2014
Project Engineer
at China State Construction Engineering Corporation, Middle Eas
Location :
United Arab Emirates
July 2008
To June 2014
Site Engineer
at M/s Mabani Delma Gen
Location :
United Arab Emirates
April 2013
To May 2013
Site Engineer
at ADSSC
Location :
United Arab Emirates
for Sewerage works for Marina break water, Mussaffah industrial area and Razeen
labour camps in Abu Dhabi.
labour camps in Abu Dhabi.
January 2011
To May 2011
Site Engineer
at ADSSC
Location :
United Arab Emirates
for Construction of SEWERAGE CONNECTION AND RELATED WORKS
(100 Million AED)
(100 Million AED)
January 2011
To April 2011
Site Engineer
at ADSSC
Location :
United Arab Emirates
for CONSTRUCTION OF SEWERAGE CONNECTION AND RELATED WORKS FOR
ISOLATED PROPERTIES IN ABUDHABI ISLAND AND MAINLAND - PHASE III.
ISOLATED PROPERTIES IN ABUDHABI ISLAND AND MAINLAND - PHASE III.
September 2010
To January 2011
Site Engineer
Location :
United Arab Emirates
for CONSTRUCTION OF SEWERAGE CONNECTION AND RELATED WORKS IN ABUDHABI
ISLAND AND MAINLAND - PHASE IV. ASSC CONTRACT NO. O.1903.
- Construction supervision
- Supervising office teams (drafting, quantity surveying, laboratory and surveying)
- Developing and preparing time schedules for project activities
- Co-ordination with consultant, client and sub-contractors
- In charge of pre-cast yard
- Preparing material submittals, shop drawings, payments, progress monitoring reports
and time schedules (in charge of draftsmen and quantity surveyors)
- Preparing as-built drawings and final quantities for the project
ISLAND AND MAINLAND - PHASE IV. ASSC CONTRACT NO. O.1903.
- Construction supervision
- Supervising office teams (drafting, quantity surveying, laboratory and surveying)
- Developing and preparing time schedules for project activities
- Co-ordination with consultant, client and sub-contractors
- In charge of pre-cast yard
- Preparing material submittals, shop drawings, payments, progress monitoring reports
and time schedules (in charge of draftsmen and quantity surveyors)
- Preparing as-built drawings and final quantities for the project
June 2008
To September 2010
Site Engineer
at HSE
Location :
United Arab Emirates
for SEWERAGE & SURFACE DRAINAGE NETWORKS & POND
DUBAI MUINICIPALITY CONTRACT DS 124 SEWERAGE & DRAINAGE WORKS AT AL KHAWANEEJ. (300
Million AED)
- In charge of all site activities.
Excavation of shallow and deep trenches and
manholes.
Construction of sewerage pipeline from Dia. 160mm UPVC to
1500mm GRP along with construction of precast sewerage
Page 6 of 12
Manholes /chambers up to 12 meters deep & sewerage
house connections 512 nos.
Construction of drainage pipeline from Dia. 400mm to
1500mm AC along with construction of precast storm
Manholes /chambers up to 9 meters deep.
All construction works at this project was along with existing
road therefore the safety &
DUBAI MUINICIPALITY CONTRACT DS 124 SEWERAGE & DRAINAGE WORKS AT AL KHAWANEEJ. (300
Million AED)
- In charge of all site activities.
Excavation of shallow and deep trenches and
manholes.
Construction of sewerage pipeline from Dia. 160mm UPVC to
1500mm GRP along with construction of precast sewerage
Page 6 of 12
Manholes /chambers up to 12 meters deep & sewerage
house connections 512 nos.
Construction of drainage pipeline from Dia. 400mm to
1500mm AC along with construction of precast storm
Manholes /chambers up to 9 meters deep.
All construction works at this project was along with existing
road therefore the safety &
Project Engineer
at ADAC
Location :
United Arab Emirates
Road, Utilities) for Main Terminal Land side, Abu Dhabi AirPort with
Site Engineer
at M/s Mabani Delma Gen
Location :
United Arab Emirates
Site Engineer
at M/s Mabani Delma Gen
Location :
United Arab Emirates
Site Engineer
at M/s Mabani Delma Gen
Location :
United Arab Emirates
Share on Facebook
Share on Twitter
Share Via Email