Engineering section Head
Halwani Brothers
Total years of experience :12 years, 1 Months
Leading Maintenance team that contain :
Senior mechanical engineer, Senior electrical engineer, and junior utilities engineer.3 supervisors, and 13 Technicians.
Executing and supervising all infrastructure projects.
TPM Total Productive Maintenance
Manufacture process improvement
Executing Saving Projects related to 5S Team suggestions (more than 10 Projects that have ability to achieve the best solutions for much problems).
Emailing the External Suppliers Company (JBT, Babcok, GEA, …).
Reviewing and coordinating with storekeeper all Dept.’s needing (Safety Stock and Reorder Level).
Leading LEAN Maintenance Team.
Preparing Study Technical Feasibility for each quarter(Capex List).
Reviewing and Approving on Purchase Requisitions.
Preparing Monthly Fault Analysis Report, Expenses Analysis Sheet and Preventive and corrective maintenance.
Completed Starting up and Commissioning for Production Line from 7/2015 to 2/2016.
Completed Start up for Ammonia Cooling Station.
Responsible for Maintenance MV and LV Panels, and Generator.
Responsible for Maintenance JBT Production Line.
Responsible for Maintenance Packaging Machine :
Ishida, Inno tech, Metal Detector, and Bradman Lake.
Responsible for Maintenance electrical Parts for Utilities Section:
Cooling Compressors, Cooling Pumps, AHUs, Steam Boilers,
Babcock Oil Boiler, and Air Compressors.
Responsible for scheduling Electrical PMP Activities :
Production Line, Utilities, and Infra structure.
Responsible for Preparing and Sending Purchase Requisitions and Preparing Monthly Report and Expenses Analysis Sheet for Electrical Dept.
• Projects :
Complete All Electrical Wiring During Start Up Production Line and Ammonia Cooling Station.
Design a program by using PLC Fatek, and Power circuit for Diesel Supply.
Design control and Power electrical circuit for Steam Boilers and Hot water supply.
Design control and power electrical circuit for city water station.
Economize Consumed Energy by Installing Power Factor Panels
Responsible for Leading Shift Maintenance Team
Responsible for Maintenance the Bruckner production line.
Responsible for Maintenance:
KAMF, ATALAS Scissors, METALIZATION, Babcock boiler, Cooling Compressors, and Air Compressors.
Familiar With Drive Motor Micro Master(420, 430, 440)
Familiar With Drive Motor Master Drive(MC, VC)