AHMED SHAKER BEHERY, Engineering section Head

AHMED SHAKER BEHERY

Engineering section Head

Halwani Brothers

Lieu
Egypte - Le Caire
Éducation
Baccalauréat, Control and Industrial Engineering
Expérience
12 years, 2 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :12 years, 2 Mois

Engineering section Head à Halwani Brothers
  • Egypte - Zagazig
  • Je travaille ici depuis janvier 2018

Leading Maintenance team that contain :
Senior mechanical engineer, Senior electrical engineer, and junior utilities engineer.3 supervisors, and 13 Technicians.
Executing and supervising all infrastructure projects.
TPM Total Productive Maintenance
Manufacture process improvement
Executing Saving Projects related to 5S Team suggestions (more than 10 Projects that have ability to achieve the best solutions for much problems).
Emailing the External Suppliers Company (JBT, Babcok, GEA, …).
Reviewing and coordinating with storekeeper all Dept.’s needing (Safety Stock and Reorder Level).
Leading LEAN Maintenance Team.
Preparing Study Technical Feasibility for each quarter(Capex List).
Reviewing and Approving on Purchase Requisitions.
Preparing Monthly Fault Analysis Report, Expenses Analysis Sheet and Preventive and corrective maintenance.

Senior Electrical Engineer (Maintenance) à Halwani Brothers
  • Egypte - Zagazig
  • juillet 2015 à janvier 2018

Completed Starting up and Commissioning for Production Line from 7/2015 to 2/2016.
Completed Start up for Ammonia Cooling Station.
Responsible for Maintenance MV and LV Panels, and Generator.
Responsible for Maintenance JBT Production Line.
Responsible for Maintenance Packaging Machine :
Ishida, Inno tech, Metal Detector, and Bradman Lake.

Responsible for Maintenance electrical Parts for Utilities Section:
Cooling Compressors, Cooling Pumps, AHUs, Steam Boilers,
Babcock Oil Boiler, and Air Compressors.

Responsible for scheduling Electrical PMP Activities :
Production Line, Utilities, and Infra structure.
Responsible for Preparing and Sending Purchase Requisitions and Preparing Monthly Report and Expenses Analysis Sheet for Electrical Dept.

• Projects :

Complete All Electrical Wiring During Start Up Production Line and Ammonia Cooling Station.
Design a program by using PLC Fatek, and Power circuit for Diesel Supply.
Design control and Power electrical circuit for Steam Boilers and Hot water supply.
Design control and power electrical circuit for city water station.
Economize Consumed Energy by Installing Power Factor Panels

Shift Engineer à Copack
  • Egypte - Le Caire
  • avril 2012 à juillet 2015

Responsible for Leading Shift Maintenance Team
Responsible for Maintenance the Bruckner production line.
Responsible for Maintenance:
KAMF, ATALAS Scissors, METALIZATION, Babcock boiler, Cooling Compressors, and Air Compressors.
Familiar With Drive Motor Micro Master(420, 430, 440)
Familiar With Drive Motor Master Drive(MC, VC)

Éducation

Baccalauréat, Control and Industrial Engineering
  • à Menoufia University
  • juillet 2011

Specialties & Skills

Lean Six Sigma
Reliability
Engineering
Maintenance
Communication skills
Microsoft
Project Mangment
Team Leader
PLC Programming
HCCAP INSTRUCTIONS
LEAN Manufacturing.
Root cause analysis
Brain storming
Production Engineering Value Stream Map

Profils Sociaux

Langues

Arabe
Langue Maternelle
Anglais
Expert
Français
Débutant

Adhésions

نقابة المهندسين
  • مهندس
  • August 2011

Formation et Diplômes

Fault tree analysis (Formation)
Institut de formation:
Engineering tracks
Date de la formation:
July 2021
Durée:
36 heures
lean six segma (Formation)
Institut de formation:
Engineering Tracks
Date de la formation:
September 2023
Durée:
36 heures
Maintenance and Reliability roadmap (Certificat)
Date de la formation:
March 2022
English Course (Formation)
Institut de formation:
Modli
Date de la formation:
May 2017
Durée:
32 heures
PlC Seimense S7-300 (Formation)
Institut de formation:
Instec
Date de la formation:
June 2017
Durée:
36 heures
PMP (Formation)
Institut de formation:
Engineers syndical
Date de la formation:
July 2017
Durée:
36 heures
CNC (Formation)
Institut de formation:
ITC
Date de la formation:
September 2011
Durée:
40 heures

Loisirs

  • KPIs
    Achieve high results with good points to improve.
  • Maintenance and Reliability
    I am very intersted and have Med Experince for them
  • Reading
  • Foreign Language Learning
    I achieved certificate level ten for English Course
  • Programming