Electrical Engineer in Maintenance administration
Al-watania Holding Company for Investment and Development. ( al-watania poultry )
Total years of experience :15 years, 7 Months
●responsibilities :
1- Completes electrical projects by supervising installations; resolving design issues
in Broiler and Breeder Sites
2- Maintains electrical systems by establishing and enforcing preventive maintenance, testing programs and scheduling repairs in Hatcheries Site
3- Provides operational power by developing and maintaining electrical systems
4- Planning capabilities concerning maintenance and personnel
● Achievements
- Increasing the safety reliability in hatchers machine by creating alarm system in series with
original system by the same fitted equipment without any additional parts
( Petersime Hatcher AS8H )
- Increasing the reliability in water chiller infeed pumps by modifying the operating
system From Standby/ Parallel mode to individually and Alternating operating system
( Wilo - Crono Twin DL-E......BF )
● Participated a technical training which was held at Petersime company located
in Belgium (The training included operation and programming of Bio-Iris
controlled Incubators) April 2012
● responsibilities :
1- prepare, implement and ensure preventive maintenance programs
2- Detecting malfunctions and defects in electrical systems and repair it
3- Forecasting and Placing orders for spare and replacement parts
4- Monitor and control the expenses of electrical Department
5- Ensures that all department technicians are trained on the operating procedures
● Achievements
- prepare a feasibility study, that loading the generator for 10 hours per day permanently for some
sections in the factory could save up to 77500 SR per year
responsibilities
1-Supervise the repair and maintenance of equipment in all sections of the
Sector
2- Writing a daily report on the maintenance work that has been