Ahmed Abdel Rahman, project manager

Ahmed Abdel Rahman

project manager

Alawi Tunsi Establishment

Location
Egypt
Education
Bachelor's degree, Civil Engineering
Experience
35 years, 8 Months

Share My Profile

Block User


Work Experience

Total years of experience :35 years, 8 Months

project manager at Alawi Tunsi Establishment
  • Saudi Arabia - Mecca
  • My current job since June 2013

Construction of a 200 bed hospital in Jazan for psychiatric and addiction.
Consists of 16 buildings which they are:
1. Main building containing surgery room, insulation rooms, swimming pool, theatre for lectures, and the serving rooms.
2. Nurses hostel building
3. Occupation therapy centres
4. Inpatient hostel building
5. Administration building
6. Office building
7. Mosque
8. Warehouse.
9. Chiller rooms building
10. Boiler room building for the HVAC system
11. Sewage treatment plant
12. SCECO room with 3 substations
13. 4 guard rooms
14. 6 rest villas
15. Landscape
16. Surrounding fence.

and
Construction of toile pilgrims in Holly Meccca containing
RC works, Precast cladding
Septic tank works
Infrastructure works.
Finishing works (plastering, fixing ceramic and marbles)
Electromechanical works
False ceiling
Landscape works
Slope protection and sand backfill.
Handing over progress report to the consultant to get the invoice.

Project Management Analyst at Al Majal Al Arabi Group
  • Saudi Arabia - Alqasim
  • May 2015 to May 2017

Rennovation of king Fahd hospital in Bureida.
Civil works, Vinyl works, Paintings.
Electromechanical works, elevators, renewals of electric plant, gas pipes, fire fighting system.

Projects Manager at Tanaghom Consulting office + Gulf construction Establishment
  • Saudi Arabia - Jubail
  • October 2009 to June 2012

onsulting office supervising the projects of the Tanaghom C Manager of : First municipality of Jubail governorate - Pavements + Storm water drainage plants + Roads urban planning + curbstone and interlock installation with the appropriate testing for the several sub-layers (sub base, base coarse, MC1, and asphalt placing ) + lighting projects + lifting water pump stations
huge RC bridge of span 600 m connecting Janna Island to Jubail )

SECOND: Projects manager for the GULF CONSTRUCTION ESTABLISHMENT ( GCE ) - Jubail Sector which composed of 6 projects : 1- A Multi-storey Multi-bay Residential Commercial High Rise building composed of 3 cars parking stories + 7 residential floors with 10 double floors stores in the front Including all finishings ( Fire fighting & Fire alarm system, AC ducts, outside units, water supply network, sewerage plant, cable trays & cable ladders, installation of cables, false ceilings ( gypson boards, square tiles, telephone, internet, CCTV, networks )
2- construction of 3 villas in Al Hamraa district each of which is composed of 2 floors+ appendix roof deck ceiling from A to Z 3- A palace in Jawhara district consists of a round visitors hall and a round multi storey building 4- Construction of a workshop composed of an RC building + steel frame covered area 5- Technical office administration whose scope was: a. Feasibility studies for proposedture projects b. Cost & time estimation, and time schedule, cash flow planning c. Revising designs to conform architectural drawing with structural, mechanical, electrical drawings d. Preparation of the shop-drawings and submit them to the consultant to be approved and construction e. attending meetings with the owners to write agreements and explain contract items to help for his acceptance 6- Trainning new workers, manufacturers, for technical performance, and project management to achieve the project main targets.

Project Manager at Al Adham contracting company for building and construction
  • Egypt - Cairo
  • June 2008 to September 2009

onsult C Cairo in which I worked as a project manager of SARAYAT AL KATTAMIYA PROJECT owned to 1 dings each of them is l bui 105 compound consists of residential his huge project is a T . ny ompa C basement + 1 ground floor + 5 iterated duplex typical floors + the infra structure plant ( water supply + drainnage system + fire resisting Plant + Electricity + Internet + Telephone + sewerage plant + Roads construction layer (Sub-base + base-coarse + pavements + curbs + Interlocks and curbstones …etc.) beside the food-court + mosque + mall as utilities of the compound which costs about 1, 500, 000, 000 LE (One billion, five hundred million Egyptian pounds)

Senior inspector engineer at Arab world Consulting company
  • Egypt - Cairo
  • September 2007 to May 2008

I did handle the execution of: located in Al Matareyya and the other is in Naam area one of which is buildings storey - two multi - First in cairo . villas in the first and the fifth society in NEW CAIRO 5 - Second They were also with super lux finishing some of them Flat slabbed some are hollow blocks slabbed in addition to false ceilings . or finishing works for a villa etc or more Some small contracts such as rising one floor - Third All of these contracts were by turn-key agreement of work and my fees agreement was at the cost plus system

Project sponsor/ self contractor at Personnels
  • Egypt - Asyut
  • December 2005 to August 2007

I did handle the execution of: located in Al Matareyya and the other is in Naam area one of which is buildings storey - two multi - First in cairo . villas in the first and the fifth society in NEW CAIRO 5 - Second They were also with super lux finishing some of them Flat slabbed some are hollow blocks slabbed in addition to false ceilings . or finishing works for a villa etc or more Some small contracts such as rising one floor - Third All of these contracts were by turn-key agreement of work and my fees agreement was at the cost plus system

Execution Manager - Debit Project manager at Al Amar Contracting Company
  • Egypt - Alexandria
  • May 2002 to November 2005

This to accomplish the execution of Al SARAB touristic village in the north coast at 41.5 km in Alex- Matouh highway, this project is a very huge compound consisting of 504 villas models A, B, C, D, E, F in which the precision; high quality time and Cost saving were the main targets for performance . On the other hand it involves so many utilities such as Swimming pools, gardens, land-scape pavement of internal roads + curbs + interlock works beside the infra structure of these utilities such as water supply pipelines+ sanitary water supply handholes and sewerage plant manholes + electricity & fire-fighting & telephone networks + subbases and basecoarse layers in addition to the high standard finishing Ateyya Hashim . y the Consultant Office of Dr and it was approved b s according to the consultant spec Office one of the highly distinguished consulting offices all over A.R.E.

Project Engineer at Triangle contracting company
  • Egypt - Cairo
  • February 2000 to April 2002

In which I handled the execution of 5 multi-storey multi-bay buildings in DreamLand area in 6 th of October City each building consists of double basement + 1 mezanine floor + 8 housing floors with their utilities

Project Engineer at Alex for Construction
  • Egypt - Cairo
  • July 1998 to January 2000

In which I was responsible about finalizing the steel bars fixing work of 5 buildings out of total of 8 CITY STARS by known - lf area which is now well buildings in the Grand Plaza in Gu

Project Engineer at Real Estates for National Banks of development
  • Egypt - Cairo
  • March 1995 to July 1998

in which I worked as owner consultant engineer and I handled First- NEVERT touristic village in Fayed which is composed of 28 challets + 2 villas and it was done to match with the super-lux finishing specs Second - The school of the National Bank for development in Cairo-Ismailia desert highway
Third - some committees of pricing real estates for the owners to cover guarantee letters and / or a loan they request to issue from the bank

vendor/ subcontractor at Misr for reinforced cement works
  • Egypt - Damietta
  • March 1993 to December 1994

That I had been self sub-contractor of The general Egyptian company for Reinforced Cement constructing a summer challets in Gamasa composed of 14 buildings each of them consists 1 ground floor + 3 typical floors + roof in the turn-key system. My role was shuttering formwork + steel fixing + Pouring concrete but I lost so much money so I could not continue, I left the project and sold the shuttering to another sub-contractor who replaced me.

Site Engineer at Genco Misr - Later " Inprejet"
  • Egypt - Cairo
  • February 1990 to June 1993

First employees of Assuit Petroleum industrial company including septic tanks + Pipe lines of water supply + Drainage network + Underground water tanks + Elevated tanks + sewerage manholes + electric manholes + Fire-fighting pipe-lines + Electricity and telephone networks + Backfilling up to the design level were deferred up to the buildings foundations got to end Factory for Electrical industries in Tenth of ) EMG
Finally I was working as tender studier to submit and bids The feasibility studies of new projects pricing items to prepare tenders - Third was one of the members of the technical office to make the shop-drawings and sometimes I needed to make a redesign for some elements to facilitate the work and/or to reduce the cost and/or time . On the other hand I was introduced to the committees of opening the envelopes and even in the bargain committees

Site Engineer at Agricultural Industrial Society
  • Egypt - Alexandria
  • June 1987 to November 1989

In which I was controlling a Water Desalination Station for potable water production which consists of complete Desalination plant including the Clariflocculator and the rapid Sand filter and a water lifting pump taking water from Naser Canal to higher level than foundation for which the ground water level was higher than foundation level so the consultant decided to use the well-point system dewatering and centripetal pumps to overcome the problem.

Education

Bachelor's degree, Civil Engineering
  • at Ain Shams University Faculty Engineering
  • June 1987

E-mail: Qualifications Bachelor degree of Civil Engineering - Structures department Graduated in Ain Shams University Faculty Engineering Date and Turn of Graduation: June 1987, First turn General Graduation Grade: Good Project of graduation: Theory of structures analysis Graduation Project Grade: Very Good

Specialties & Skills

Languages

English
Expert

Memberships

Saudi Council for Engineers
  • 169651
  • December 2013

Training and Certifications

PMP (Training)
Training Institute:
Egyptian Society of Electrical Engineers
Date Attended:
December 2012
Duration:
36 hours

Hobbies

  • Reading , Sports
    I love to be more cultured , through reading following cources of knowledge information such as internet, TV programs etc. On the other hand I like sports such as swimming , football, also mind sports such as chess game