Community Engineer
Octopus Handyman Technical Services LLC
Total years of experience :10 years, 11 Months
Managed Community Operations. Coordinate teams working in Sites, explain the scope of works, identify actions that need rectification guide them through process structures, take the lead on activities defend teams in all types of community services. Prepare Quotes for actions listed in move-in and move-out inspection, fit-out works, and communicate with customers for work status and handover of jobs. Managing the purchase of spares and consumables and maintaining stock inventories. Efficiently manage work and brief team prior to start of their duties and prepare schedules with teams on how activities are to be performed and executed daily. Manage emergency call-outs and schedule priorities for jobs
Managing team of operation associates, monitor productivity, give work assignments and regularly train evaluating their performances. Find and meet clients and increase business opportunities. Prepare and approve quotation for projects and prepare follow-up list study drawings and layouts. Manage and allocate project investment efficiently. Support in preparation of method statements and analyze risks for submission and approvals.
● Carry out manual planned and reactive maintenance on all MEP assets and systems within Client’s facility
● Prepare and submit summary reports of condition in building and recommend actions to be taken
● Carrying out risk assessments and develop method statements to ensure all operatives and tasks are carried out with safety
● Manage contractual activities, and contracts for scopes generated along the period of work.
● Maintain good and harmonious relationship with the client, sub-contractors and visitors and respond to all complains and requests promptly.
● Develop and ensure delivering of training and tool box talks for both technical and housekeeping staffs for various equipments used in sites.
● Ensuring optimal use of manpower and resources
● Respond to all RM’s, CM’s and generated new scope of works at the earliest for operational and occupational safety of all.
● Responding to all emergencies and situations that occur during and after hours to resolve requirements.
● Ensuring of all contractors visiting site follow proper induction PTW process to continue and follow the works.
● Prioritizing on disinfection and Sanitizing areas with zones infected (Since the pandemic) to keep a healthy work atmosphere.
● Maintaining all equipments certified and tested as per standard of works.
● Manufacturing of Custom Units
● Using Basic Designs and Employing them in proper way in manufacturing to reduce mistakes and errors. ● Understanding scope of job and employing them in efficient manner to get works done easily
● Installing of cables and units in appropriate locations on Site for work. ● Preparing quotations for BMS by reading the drawings and preparing point schedules. ● Preparing quotations for HVAC Projects by reading the line drawings. ● Involving in purchasing to purchase right materials from right sources. ● Very good UAE Market outsourcing knowledge materials from various Suppliers. Projects Handled/Worked on:
1. Envitec, USA:
● Fabrication, Erection and assembly of Custom made Ecology Units of various flow rate as per Client
Requirement
● Fabrication, Erection and assembly of Custom made ESP Units of various flow rate as per Client
Requirement. ● Assembly placement of manufactured Custom Units in Site as per Clients Specification.
● Maintenance of Previously supplied Custom units as per AMC Contracts. 2. LIVA, Al Furjan - BMS:
● Preparation of Project Estimate based on DELTA Controls, Automation. ● Preparation of drawings as per contractor requirement for Automation of building and getting approval of
work for same from client and consultant. ● Placing of Cables in Specified places for Automation of Buildings
● Installing of Automation system in Site for various units and specification. ● Preparing a report on daily basis and coordinating with project Engineer, Consultant and various
departments for proper work control and progress. ● Faster completion of work using available resources properly as per requirement. ● Monitoring and coordinating with personnel in sites to control and authorize work. ● Preparation of bills as per work status and timely. 3. JAFRA Labor Camp, Jebel Ali Industrial Area - HVAC:
● Installation of FCU, Split AC, VRF and FAHU as per Client Requirement. ● Installation of Copper pipes from units to riser location and connecting them with VRF’s in roofs. ● Properly Completion of all Installation with proper insulation, supports and fostering. ● Installing of Ducts as per Design requirements. ● Monitoring and Controlling of material resources to avoid wastage and completion of work as per
requirements
● Testing of all connections for leakages before closing of work. ● Coordinating wit site managers, foremen, about site progress and work status. ● Preparation of bills on a timely manner as per work status and progress, 4. Ennerwhere Marina-AC:
● Installing of FCU as per Client Requirement. ● Installing of copper pipe and completing all brazing, foster and supports and connecting to outdoor as per
Clients Specification. ● Creating a AMC with Client for maintenance of installed equipment's based on available maintenance
plans from company.
● Erection of all Mechanical Structures as per Design and Tolerances.
● Control and Monitoring of all site activities, Labors, Equipment’s and Material.
● Handling various erection work at multiple sites Simultaneously such that work is completed before
deadlines.
● Co-Ordination with clients, preparation of bills, arrangement and purchase of materials.
● Increasing Marketability in work for getting new orders of site work of erection and commissioning to
increase business and productivity.
● Finding ways to accomplish work by reducing cost of manpower, material, time and resources.
● Preparation of cost of quantitative analysis of materials required to work, such that work goes smoothly
and continuously and ends up within cost budget.
Projects handled/ working on:
1. Durga Petals:
● Erection and Commissioning of ladder in maintenance shafts for tower.
● Erection and commissioning of staircase grill work in towers.
● Erection and commissioning of shaft enclosures.
● Commissioning of Window and Balcony grills as per drawing and layout design.
● Erection and commissioning of vergola structures in high rise towers.
● Commissioning of fire pipeline in corridor section through the tower.
2. Vaishnavi Terraces.
● Erection of structure for elevation at entrances for tower.
● Commissioning of MS Cantilever beam through wall and supporting it through Wire rope for balancing of
weight.
● Erection of safety brackets in car park area.
● Erection and commissioning of grill work for gates, boundary and compound work, including fencing.
● Erection of Ladder at Maintenance shafts.
3. Prestige Lakeside Habitat.
● Erection and commissioning of all grill works such as Windows and Balcony in high rise towers.
● Erection and commissioning of Staircase grills in towers.
● Erection of various grills with different structures for villas with heavy structure design for car park areas.
● Erection for helipad access.
● Commissioning of AC grills and fire control pipeline as per designs.
● Commissioning of fencing for villas.
4. Pride Enchanta
● Erection and commissioning of Window and Balcony grill work as per site condition.
5. RMZ Ecoworld
● Erection and commissioning of framework for art gallery.
● Working as Project Engineer during establishment of all Equipment's and Machineries in the plant.
● Handling of new Projects design, development Erection and commissioning.
● Costing of projects, Machines their erection and commissioning cost before execution of projects and
maintaining them to finish the project within the estimated budget.
● Preparing cost analysis based on phase of projects completed.
● Supervising and Leading a team of workers in various job activities during installation stage.
● Using Drawing as a Primary source in finishing various works and to finish same in defined tolerances and
limits to reduce re-work.
● Creating new design changes for improved work results and benefits.
● Working on new projects for installation of new machines and improvising existing technology for better
results.
● Key Responsible in all kinds of Preventive, Productive, Plant, Planned and breakdown Maintenance
works related in field.
● Ability to purchase Inventory, control, supply and its usage.
● Working as “Maintenance ” was solely responsible of all machines to work properly in all conditions,
reducing breakdowns and faulty errors made by any personnel by best preventive actions.
● Serving also as one productive engineer employed in various operations of the firm starting from
installation of the firm and successfully running of all operations involved from maintenance of
machines to production of material as well.
● Also being involved in quality department to maintain standards in production quality in meeting
customer demands and their requirements, packing and storage of finished goods until dispatch of same.
● Control of all workers there shifts and all other operations in the firm effectively and efficiently.
● Being responsible in reducing monthly/annual maintenance expenditure and purchasing of right
materials with increasing material knowledge for spares of various kind in present local market.
● Also serving as working hand for Production during times of requirement has helped in learning
manufacturing process from material knowledge to alloy making in Aluminum Industry. Working in such a
place has helped me learn different material, their qualities and market knowledge for different materials.
● Learning and Employing new Techniques in finishing job.
● Involving in Project Engineers and making shop floor drawings.
● Manufacturing of pressure vessels of high capacity, as per designs and mentioned tolerances level.
● Reading of designs provided for manufacturing purpose.
● Correction and machining of old drill bits for increased reuse ability.
● Manufacturing of new drill bits as per standard guidelines.
● Operation of CNC cutting machines(Plasma and Gas) for sheet metal cutting as per requirement.
● Feeding drawings to machine for required cut in sheet metal.
● Manufacturing of AC ducts as per requirement.
● Air Conditioning Cooling Load calculations, Heat Loss calculations following ASHRAE codes
● Ensure safe work environments, control the use of material and avoid damages and waste, request
material, tools and equipment needed for the projects and issue the foreman daily instructions as per the
work plan.
● Responsible for Preparation of Bill of Quantity of Materials for Projects.
● Preparation of running bills as per work done at site & submitting the same to the client for payment flow.
● Managing and assisting the team of Engineers, Site supervisors team of workers to execute the work
efficiently.
● Maintenance of Machines periodically for wellness of it.
These programs include instruction in various system components, from computer programming to power systems, and cover technical subjects such as fluid mechanics, thermodynamics, Design, Drafting, Dynamics & Kinematics of Machine,Heat &mass Transfer and hydraulics & Pneumatics. Also received a basic understanding of civil engineering, electrical engineering, and chemical engineering. Many programs include coursework in fields where mechanical engineering is often applied, such as business or environmental science.
The course is designed to provide students with a solid foundation on the subjects through theory and application of theory on experiments conducted in the laboratories, guest lectures, seminars, etc., which will help in preparing for University level education.
The Secondary School Leaving Certificate (commonly referred to as SSLC) is a certification obtained by a student on successful completion of an examination at the end of study at the secondary schooling level in India. The SSLC is obtained on passing the grade 10 public examination commonly referred to as 'class 10 board examinations' in India. SSLC is a common eligibility examination popular in international markets many states in India, especially Kerala, Karnataka, and Tamil Nadu
URL removed due to policy violation. Please contact support for further information.