Sr. I&C Engineer
Louis Berger
Total years of experience :18 years, 5 Months
Design reviewing for technical submittal (instrumentation-SCADA-control system)
Review SAT test for SCADA and control panels.
Review and approve all instrumentation devices will use in this plant
Supervisor for all installation for instrumentation and control in this plant
Make commissioning and startup for SCADA system.
Make commissioning and startup for instrumentation.
Included in CV
- Review SAT test for SCADA and control panels.
- Review and approve all instrumentation devices will use in this plant
- Supervisor for all installation for instrumentation and control in this plant
- Make commissioning and startup for SCADA system.
- Make commissioning and startup for instrumentation.
Worked as a design and review system for Potable Water Treatment Plant (PWTP); Waste Water Treatment Plant (WWTP); booster pump station; and lifting station
Design, Supervision and estimator for Potable Water Treatment Plant (PWTP), Waste Water Treatment Plant (WWTP), Booster Pump station and Desalination Sea water plant
In Design and Supervision for Potable Water Treatment Plant (PWTP), Waste Water Treatment Plant (WWTP) and Booster Pump station.
my Task: design engineer for PLC, SCADA, control cables and Instrumentation
preparing technical offer and commercial offer
design control panel (from drawing until manufacture in our factory
design P&ID for water /wastewater/ RO plant
install engineer in site for instrumentation and control panel
My task: site electrical engineer for start up and commissioning for water treatment plant the below items:
- control panel
- MCC panel
- Cables
- Motors
My Task:
Electrical engineer in site for start up and commissioning for below items:
- Control panel
- MCC panel
- Instrumentation
-cables
- motors
Major study PLC, SCADA system, Instrumentation, Robot