ahmmed Shahid Bolar بولار, Senior planning and Scheduling Engineer

ahmmed Shahid Bolar بولار

Senior planning and Scheduling Engineer

Dar Al Handasah

البلد
المملكة العربية السعودية
التعليم
بكالوريوس, Mechanical Engineering
الخبرات
13 years, 11 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :13 years, 11 أشهر

Senior planning and Scheduling Engineer في Dar Al Handasah
  • المملكة العربية السعودية - الرياض
  • أشغل هذه الوظيفة منذ يونيو 2021

Client: Saudi Aramco (Nov 2022 to present)
VIP experience center-KAFD
PMC consultant with Saudi Aramco for preparation of LEVEL 3, PCS and reviewing contractors level4 schedules.

Client: Saudi Aramco and Total energies.(June 2021 to October 2022)
Project Management consultant for EPC of 18 Fuel Stations Projects across The Kingdom Of Saudi Arabia.

I contributed to setting up Project Control Plan & Schedule Management Plan. Approve/Validate Multiple Contractor Schedules, maintained P6 database for the client Portfolio, Validating contractor Weekly reports, and Developed weekly & monthly dashboards for the client.

Sr. Planning & Scheduling Engineer في Jacobs
  • المملكة العربية السعودية - الرياض
  • يوليو 2018 إلى مارس 2021

Ambitious 15 years Program in line with Kingdom’s VISION 2030 program. This will be World’s largest regeneration program.
Central Riyadh Regeneration program will have to Oversee and deliver ambitious Projects such as Public Realm, Infrastructure, Hospitality, Residential Units, Hospitals, Schools, Souks, Smart City Program, Energy, Social and Economic Programs in Central Riyadh Region.
I contributed in preparing Program Execution Plan, maintained P6 databases. Approved/Validated Consultants Schedules, supported data flow from P6 to PMIS.

Senior Planning Engineer في Petrolem, chemicals and Mining Company Ltd-Saudi Bin Laden Group
  • المملكة العربية السعودية - ينبع
  • ديسمبر 2012 إلى يونيو 2018

• All planning and control was using Primavera P6.
• Maintain, apply work and Work Breakdown Structure.
• Monitor, review, validate project status and invoices and ensure timely and accurate updating of project dashboard.
• Monitor, track, predict and report project statuses Daily/Weekly/Monthly.
• Develop and execute cost control systems such as Earned Value Measurement
• Prepare Project Baseline plans and conduct update of Project Progress
• Coordinate with project team and manager to develop, manage and control schedules
• Analyze Start, Completion and Duration Variances through approved baseline schedules
Forecast cost to complete approved cost amount
• Establish project scheduling controls such as maintaining project planning sessions and Project Schedules
• Preparation & Tracking of the project master schedule and summary level curves and Man Power Histogram.
• Identification, monitoring & streaming of Critical Paths running through the Project Master Schedule
• Setting the baseline project or tracking once the baseline project is issued.
• Daily/Weekly/Monthly reports generation including “S”-curves for client & Management review.
• Cost control by Optimization of Resources utilization.
• Experience in project supervision, estimating, procurement and cost control for the construction Co-Ordinating with subcontractors

Planning Engineer في Plant-Tech Arabia Co. Ltd. / Al Muzain
  • المملكة العربية السعودية - الجبيل
  • نوفمبر 2011 إلى نوفمبر 2012

• Have successfully completed 3 shut down projects like valve replacements, catalyst loading and unloading, Cleaning towers, Heat exchanger replacement, Reactor cleaning, drum cleaning and pipeline constructions.
• All planning and control was using Primavera P6.
• Aligning Project work scope with company structured WBS (Work Breakdown Structure).
• Understanding Project scope, needs and deliveries, contract milestones, estimating budget quantities, costs, resources using Primavera P6.
• Setting the baseline project or tracking once the baseline project is issued.
• Daily/Weekly/Monthly reports generation including “S”-curves for client & Management review.
• Preparation & Tracking of the project master schedule and summary level curves and Man power histogram.
• Identification, monitoring & streaming of critical paths running through the Project Master Schedule
• Job allocation to all Discipline Engineers and follow up for daily job progress.
• Responsible for all aspects of cost control, planning, contract administration and co-ordination, budgeting, financial reviews and cost appraisals.
• Involved in preparation of contracting out guidelines and control methods including all major project phases of project execution.
• Cost control by Optimization of Resources utilization.
• Experience in project supervision, estimating, procurement and cost control for the construction of pipelines.
• Reviewing the documentation.
• Co-Ordinating with subcontractors.

Piping Engineer في Anchan De Erectors
  • الهند - بنغالورو
  • أبريل 2010 إلى نوفمبر 2011

Responsible in preparation and reviewing of Test Packages, conducting hydro testing of U/G piping & reinstatement works.
Review of Hydro test Package and check the limit of test pack.
Create new piping drawing if any change or clashing with the other discipline.
Communicate and interfaces with other engineering disciplines.
Make decision if any construction technical query base on project specification.
Coordinate with Construction team for resolve matter at site.
Plan, monitor and coordinate with client.
Prepare target schedule and weekly status for the project assigned.
Check and review relevant shop fabrication drawings as per relevant code and project.
Make sure Isometric drawing for correct revision.
Isometric Drawing confirm to GA.
Boundaries of hydro test, filling / draining / vent point and ensure all necessary P&ID‘s / Isometric are in the package.
Check blind lists of sizes, thickness and rating.
Inspecting the incoming materials for damages, dimensions and corrosions and ensure that MTC is available and according to the requirements. Ensure satisfactory identification of materials, proper protection of piping and fittings. Verify proper size and schedule of pipe, rating of flanges, proper flange face and fittings.
Review Piping Isometric drawing & check the material take off.
Preparing the hydro test for different pressure rating of pipe.
Confirm repairs, re-testing and re-inspection in accordance with specifications. Ensure blinds are removed and correct gaskets are installed.
Verify that control valves and other items that were removed for the test are replaced. Check that water has been removed from check valves.
If specified on drawings, confirm that the vents and drains not required for operations are plugged. Verify that the startup screens are positioned at pump suctions.
Confirm that instrument-tubing connections are reconnected. Ensure removal of hanger shipping bolts. Check that the pipe supports and hangers are completed and ready for operation, Verify proper insulation and installation.

الخلفية التعليمية

بكالوريوس, Mechanical Engineering
  • في East West Institute of technology
  • أبريل 2010

Specialties & Skills

Project Management
Schedule Planning
Primavera P6
Project Planning
Project Control
Project Management
PrimaveraP6
scheduling
microsoft eccel
Risk Analysis ( Pertmaster)

حسابات مواقع التواصل الاجتماعي

الموقع الشخصي
الموقع الشخصي

لقد تم حذف الرابط بسبب انتهاكه لسياسة الموقع. يرجى التواصل مع قسم الدعم لمزيد من المعلومات.

اللغات

الانجليزية
متمرّس
الهندية
متمرّس

العضويات

Project Management Institute
  • PMI-Member
  • October 2015

التدريب و الشهادات

PMI-Schedule Professional (الشهادة)
تاريخ الدورة:
September 2020
Project Management Professional (PMP) (الشهادة)
تاريخ الدورة:
August 2016
صالحة لغاية:
August 2019
PMI-Risk Management Professional (الشهادة)
تاريخ الدورة:
August 2018

الهوايات

  • Reading, Learning, Exploring ideas, Listening to talks.