Strategic Tunnel Enhancement Programme (Deep Sewer Tunnel Project) Abu Dhabi, U.A.E.
Client/Consultant: Abu Dhabi Sewerage Services Company/CH2MHILL
This segment is the longest of the STEP Tunnel with a length of 16Km include TBM and NATM Techniques with deep shaft sinking up to 45m using Diaphragm Walls.
Responsibility
•Responsible for the preparation of TBM ring build report and issue the RFI for the daily work activity.
•Responsible for the Corrosion Protection Lining (CPL) activity execution.
•Successfully handled D-Wall, Base Slab, Capping beam construction and Shaft Excavation.
•Preparation and submission the transmittal and submittal for the Engineer’s Approval.
•Execution of permanent structure work.
•Preparation and submission the daily progress reports & NCR closing
Valued at AED 3.1 Billion; Al Salam street tunnel Project (Abu Dhabi Ring Road) for Govt. of UAE
Company Profile: A joint Venture of Samsung (Korea) & Saif bin Darwish, UAE
Responsibility
•Managed all activities related to tunnel construction utilities protection, Excavation support system, Excavation, Dewatering
•Managed construction of Structures (tunnel base slab, wall & Deck slab) and subsequent Waterproofing & structural steel work
•Responsible for preparation of ISR, Method statement & related documentations
•Responsible for liasoning with the Consultants for inspection and approval related activities
•Responsible for Material Resource Planning & preparation of all periodic progress reports, Monthly material request & store statement
Valued at AED 460 Million; Burj Dubai Development, Old Town project is a township cluster of 14 high-end premium residential buildings. At one time, this was the costliest sq. ft. residential area in the world
Company Profile: A premier construction company specialized in construction of high rise buildings, shopping malls, hotels, commercial complexes & villas
Responsibility
•In-charge, Buildings: Managed all activities related residential building construction from Excavation to Structures to finishing to handling over
•Project co-ordination: Managed entire process of subcontract finalization
•Responsible for Technical approvals; liaison with Consultants for inspection and approvals
•Project Planning: Responsible for preparation of project forecasting, resource planning & preparation of all periodic progress reports
Valued at INR 16 Billion; the project involved construction of 6.5 km of Delhi Metro Rail
Company Profile: JV of Dywidag (Germany), L & T, Samsung (Korea), IRCON (India) & Shimizu (Japan). IMCC for Metro Rail Project of Delhi Metro Rail Corporation (DMRC) in New Delhi
Responsibility
•Managed all activities related to Construction of Diaphragm, Wall pilling works i.e. Reinforcement, quality of bentonite, grabbing etc.
•Managed excavation, decking, utility support arrangement, strutting, strcture & architectural work for cut & cover tunnel &station building .
•Construction of road & filter and un filter water pipe line laying, diversion work.
•Subcontractor work inspection: structural steel work, structural & architectural work.
•Responsible for Progress reporting and preparation of weekly schedules for pilling & diaphragm wall Construction.
Specialized in Construction of high rise and industrial buildings, bridges & piling works
Projects Handled:
•Construction work of Bridge No 36 at KM 11/620, 3 x 45.7m +2 x 24.4m Spans (Semi MGR System) over Bokaro River in Jharkhand for RITES, project value Rs. 4.5 Crores
• Construction work (civil and structural) of Liquid Waste Treatment plant for Korba Super Thermal Power plant, stage I & II. For NTPC, Korba, project value Rs. 6.4 Crore
• Construction work of Govt. Women’s Polytechnic, Balidiah, Bokaro for Science & Technology Department, Patna, Bihar Cost of Project: Rs. 4.2 Crore.
•Construction work (Civil Foundation and structural tower, Trestle Bridges & pipe line laying) of yard utility pipe work Rourkela Steel plant Modernization Phase-II, for SAIL India Cost of Project 6.8 Crore
•Construction work of F.O.U.P.H. (Unloaded pipe house & Dyke area) D. M. Plant, N-Pit, Compressor house,
chlorination plant building, cable trenches pipe trestle, rail track Yard and ADM Building of Tenughat Thermal Power Plant Stage-I (210x20MW), Lalpania, Jharkhand for M/s BHEL (Bharat Heavy Electrical Limited) & M/s RITES Project Cost - Rs. 19 crore
Specialized in Construction of Bridges & Fly Over.
Projects Handled: Construction work for Road Bridge over Ghagra River at Turtipar, Deoria (UP)
Specialized in Construction of Industrial Buildings, Chemical Treatment plant & Multi-stories buildings
Projects Handled: Responsible Technical supervision, planning, Surveying, Billing, Quality Control for Construction work of API Channel filter bed, Pump house Affluent Treatment plant sludge 120 unit of “D” Type quarter
Responsible for handing over activity, documentation & liaisoning with the Consultant’s for inspection and approval.