and Piping work includes for the design, manufacture, supply and installation of Mechanical and Piping infrastructure for Process Facilities Re-lining, DE-lining, Substation, Storage and Transfer Trolley which forms part of the Ma’aden Aluminum Smelter Pot Relining Facility.
•Electrical design services (applicable to detail design required for equipment supplied), drawings, materials, equipment, labor, tools, expertise and supervision necessary to construct the electrical infrastructure of Re-lining, de-lining facility and Dust collection unit.
•Supply of control and instrumentation design services, PLC programming, configuration, drawings, materials, the equipment needed for the purpose of controlling, measuring, alarming, interlocking and optimizing the operation of the smelter pot relining facility, the labour, the tools, the expertise and the supervision necessary for the installations, as defined on the drawings and the contract documents.
•Working with all vendor for re-lining/de-lining facility i.e. dust collection system (STAS), wampfler/Conductix, Morello, Asselin, Equabras, REDA, Rockwell and ABB etc. for their system installation, functional and performance test
•Working with EPCM for all assign task and project actions
•Procurement of all Electrical, Mechanical, instrument and other project related components for complete Pot re-lining facility unit Process
•Shot blasting system, dust collection system, service piping and fire protection system
•Instrumentation design, software and hardware system installation for automation and control
•Interface work between automation and control refer to FDS, FAT/SAT and control philosophy
•Fire detection and fire protection system installation supervision and interface to Master system
•Leading EHS and QA/QC teams for their respective concerns, evaluation, coordination, certification and approvals
•Preparing Vendor Data Requirement(VDR) and setting Vendor Date Schedule(VDS) for document management and action list follow up and monitoring
•Preparation of red marks ups, reviewing and issuance of final black line/as built for final documents
•Preparation of cash flow and invoicing terms and condition refer to milestone and contract agreement
•Leading mechanical team for their technical inquiries, concessions and site instruction
•Monitoring all administrative concerns for better time management, working condition and discipline
•Leading planning and scheduling team for setting milestone, project deliverables, procurement tracking, monitoring sheets, S-curves, Look ahead plans and their compliance
•Daily and weekly meeting with client for daily progress, interface management and other project related concerns
•Daily internal coordination meeting with team for day to day progress as well as resource management
•Expediting logistics for timely material delivery through suppliers, manufacturers, procurement and their freight forwarders
•Contract review for variations, payment terms, Liquidity damages (LD) and other financial and legal impacts and aspects
•Analysis & Review of Contractors’ initial Planning Package (Schedules, CPA, Network, procedures etc.).
•Developing the Budget and cost controlling of the Assign Projects.
•Conducting regular site visits to assess the project progress.
•Liaising with client personnel for resolving field related queries in drawings.
•Maintaining Project cash flow status through earned value management analysis
•Project Close out with reference to data books, cash flows, variations, punch close out and other financial/technical actions
Senior Project Engineer (Site Manager) Plant Services and Long Form Contracts
Calcination Project -Refinery white side
Feeder Installation-Bauxite Refinery-Ma’aden Aluminum Refinery -SAMSON-Red site
Seed Filtrate to Re-Slurry Project -Ma’aden Aluminum Refinery-white side
Installation of Waxer Unit-Ma’aden/ ALCOA/BWG
•Represent company marketing strategy for new project and assignments with MAADEN contracts, Plant Maintenance & Engineering and procurement team within team and subcontractors
•Meetings for new projects and assignment for company business and MAADEN team support for project execution
•KOM for newly assignment as an project manager for setting KPI’s and milestone and critical path analysis
•Date collection for HVAC and firefighting designs
•All civil works related equipment and steel erection
•Providing red marks drawings, as built refer to GA plan and actual installation
•Project deliverables follow up and monitoring
•Planning and scheduling of all activities, materials and resources
•Preparation of all necessary constructability documents e.g. rigging studies, Risk assessments and JSA etc.
•Procurement, fabrication and erection of 10” dilution, PG lines and cooling water lines
•Hydro testing, commissioning and all NDT activities (MPI, PT, RT, PWHT)
•RPTFE butterfly valves selection and procurement, testing and installation
•Project close out walk downs and Punch clearance refer to Red mark drawings and as built
•Project close out reports and getting MCC & TCCC as an handover action
•Dossiers submission and document submission for all engineering, construction, EHS, QA/QC etc. documents
•Preparation of technical scope, work schedule, EHS Risk Assessments, Risk Management EHS, Inspection and testing plan review
•Leading detailed plan with planning engineers by setting milestones, critical path and project deliverable including daily, weekly and monthly reports and compliance
•Installation of new structure, equipment, media piping (chilled water, Hot water, Compressed air, Hydraulic, drain lines etc.)
•Laser Alignment services for Cardan shafts and coupling and all millwright services in scope
•Installation of new E & I layout for all equipment and their connections with current facilities -CCR
•Monitoring and supervising subcontractors for Firefighting systems, insulation, civil, and hydraulic system refer to project scope
•Administrate the site for employee's induction, necessary training, setting up site facilities, mobilization and demobilization schedules, equipment mobilization plan, tools store etc.
•Looking out services like Bolt tensioning, Hydraulic flushing by means of contamination units along Fluid control devices (FCU)
•Raising procurement request for required material and their timely delivery followed by technical review
•Technical feedback to subcontractor refer to design details and Company specification and work instruction