Planning Engineer
ABAJA CONTRACTING EST
مجموع سنوات الخبرة :11 years, 5 أشهر
ABAJA CONTRACTING ESTABLISHMENT, Kingdom of Saudi Arabia
Key Result Areas:
•Planning to execute the Security project and providing essentials requirements.
•Part of Designing Team for installation and commissioning activity of almost 300 Camera’s.
•Design coordination of security construction activities: Laying of optical fiber, Access Control System, CCTV Telecom etc.
•Experience in dealing with Brands like Milestone, Mobotix, Tycon Renewable sources, LENEL etc.
•Co-ordinating with site supervisors for the better accomplishment.
•Preparing L1 schedule and other planning schedule and ensure its timely completion
•Overseeing daily project activities, ensuring they are carried out as planned and taking remedial actions in terms of any gaps
•Preparing of Standard Operating Procedure’s (SOP) and Method of Statements for related works.
•Interacting with the project team about corporate events, meeting and milestones.
•Preparing and analysing reports
MNC Group (Transmission-Telecom Line Project)
Key Result Areas:
•Handling project change activities in terms of schedule, scope and budget of the project
•Ensuring timely completion of the project by coordinating with various teams for along with coordinating with PMT, Steering Committee and Contractors regarding various workshops.
•Overseeing daily project activities, ensuring they are carried out as planned and taking remedial actions in terms of any gaps
•Interacting with the project team about corporate events, meeting and milestones.
•Preparing and analysing reports.
•Quality Assurance and Control of Optical fibre cable laying.
•Ensuring proper communication between project team members
•Studied the different criteria like wind zone, tower design, soil resistivity and type, road crossing, railway crossing, aviation area, forest area etc. before execution of transmission line construction.
•Supervising cost/ budget management, quality assurance, site management, contract management and various techno-commercial functions
•Developing, managing and monitoring the performance of work force and conceptualising need-based training programs to facilitate smooth production operations
•Listing down the resource needed for projects after considering the budgetary parameters set
•Monitoring project status during the course of periodic project review meetings
Highlights:
•Well appreciated for successful completion of UPPTCL Project.
•Completion of designing for 2000km of OPGW cable Drums.
•Preparation of technical Section and uploading tender, successfully obtained tender of value more than 200 crores.
•Ensure Implementation of safety norms through EHS policy & maintain documentation to provide complete end to end solution
Dhanbad
Key Result Areas:
• Designing and supervision of 132KV substation erection and testing.
• Supervision for complete erection and mounting of substation equipment’s like 20MVA transformer erection, CT, PT, HT-LT panel, lighting mast, Structure material, Ciruit breaker and BusDuct layout
•Designing Earthing procedure for equipment as well as auxillary mat.
•Laying of HV Power cable and cable tray.
• Ensure Quality Condition’s and standards are met.
Highlights:
• Client-ACC Cement ltd, Sindri-Dhanbad
• Execution of activities following safety norms through EHS policy.
• Documentation and preparation of MB cum Site progress report regularly
- Dec’13
Project Implementation and planning.
•Transmission & Distribution certified professional with more than 4 years of experience in Site Management, MIS Planning Erection & Commissioning and Project Management of OPGW and conductor stringing.
•Earlier associated with ABB India ltd as electrical engineer in 132KV substation erection and testing Line Project.
•Expertise in swiftly ramping up projects with competent cross-functional skills and on time execution
•Skilled in handling operation & maintenance of transmission line & substation of 400KV, 220KV and132kv
•Well versed with installation and operations and maintenance of electrical power and lighting facilities.
CORE COMPETENCIES
Project Planning & Management
•Project planning and designing, QA/QC, Cost estimation, BOQ, tendering, Project execution, Inspection for quality work and safety, work measurement and billing etc.
•Implementation of Quality and safety management system, Internal and external Audits as per ISO 9001.
Site Management
•Ensuring the presence of men & material at sites to facilitate smooth execution of operations.
•Checking the material supplied is as per the set standards to ensure quality operations
MIS Management
•Assessment and documentation work for Security Construction Activity, Substation and Fiber work like Erection completion certificate(ECC), weekly safety and quality report, Material Receipt handling over certificate(MRHOV), Material dispatch clearance certificate(MDCC), Joint Measurement certificate(JMC), Daily progress report(DPR) etc.
•Creating MIS report and presenting it to the concerned department; monitoring the implementation of MIS processes and evaluating their effectiveness
Transmission-Telecom Line Project)
Key Result Areas:
•Handling project change activities in terms of schedule, scope and budget of the project
•Ensuring timely completion of the project by coordinating with various teams for along with coordinating with PMT, Steering Committee and Contractors regarding various workshops.
•Overseeing daily project activities, ensuring they are carried out as planned and taking remedial actions in terms of any gaps
Highlights:
•Managed most of the Projects as
Power Division)
Key Result Areas:
•Handled technical operations such as optical fibre cable splicing &testing.
•Managed the lighting & control and branch power systems for various projects
•Undertook technical calculations regarding load flow & short circuit studies and conducted fault analysis of electrical distribution systems
•Conducted technical studies such as energy audits, feasibility studies, life cycle cost analysis and evaluated electrical systems
•Planned & implemented preventive & predictive maintenance schedules for improving the overall reliability and safety of plant equipment & machinery
•Prepared system based documentation & conducted analysis of different maintenance data to reduce maintenance cost
Highlights:
•Completion of Challenging MIZORAM project-OPGW -79Km.
MIS Planning
Team Management
Supply chain management
Erection & Commissioning
Reporting & Documentation
Quality control & assurance
Electrical AutoCAD-Designing
PROFILE SUMMARY
Transmission & Distribution System
SOLDIER MONITORING SYSTEM
•Successful display of monitoring location and health standard of soldiers.
•Simulation such as PSM, Top view used.
Minor: SPEED Control of DC Motor Using Soft switching Technique.
•Achieved efficiency of 70% having a future scope of 82% efficiency.
•MATLAB & PSM used.
with Science
courses: Certified in Transmission & Distribution
courses: Professional Training in Transmission Stringing and Details