Akhtar Shaikh, HSE Engineer/Exe,Project/Planning Engr

Akhtar Shaikh

HSE Engineer/Exe,Project/Planning Engr

PETRONAS Carigali

Lieu
Arabie Saoudite - Dammam
Éducation
Master, NEBOSH,ME(Environmental),BE(Chemical),MA-Economics
Expérience
24 years, 6 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :24 years, 6 Mois

HSE Engineer/Exe,Project/Planning Engr à PETRONAS Carigali
  • Arabie Saoudite - Dammam
  • Je travaille ici depuis septembre 2011

• Supervise & Participate in the implementation of the HSEMS with relation to company and contractors
• Promote awareness of site personnel to HSE. Investigate incidents/accidents. Participate in Haz Identification
• Prepare Daily/Weekly/Monthly reports, audits, statistics, incident analysis of HSE activities, environmental discharges from the rig namely flaring, emissions & wastes etc.
• Perform RA & gap analysis to identify areas of continual improvement in HSE performance.
• Carry out study surveys on HSE matters related to company activities & suggest corrective measures to continuously improve all operational areas with established HSE laws
• Experience of HSE monitoring, compliance assessment, auditing and reporting schemes
• Carry regular HSE site reviews and inspections to monitor compliance with HSE policies & procedures.
• Prepare Environmental Manual (Schedule-D) for RIG site/ main camp as per Aramco Standard.
• Invite/ conduct air quality/stack emission testing & monitoring of diesel engines/ heavy vehicles.
• Sampling and laboratory analysis of water/ effluents and assist in results before safe discharge
• To prepare oil spill readiness plan and environmental procedures on waste management & emissions.
• Implement HSE initiatives and campaign in order to improve safety culture on site.
• Coordinate and report on Monthly HSE performance of the project.
• Prepare HSE document requirements i.e. Monthly Safety and Statistics Reports from Sites.
• Reviews/monitors Job Safety Analysis & Unsafe Act/ Condition Reporting program for contractors.
• Implement Annual Inspection Program, maintains Tracking System, follows up action items & close out

ENVIRONMENTAL/ SAFETY HEAD à Yamama Saudi Co Ltd(Process Plant,6.3Mtons/yr)
  • Arabie Saoudite - Riyad
  • juillet 2009 à août 2011

• To ensure all Risk assessments, MSDS, Incident Reports, Periodic site environmental inspections, etc., are available for inspection or audit or anyone need information to ensure compliance with all requirements.
• Design Environmental monitoring system.
• To conduct HSE meetings, write agenda & circulate its minutes to all concerned
• To draft the roles & regulations, policy procedures of company & planning the department activity & evaluation the plan to target achieved.
• Liaison director with ministries to coordinate Safety, Health & Environmental issue.
• To conduct fire drill & emergency evacuation exercises.
• To lead/ participate in the investigations of incidents/ accidents, advice & assist line management in writing reports, analysis of root causes & emergency response procedures.
• To prepare PPE policy, conduct training on its correct use, & monitor its usage in all work areas.
• To investigate & write detail reports on relevant environmental & safety & fire incidents.
• To prepare Safety & Environmental Manual of the Factory.
• To invite safety/fire consultants to inspect existing Factory set-up to suggest upgrading of safety/fire standards.
• To organize & conduct HSE training programs.

Operation Head à Pharaon Comm Investment Group(Petroleum,Chemical/Cement,H/O in Saudi Arabia)
  • Autre
  • novembre 1999 à juillet 2009

• To supervise & depute the production staff & services department staff according to priority of jobs to be attended to achieve production targets.
• Work in close liaison with Maintenance Engineers to resolve plant problems, condition monitoring to improve plant availability & reliability.
• Experience of operating Centrifugal & Positive Displacement Compressors, Gas & Diesel Engines.
• Monitoring of utilities e.g. CO2 removal system, Furnace oil unloading system & P.C. oil firing nozzles.
• To monitor production targets with maximum plant efficiency & energy conservation.
• Experience of operating PLC based instrumentation & Controls.
• Carry out study surveys on Safety, Environment & Health matters related to company activities & suggest corrective measures to continuously improve all operational areas with established HSE laws.
• Write work instructions & operating procedures in order to reducing downtime & manpower utilization.
• To carryout overall planning, scheduling & monitoring of daily, weekly & monthly progresses.
• Monitor fuel & power consumption on daily basis & analyze these figures against planned targets.
• To monitor budgeting & targeting of production levels on quarterly & monthly basis.
• To co-ordinate with Quality Control department for achieving the required quality limits i.e. PSI, ASTM & BSS.
• Logging of maintenance related works to utilize the planned / unplanned shut downs of plant.

Geotechnical/Planning Engineer à Pharaon Comm Investment Group(Petroleum,Chemical/Cement,H/O in Saudi Arabia)
  • Arabie Saoudite - Riyad
  • septembre 2003 à août 2005

Three Year Multi-Million Dollar Clinker Project:

Construction, Fabrication, Erection, Installation, Commissioning & startup of PLC based instrumentation & controls over 3300 TPD Clinker Project which includes Vertical Roller Mill 3700, Gas/ Diesel Engines, Centrifugal/ Positive Displacement Compressors, CO2 removal system, Five Stage Pre-Heater, Rotary Kiln.

• Prepare detailed design, technical schedules, client engagement and project deliver
• Prepare all preliminary workings like, feasibilities, presentations, estimations, time span, schedules.
• Prepare progress & cost reports to the high officials of the company on fortnightly basis.
• Supervision, planning, scheduling, budgeting, maintenance & monitoring progress of the project.
• Working as Site In-charge for Installation of Refractory Bricks & Castables.
• Write procedures, work over programs & completion reports of various jobs.

Éducation

Master, NEBOSH,ME(Environmental),BE(Chemical),MA-Economics
  • à NED
  • mars 1999

Specialties & Skills

Air Pollution Control
Water Conservation
Oil and Gas
Operation
Project Planning
NEBOSH,MS project,Lead Auditor,Planning, Scheduling, Trainings, Auditing, AP

Langues

Arabe
Moyen

Formation et Diplômes

Full day (Formation)
Institut de formation:
NEBOSH,IOSHA,Oil spill preparedness/Response,Flare Management/Reduction,Radiation Protection Officer
Date de la formation:
March 2005
Full day (Formation)
Institut de formation:
Lead Auditor of ISO 9001, ISO 14001 & OHSAS 18001 & H2S, Fire Fighting, First Aid practica
Date de la formation:
February 2007