Akram AlShrafi, Senior Manager Projects

Akram AlShrafi

Senior Manager Projects

DAMAC Properties

Lieu
Émirats Arabes Unis
Éducation
Baccalauréat, Bachelors In Civil Engineering
Expérience
18 years, 1 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :18 years, 1 Mois

Senior Manager Projects à DAMAC Properties
  • Émirats Arabes Unis - Dubaï
  • Je travaille ici depuis décembre 2016

Managing different teams (Consultants, Contractors, Designers, Planners, MEP & QS Engineers) to execute the following projects:
A) UAE:
1- Paramount Tower Hotel & Residence (3B+GF+11P+3.5AF+10.5HF+38RF+Roof): Under Construction with progress of 98.5%, and under Authorities Inspection to obtain DCD certificate and BCC.
2- Vera Residence (B+G+3P+26F): Under Construction with progress of 70%.
3- Reva Residence (B+GF+3P+27F): Under Construction with progress of 60.5%.
4- Damac Towers by Paramount (2B+GF+8P+60F+Roof) x 4: Operational and have some works and upgrades going on.
5- Al Manara (2B+LG+GF+2F+Roof): Under Construction with progress of 20%.
B) Jordan:
The Heights/ Damac Tower-Amman: Operational and have some works and upgrades going on. Tower (5B+GF+M+36F+Roof)
The Annex (5B+GF+M+6F+Roof)
The Courtyards (5B+GF+M+7F+Roof) x 2
C) United Kingdom:
Buckingham Gate- London (2B+LG+GF+8F): Under Pre-Construction Stage and advancing towards commencing physical Construction Stage on ground.
Responsibilities include:
• Initiating phase: Develop of the idea for the project is birthed and assure its feasibility determined.
• Planning phase: Determine and develop the methods to achieve the original idea as initially planned
and designed.
• Execution phase: Direct and manage all Stakeholders (Consultants & Contractors) as per approved
plans, within budget, and specified quality; In-addition to liaise for Local Authorities for Permits.
• Monitoring and Controlling phase: Assure all performed works are within specifications and control
limit.
• Closing phase: Assure to finish the projects and get all stakeholders satisfaction after handing over.

Project Manager à China State Construction Engineering Corporation (CSCEC)
  • Émirats Arabes Unis - Dubaï
  • février 2015 à novembre 2016

Managing a team of different engineering categories to execute Hilton 5 Star Hotel (B+G+13+R) including: Structure, Finishing, MEP, Infrastructure and Landscaping.
Responsibilities include:
• Initiating phase: Develop of the idea for the project is birthed and assure its feasibility determined.
• Planning phase: Determine and develop the methods to achieve the original idea as initially planned and designed.
• Execution phase: Direct and manage all worked as per approved plans, within budget, and specified quality.
• Monitoring and Controlling phase: Assure all performed works are within specifications and control limit.
• Closing phase: Assure to finish the project and get all stakeholders satisfaction after handing over.

Project Manager à Qscape Komtec L.L.C Subsidiary from AL QUDRA HOLDING
  • Émirats Arabes Unis - Dubaï
  • juin 2013 à février 2015

a) 64 Commercial Villas in Ain Al Faydah in Al Ain (In Initiation Process), b) T3-Q10 Terminal Container 19 Buildings in JAFZA area inside Dubai (14 months duration which already completed & closed successfully), and responsible to:

1. Executing the project on time, within the approved budget and in accordance with the contract specifications.

2. Ensuring that the quality of materials and the installation of work are in accordance with the criteria identified for the project.

3. Receiving of all relevant information regarding design, drawings and engineering.

4. Reviewing with the Construction Manager and the Planning Engineer the detailed programs for the execution of the project and ensure that the program is adhered to.

5. Implement all aspects of the project Quality Management System.

6. Ensuring that suitably qualified personnel required for the project are mobilized in a timely manner, as required.

7. Implement all HSE aspects related to the project.

8. Prepare material specification lists and schedules and follow up with the Procurement Cell for the procurement of material.

9. Reviewing the manpower requirements for the project.

10. Ensure proper material planning, allowing for sufficient time for approval and processing of Requisitions.

11. Compilation of all necessary progress reports.

12. Attending meetings with the Engineer/Owner and Sub-contractors.

13. Issuing instructions to the sub-contractors advising them of available work areas and reviewing their progress of work.

14. Identifying and taking the necessary corrective action to improve the progress and / or quality of work.

15. Handling of project petty cash, matters related to invoices, payments.

16. Responsible for cost/time impacts and claims.

17. Send / Receive and action project correspondence.

18. Staff training and appraisal.

Acting Construction Manager à Arabian Construction Company (ACC)
  • Émirats Arabes Unis - Dubaï
  • juin 2008 à juin 2013

(Dubai Mixed use Towers near Burj Khalifa, include: Hotel Tower 5Star: B1+Podium 4floors +26floor & Residential and Offices Tower: B1+Podium 4floors +45 floor plus Multi Story Car Park: 8 floors with two Tunnels & Two Bridges).

Project Engineer à Arabian Construction Company (ACC)
  • Émirats Arabes Unis - Dubaï
  • août 2006 à juin 2008

Project Engineer in Jumera Lake Towers (V3 Tower) (3B+Gr+39th floors)

Site Engineer(Civil Engineer) à Asqalan Enstitute for Construction & Development
  • Émirats Arabes Unis - Abu Dhabi
  • avril 2006 à août 2006

Zayed Sport City Stadium internal finishes/ Abu Dhabi/ UAE

Éducation

Baccalauréat, Bachelors In Civil Engineering
  • à Al-Najah National University
  • avril 2005

My Graduation Project is (The Future Design of Nablus Municapility under Dead and Seismic Loads). I Have many Certificates from Engineering Association-Jerusalem Center in Design and AUTOCAD. Note: I finished really my study before date but i get my certificate at this date.

Specialties & Skills

Tunnels
Parking
MS Project
SAP2000.v.9.03, AUTOCAD,MS-Project,Microsoft Office2003
ArcGIS9.0
Proffetional Management Program (PMP)
Project Management-Construction Management
Cost Control
High Rise - Building - Villas

Langues

Anglais
Expert
Arabe
Expert
Urdu
Moyen

Adhésions

Association of Engineers
  • Civil Engineer
  • June 2005
Project Management Institute (PMI)
  • PMP
  • November 2014

Formation et Diplômes

Project Management Institute (PMI) (Certificat)
Date de la formation:
January 2015
Valide jusqu'à:
January 2018
PMP (Formation)
Institut de formation:
Cambridge Education
Date de la formation:
October 2014
Durée:
40 heures
PMP (Formation)
Institut de formation:
Cambridge Education
Date de la formation:
March 2011
Durée:
40 heures

Loisirs

  • Sports
  • Traveling