production shift supervisor
Anton oil
Total years of experience :29 years, 10 Months
Iraq/Basra/Anton oil company /Majnoon oil field / Shift supervisor
Employed by the: Gasco company in Abu Dhabi as : Gas plant shift controller in Asab gas plant
OVERALL ACTIVITES
Preparing for shut down and start up activities
Fellow up the equipments defaults and fellow up solve the problems
Preparing for mid night daily reports
Identify all abnormal conditions in the plant
Monitor production levels and adjust production as needed
Monitor the chemical inventory
Conduct toolbox talk meetings (weekly )
Monitor and discuss production problems with co -workers and
Managers/supervisors.
Troubleshoot and problems solving (cooperating with author departments such as elec. mech. Inst. cavil. Etc
Keep the plant running smoothly .and meet HSE conditions
Agreement and signing for works. drivers. operators .senior operators for shift schedule and leave requests
Abu Dhabi Gas industries company ( GASCO ) As : Gas operator DCS plant panel ( the gas plant was under commissioning fro Italian comp. (Snamprogetti )
OVERALL ACTIVITES
• Activates before start up
Participates in the pre-commissioning and commissioning activities at the site of the plant
Actively participates in the transfer of responsibility of the site from Project to Operations, including clearance of punch list items to ensure safe and smooth start-up of the plant.
Prepares start-up procedures and organizational rules for the plant, Storage & transferring and Utilities facilities and leads their implementation on site.
Actively participates in the OJT of the young operators and in the coordination of the operations within the plant, Storage & transferring and Utilities facilities to facilitate safe and smooth start-up of the plant.
• Responsibilities are as follows:
•
• * Monitoring all alarms
• * Controlling all standard parameters :pressure temperatures levels flows chemical injection etc. as required .
• * start and stop all equipments : pumps, steam turbines gas compressors, propane comp. air comp. boilers .
• * preparing for shut down and start up activities
• *Monitor wells parameters
• * issuing all defaults requests
Producing condensate of 85, 000bbls/day with two identical train . Each one has :slug catcher. HP Sep. MP Sep. And stabilizer
Operating four re-injection centrifugal compressors at rate of 722 mmscft/day with 385 bar pressure.
2, 500 bbls/day sour water treatment
Nitrogen gas production .
R.O. Plant .(Reverse Osmosis water treatment)
4 boilers each having 40tons/hr capacity.
2Glycol units for gas dehydration.
Recovery centrifugal compressor, two stages, 86ton/hour, with 76bar discharge pressure. Running by steam turbine
Refrigeration system using two centrifugal compressors .
Flaring system.
Chemical treatment system.
Pig launching and receiving.
Employed by Al furat Petroleum Company (AFPC) (shell company in Syria) as Operation Supervisor in CPF ( Central production facilities ) and out stations.
Fulfill the following :-
Significant experience in leading operations/maintenance support teams including operational planning, shutdowns, project interfacing, personnel development/motivation and delivery of business objectives.
A sound knowledge of safety management systems, risk assessment, control of work, competency assurance and emergency response. Experience of preparation of budgets and managed control of costs, experience of managing contractors and sub-contractors both offshore and onshore; A good understanding of Reservoir and production services
experience of managing expectations of regulatory bodies and field partners
• Daily activity and Responsibilities are as follows:
Daily export of 200, 000 bbls of crude oil after dehydration and de-salting system
4 trains consists of 4 Free Water Knock out, 4 heater treater, Degassing boots, Surge tanks, transfer pumps, lacts, 2 shipping tanks, 6 shipping pumps with the capacity of 25000bbls/d.
water injection system with 6 reciprocating pumps capacity of 60m3/h at 130 bar pressure.
Gas compression facilities.
3 Gas reciprocating compressors with 14 mmscf/day each at 600 psi HP gas . Total export is more than 42 mmscf/day.
Dilution water system.
Chemical injection system.
Oil well operations
Operating well head (BP -Beam pump )
daily operating of the artificial lift pumps; PCP & ESP
Water well operations
Logging daily operations and production reports.
DCS (Distributed Control System)Operation in control room
8 out stations controlling.
Controlling HP and IP separators.
Power supply by gas generator and diesel generator.
Controlling unmanned out stations.
Petrochemical engineering in oil and gas processing