Involved in the following Projects:
Tendering and projects follow up Department
Enabling Works Qatar Economic Zone 1&3 Projects
Souq Waqif Car park Project
Sheraton Doha Renovation Project
Duties:
Preparing Baselines and following-up on site daily activities to perform and manage
project activity scheduling and monitoring
Preparing Man power, Staff & Resources forecast
Preparing tenders programs
Follow-up with all supplier on long lead items in order not to have any delay in
procurement
Follow-up on all subcontractors scope to hasten work and meet up target deadline
on site
Advice Project team of progress /delays and recovery measures
Produce Impact / EOT/ Programme.
Making Look Ahead program (Two Weeks & One Month look ahead)
Attend both internal and client meetings
Bank Al Etihad Branches.
Description:
Seven branches of a local bank in Jordan with new branding and interior design done by Allen International.
Each project consists of specific designs for Banking such as
- Skeleton works.
- Particular scheme for the safe and ATM rooms to ensure security.
- Security solutions covering areas such as CCTV, Intrusion alarm, Access control and Fire Alarm.
- Specific finishing - Bespoke furniture, complex ceilings, gypsum plaster,
natural stone flooring, wall cladding and wood paneling.
- Electrical, telephone, data and sound systems.
- Air-conditioning and ventilation systems installations, including internal
and external blocks. Pluming and drainage.
Duties:
Insuring material needed by the subcontractor is delivered to the site on time.
Following up on subcontractor's activities at site.
Preparing shop drawings for works to be done.
Making sure all works are done in accordance with approved shop drawings.
Resolving problems arising onsite
Preparing daily and weekly reports for works done on site.
Handing over completed activities to the engineer.
Al- Abdali District - Boulevard Project.
Description:
The project consists of:
• Underground: Four parking floors including technical spaces (Approx. 2000 car parks, built up area approx. 110000 m²).
• Construction of 12 separate buildings (approx. 115000 m² built up area) comprising of:
- 4 offices buildings and 8 residential buildings (served apartments)
(4 to 6 typical floors).
- Retail and restaurant area units at ground floor.
- Commercial spaces dedicated for health clubs and restaurants at roof and top of roof terraces.
Duties:
• Following up on subcontractor's activities at site.
• Making sure subcontractors are working in accordance with approved shop drawings.
• Insuring material needed by the subcontractor is delivered to the site.
• Resolving problems arising onsite in coordination with the technical department.
• Checking daily reports for subcontractors.
• Preparing daily reports for works done on spine and gallery areas.
• Handing over completed activities to the engineer.