Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Alaa Sabry, Electrical and instrument engineer

Alaa Sabry

Electrical and instrument engineer·Disouq Petroleum Company“ DISOUCO”

Egypt

Bachelor's degree, Electrical Power and Machines Engineering

Work experience

Total years of experience: 17 years, 10 months

Electrical and instrument engineer

May 2014 - Present

Disouq Petroleum Company“ DISOUCO”

Cairo, Egypt

May 2014 - Present

 Participated in electrical team for installation, pre-commissioning & commissioning and startup of new gas plant electrical equipment such as:-
 Three AGGREKO Rental generator packages each Cummins generator 400 volt, 1.2 MVA.
 Power substation 400 Volt Siemens switchgears.
 FEAG BLC system, to control and link the switchgears with DCS system.
 BMS & MEG injection unit with HIMA PLC system.
 Condensate stabilization heater & Fuel gas heater powered and controlled by Thyristor control panel.
 UPS (ABB POWERWAVE-33 80KVA)
 Sales gas engine compressor packages
 Nitrogen/Air compressors unit.
 Condensate storage and export pumps.
 Earthing and lightening system
 Open Drain system with Siemens PLC S7 system.
 Navigation and Lighting system
 Cathodic protection system.
 HVAC system.
 Participated in Instrumentation team for commissioning and startup of :-
 BPCS (Invensys DCS “FOXBORO”)  ESD & FGS “TRICONEX” system
 Flare automatic ignition system.
 Well site facilities as, RTU, WHCP, Solar cell and earthing systems
 Participated in issuing spare parts proposals for all equipment using SAP program.
 Participated in issuing preventive maintenance plan with tasks descriptions and the relative risk assessment.
 Implemented logic function block on BPCS to operate all pumps, fans and heater in automatic mode.
 Saved +150.000$ by relocated accommodation main distribution panel to a position reduced all power cables lengths, cables joints and saved power.
 Participated in implementation of CMMS system “GMS”
 Currently, Responsible for all troubleshooting and preventive maintenance for all electrical equipment.

Company industry:
Oil & Gas
Job role:
Engineering

on/offshore site electrical engineer

August 2008 - May 2014

Suez oil company

Cairo, Egypt

August 2008 - May 2014

Responsible for all troubleshooting and maintenance of all site equipment such as:-
 GE Gas turbine “Frame 5, speed Tronic Mark II  Power transformer medium and low voltage
 Emergency diesel generators (MAN&MUZZI)  Medium and low voltage electrical motors.
 FSD&VSD Pump motor control systems.  UPS (GUTTER & BORRI).
 Offshore Navigation aid and Lighting system  Over-head cranes
 Cathodic protection system  Earthing and lightening system
 Switchgears (SACE) maintenance, troubleshooting and calibration protection relays.
 Participated in upgrading of GE gas turbines Frame 5 from speed Tronic Mark II to speed Tronic Mark IVE.
 Participated in the SAT, commissioning and startup of new 22/11 KV power substation to tie in the national grid.
 Participated in the FAT, SAT, startup and commissioning of offshore 11/0.38 KV substation and power transformer.
 Participated in troubleshooting and splicing 11KV submarine cable.
 Participated in installation and startup of cathodic protection system.
 Updated a gas lift fan cooler motor control circuit to overcome permanent fuse burnt problem.
 Updated a R.O. unit electrical cabinet to overcome the repeated unit trip by different alarms.
 Prepared the annual budget proposals with following cost redaction policy.
 Materials spare parts proposals, requisitions, receiving and follow-up faxes.
 CMMS programs (Global Maintenance Solution Program "GMS").

Company industry:
Oil & Gas
Job role:
Electrical Engineering

Education

HELWAN university

May 2008

May 2008

Bachelor's degree, Electrical Power and Machines Engineering

Egypt

GPA (percentage): 62%

GPA (percentage): 62%

General Good with excellent final project.
View attachment

Skills

Transformer
Expert
Transformer
Expert
Generators
Expert
Generators
Expert
Motors
Expert
Motors
Expert
Offshore
Expert
Offshore
Expert
Switchgear
Expert
Switchgear
Expert
troubleshooting
Expert
troubleshooting
Expert
commissioning
Intermediate
commissioning
Intermediate
Testing, and quality assurance
Intermediate
Testing, and quality assurance
Intermediate
Risk assessment & Management
Intermediate
Risk assessment & Management
Intermediate
Complex problems solving & Technical writing
Intermediate
Complex problems solving & Technical writing
Intermediate
SAP and GMS.
Intermediate
SAP and GMS.
Intermediate
Transformer
Expert
Transformer
Expert
Generators
Expert
Generators
Expert
Motors
Expert
Motors
Expert
Offshore
Expert
Offshore
Expert
Switchgear
Expert
Switchgear
Expert

Languages

Arabic
Native Speaker
English
Expert

Training and Certifications

Certifications
FS Engineer SIS (TUV Rheinland).
Feb 2016 - Feb 2021
Show credentials

Training
Maintenance and Operation Of Gas Turbine Control System MARK VIE
GE.
Dec 2013
Show credentials