Alaa Osman, Technical Director (Data center Projects)

Alaa Osman

Technical Director (Data center Projects)

Meinhardt MENA

Location
Saudi Arabia - Riyadh
Education
Bachelor's degree, Pass with 62.6%
Experience
22 years, 1 Months

Share My Profile

Block User


Work Experience

Total years of experience :22 years, 1 Months

Technical Director (Data center Projects) at Meinhardt MENA
  • Saudi Arabia - Riyadh
  • My current job since October 2022

Projects Director - Data Centers 2022- 2023
•Manage new site design, development, pre-construction, and construction phases.
•Responsible for overall project management, project planning, scheduling, resource management, budgeting, construction, commissioning, and startup, and establishing and meeting critical project objectives.
•Early involved in the proposal phase, and participate in the proposalpreparation, subcontractors’ selection, and winning strategy definition.
•Plan all the activities of internal and external resources.
•Monitor the progress and performance of the various activities to reach thecontractual deadlines.
•Monitor project during execution, identify variations, coordinate with the clientteam, consultant team and the contractor on all activities, including the schedule, long lead items, Drawing and Materials
•Implement project procedures and use reasonable endeavors to ensure thatthis procedure is always observed.
•Review/Create/manage construction documentation for projects: method statements, computer planning schedules, safety plans quality plans, engineering drawings etc. All as necessary to meet project requirements.
•Allocate supervision and site staff requirements on specific projects.
•Manage project costs, estimate/evaluate contract variations.
•Monitor the financial part including contract budget, invoicing, Account Receivables & Cash flow- Identify, evaluate and limit technical and commercial risks.
• Participate in various visits and meetings including close-out meetings.
• Ensure compliance with internal or designated standards and quality requirements.
• Identify Risks and prepare risk register and related mitigation plans- Prepare- Review -Approve designs, Drawings, equipment, 5 level of testing.

Lead MEP Data Center Consultant at Edarat Group
  • Saudi Arabia - Riyadh
  • October 2013 to March 2022

Manage entire project life cycle from site selection and assessment, design various phases coordinating with designers and engineering experts to produce optimum design and meet target availability and client requirements with focus on Electro-Mechanical infrastructure systems design and calculations such as Power, security Fire alarm, low current, lighting, HVAC, Fuel, Leak Detection, Water supply, Drainage& Storm Water, control, and Fire Fighting Systems
• Design optimization and space utilization in coordination with deferent departments like architectural and Structural
• Generates project visualization, initial model using reference design templates and cost estimate for business case inception.
• Achieving handover plan, ensuring documentation completed on time & quality.
• Ensuring obtaining targeted Tier III & IV certification (i.e., TCCF, TCOS by Uptime)
• Technical review of RFPs and tenders, Verify, invoices, variations and delays in the works, report status and findings to higher management.
• Monitor key project processes, partnering with client to make improvements.
• Lead and attend key meetings to monitor progress, actively collaborate on solving problems and communicate impacts to partners.
• Coordinate with the client team, consultant team and the contractor on all activities, including the schedule, long lead items, Drawing and Materials
• Identify issues proactively and work with the team to resolve effectively.
• Monitor the day-to-day activities in the field, manage the flow of information, report and track issues arising from progress, quality, and safety.
• Handel special mission critical equipment (UPS, Rectifier, CRAH/CRAC, Chiller, Economizers, FAHU, chilled water pumps
• Undertake site location selection and risk assessment according to standards.
• Analyze CFM report and feedback to designer and take necessary actions.

MEP Construction Manager at Al Fara'a General Contracting
  • Saudi Arabia - Riyadh
  • December 2012 to October 2013

• Manage Mechanical, Electrical & Plumbing systems (Chillers, AHU’ FCU’s, Generators, Boilers, Laundry, central heating, transformers, LV & LC systems lighting, lightning & grounding, access control, CCTV, tel./intercom systems, BMS, Elevators, Fans, firefighting, Domestic and wastewater pumps, and Systems
• Manage Blueprints “Design, Shop, coordination, and As-built Drawings”.
• Order the required material on time and prepare long lead materials orders.
• Maintain and achieve the required level of quality using the available company resources.
• Follow up with subcontractors for the progress of works, quality, measuring the monthly bills and material delivery.
• Prepare the updated plan and progress reports (daily, weekly, monthly)
• Review/comments on all mechanical technical deliverables, including specialist supplier elements and interfaces, to establish that they are within budget, are fully coordinated and are buildable.
• Coordinates with project team to resolve mechanical technical related construction queries.
• Makes decisions within parameters set by area or technical managers, using job/ specialist experience.
• MEP inspections handling, follow up testing and commissioning, solve and clear all project problems.
• Implemented and enforced work schedule, completing different tasks on time.
• Manage large-scale construction projects for clients, ensuring they are delivered on time, within budget, with high quality.

MEP Construction Manager at hatco ( Al Hashemia General Contracting) Riyadh
  • Saudi Arabia - Riyadh
  • October 2011 to December 2012

Arab National Bank offices tower in Riyadh -KSA is a high rise building with 20 floors of offices, 3 data center rooms with precision cooling, and 4 basements for car parking. Besides separate 10 floors car parking. I achieved the targeted MEP works in a short time by managing all electro-mechanical team of engineers, technicians, and labors total of 40 person.
•Manage Mechanical, Electrical & Plumbing systems (Chillers, AHU’ FCU’s, Generators, Boilers, Laundry, central heating, transformers, LV & LC systems lighting, lightning & grounding, access control, CCTV, tel./intercom systems, BMS, Elevators, Fans, firefighting, Domestic and wastewater pumps, and Systems
• Manage Blueprints “Design, Shop, coordination, and As-built Drawings”.
• Order the required material on time and prepare long lead materials orders.
• Maintain and achieve the required level of quality using the available company resources.
• Follow up with subcontractors for the progress of works, quality, measuring the monthly bills and material delivery.
• Prepare the updated plan and progress reports (daily, weekly, monthly)
• Review/comments on all mechanical technical deliverables, including specialist supplier elements and interfaces, to establish that they are within budget, are fully coordinated and are buildable.

MEP Coordinator at Al-Rajhi Projects
  • United Arab Emirates - Abu Dhabi
  • May 2009 to September 2011

MEP coordinator, site pre-inspection, shop drawing handling, quality control, MEP inspections handling, Follow up testing and commissioning, solve and clear all site problems.
Review/comments on all MEP Technical deliverables, including specialist supplier elements and interfaces, to establish that they are within budget, are fully coordinated and are buildable.
Review/comments on all MEP Technical deliverables, including specialist supplier elements and interfaces, to establish that they are within budget, are fully coordinated and are buildable.
Makes decisions within parameters set by manager, using job/ specialist experience.
Implemented and enforced work schedule, completing different tasks on-time

Projects:
 Tameer Towers-Al-Reem Island -Abu-Dhabi
 Regal offices tower II @ business bay Dubai 2B+G+4P+27 floor

Sr. Mechanical Engineer at Al-Gurg Engineers , Consultants & Project managers
  • United Arab Emirates - Dubai
  • January 2007 to January 2009

-Design of water supply, drainage & fire fighting system for the building.
- Preparing specification, vendor list, and BOQ.
- Site supervision.
- Contact different authorities for the NOCs, design criteria and approvals for the design.
-Solve site problems
- coordinate design with all other services
projects:
* In the following projects my job was to design the various systems (i.e. hot and cold water supply system, firefighting system, chilled water piping sizing and duct sizing, drainage system, boiler and steam system, swimming pools, laundry, kitchen equipment, medical gases system, solar water heating (circulation), storm water system, gray water treatment plant, automatic irrigation system as per client requirement and as per local and international codes and standards)
 Bonyan twin towers: 2 towers( 3 B +G + M+33) story residential & offices towers (in Dubai Silicon Oasis ).
 RTA driver accommodation: 6 residential buildings + gym+ restaurant (3200person)
 Large offices building in DAFZA: 3B + G + 3 typical floors.
 Emirates Financial towers (EFT) 2 towers ( 3B +G +concourse +M +mezz + 27 story ) residential tower & offices tower with robotic parking (in DIFC) Dubai.
 Al Aqili tower: 2B+ G +M+19 typical floors apartment & commercial building) in business bay.
 Hatta Hospital: G+1 (200 bed) hospital in Hatta (Dubai) designed as per German specification and data sheets for DOHMS. (200 bed)
 Hatta Staff Accommodation: G+1 apartments building for Hatta Hospital staff in Hatta for DOHMS
 Football Association Complex: G+1 office building for national football association in Tall Al-Amardi
 (8 Nos.): Civil Defense fire stations in port Saeed, Al-Barsha, Omm Alcheif, , Al-marmom, TECOM, & Ac -Harice, palm Jumerah
 Elderly center for DOHMS: G+1
 Preventive center for DOHMS: G+1
 DPW: general store for Dubai Ports World (DPW)
 Galadari staff accommodation: G+3 in Dubai and Galadari General Kitchen
 Al-Zaroony offices building Podium + G + 19 offices building in business bay
 1400 villas (VENETO) for Ms Nakheel at Dubai Water front.
 4B+ G+7 HOSPITAL & 4B +G+7 HOTEL APPARTMENT @ Almuraqqabat- Dubai as per German specification and data sheets for ETA STAR.
 2 Nos. Al-Aweer vehicle Service station(2 Million ft2) for Dubai municipality(18 building for Dubai municipality with different types i.e. service stations, car washing, testing, tire stores, tire workshop, staff Accommodation, management building, etc.) +(15 building for Dubai government with similar buildings as Dubai municipality.
 Laguna tower: 3B+G +M+41 level hotel and Hotel apartment @ Dubai
 Some other project Design and supervision

Plumbing designer/ Mech. Site engineer at Excel Engineering Consultant (electro-mechanical)
  • United Arab Emirates - Dubai
  • August 2005 to January 2007

design of water supply, drainage & fire fighting AC ducting and chilled water piping, site MEP supervisor, MEP managers for the benefit of the contractor, site pre-inspection, shop drawing handling, quality control, MEP inspections handling, attending MEP progress meeting, monitoring site status to GM.

Projects:
 3 residential towers within Jumeirah Beach Resident (JBR) sector 02 (2 towers 44 level +1 tower 48 all having on one podium) :( As MEP managers on behalf of the contractor (Saleh Construction)) Excel Consultant got a job to involve in all the electro mechanical issues and to motivate the progress and enhance the quality of the site installations in order to get the work approved by the main consultant (Hyder Consultant). I studied the case and monitored each part of the project (i.e. material deliveries, staff and labor, quality control, planning and inspection follow up etc. then the works improved and got approved with job completed within 12 months only
it was a great achievement to me and a godd record for my company.
 Al-Khan Hotel - Sharjah: B+G+2 story 150 studios for Sheikh Saqer bin Sultan Al-Qasemi (supervision)
 2 towers Residential Buildings- SHJ: 3B+G +18 & G+m+2p+14 (supervision)
 Sheikh Hamdan bin Rashed (Villa, staff accommodation, boat workshop, central kitchen and private airport in Abu Dhabi Al-Yassat Aali island near to Al Silaa (supervision)

Maintenance Engineer at International Cayren splendid marble co.
  • Egypt
  • May 2003 to August 2005

maintenance for diesel air compressors, generators loaders dampers, drillers and earth-moving machines.

maintenance engineer at Egyptian Danish for Ice cream
  • Egypt
  • September 2001 to May 2003

responsible for operation And maintenance of all mechanical machines, Generators, boilers, pipe lines and pumps, refrigeration, and water treatment station

Education

Bachelor's degree, Pass with 62.6%
  • at Alexandria University/ faculty of Engineering
  • November 2001

Department: Marine Engineering & Naval Architecture Graduation Project: Fast Response Water-Jet Propelled fire fighting tug boat Graduation project Degree: Very good Other Certificates: From the Arab Academy for Science and Technology and Maritime Transport 1- Personal survival Techniques and search and Rescue 2- Fire Prevention and Fire Fighting 3- Medical Emergency Basic training "Elementary first aid"

Specialties & Skills

Planning
Project Management
Plumbing Design
Firefighting
design of water supply systems for buildings
design of fire fighting system for building
design of drainage system for building
computer and internet skills
AutoCad
MEP Coordinator
Sr. Mechanical Engineer
engineering management
project planning
project execution

Languages

English
Expert
Arabic
Expert
German
Beginner

Memberships

Egyptian engineering syndicate
  • Mechanical Engineer
  • December 2001
الهيئة السعودية للمهندسين
  • عضو
  • October 2011