Aladdin Adnan, Project Director

Aladdin Adnan

Project Director

Abdul Ali Al-AJMI Engineering Construction

Location
Saudi Arabia - Jeddah
Education
Bachelor's degree, Civil Engineering
Experience
11 years, 1 Months

Share My Profile

Block User


Work Experience

Total years of experience :11 years, 1 Months

Project Director at Abdul Ali Al-AJMI Engineering Construction
  • Saudi Arabia
  • My current job since December 2018
Senior Project Manager at Al Sahara Group
  • United Arab Emirates
  • October 2016 to August 2018

Municipality) Project: Rehabilitation of Old Roads and Bridges in Abu Dhabi South Area and Construction of New Roads in South Zone. (100, 000, 000 DHS). Client/ Funder: Abu Dhabi Municipality (Governmental Agency- funder).

Construction Manager at Bin Hafeez Contracting Company
  • United Arab Emirates
  • May 2005 to March 2009

Client: RTA, (850, 000, 000 DHS). Consultant: PARSONS. Project: Ras AlKhor Crossing. Utilities, Roads and Interchanges
Scope of Work: The project is consisting of the construction of drainage network (21 km) of 1800 mm and 1600 mm dial including manhole and irrigation networks (21 km) storm water and wale networks (AC and GRE pipes) and road works in additional to construction of 9 bridges in oud metha area in addition to the construction of 10 km Highway Roads from Al Khail Roads to Business Bay Bridges. Roles and Responsibilities (For All Infrastructure, Interchanges& Roads):
• Checking the design drawings which submitted by consultants.
• Construction of drainage pipes 1800, 1600, 1400, 1200 and 100 mm dia.
• Construction of drainage manhole (Base, lower and Upper haft, Reduce and Slab).
• Construction of built in piece and makeup piece with manhole.
• Design pipe lines profile and construction of irrigation chambers (washout, gate value, flow control, air value).
• Connection to existing line by ordered material required for connection (AC pipe with GRE pipe).
• Design pipe line profile for water Networks and construction of water line AC pipes and GRE pipe with concrete surround road crossing
• Construction of water line chambers (washout, gate valve, air valve).
• Calculation of payment certificate.
• Construction of sewerage bumps stations.
• Preparation of Road formation and installation of wet mix and BASE course and final wearing course.
• Road marking and installation of concrete barriers for both road sides.
• Installation of street light foundations and poles.
• Ensure that all traffic diversions drawings will be approved from RTA prior to start the Road Diversion.
• Relocate of all kinds of pipes prior to start the Road Diversion by Special protections. Construction of all Road Crossing utilities with special concrete surrounds and Ensure that All Utilities Have Been Diverted Prior Starting the Construction of Piles
• Following all Ramp Works for Bridges Including Back Filling of Approved Materials, MC, and Asphalt Works

Education

Bachelor's degree, Civil Engineering
  • at Jordan University Of Science And Technology
  • June 1999

Specialties & Skills

CONSTRUCTION
BRIDGES
CONTROL VALVES
FLOW CONTROL
INFRASTRUCTURE
REHABILITATION
INSTALLATION
IRRIGATION (LANDSCAPING AND AGRICULTURE)
VALVES (PIPING)
COLLABORATION

Languages

English
Expert
Arabic
Expert

Training and Certifications

Master of buisness Admistration / Australia (Certificate)
Date Attended:
January 2014

Hobbies

  • Reading