September 2001 up to April 2008
Company: IDEX INDUSTRIAL CONTROL CORPORATION
Unit 4QA, 4th Flr. ODC International Plaza
219 Salcedo St., Legaspi Village Makati City, Philippines
web:
http://www.idex.ne.jp
Position: Instrument Supervisor / Project In-Charge
Project Name: Renovation of Site, Ortigas Learning Foundation Inc.
Address: Emerald Building Ortigas Center, Philippines
Assignment: Auto CAD Engineer / Project In-Charge
Duties and Responsibilities
o Site design according to the client request.
o Electrical design.
o As-built drawing
Project Name: Renovation of Site, Prestige Tower
Address: Prestige Tower Ortigas Center, Philippines
Assignment: Auto CAD Engineer / Assistant Project Supervisor
Duties and Responsibilities
o Site design according to the client request.
o Electrical design.
o As-built drawing
Project Name: LRT LINE 1 (CAPEX) Capacity Expansion Project
Address: SIJV- LRTA Depo Philippines
Assignment: Auto CAD Engineer / Lead Man
Duties and Responsibilities
o Actual Site design.
o Reviewing of material specification and requirements
o Trouble shouting for all the station automation control.
o As-built drawing
Project Name: YOKOHAMA Tire Philippines Inc.
Humidity Chamber Construction - Instrumentation
Address: IE5 Clark Field, Clark Pampanga
Assignment: Instrument Supervisor / Project In-Charge
Duties and Responsibilities
o Prepare the design according to the specification needs on the materials to be heated.
o Construction the Humidity Chamber design of control.
o Installation of all the instruments and calibration works.
o Commissioning the Humidity Chamber
Project Name: YOKOHAMA Tire Philippines Inc.
Drum Tire Testing Room - Instrumentation
Address: IE5 Clark Field, Clark Pampanga
Assignment: Instrument Supervisor / Project In-Charge
Duties and Responsibilities
o Prepare the design according to the specification needs of the tires to be reheated or not.
o Construction the of the Drum Testing control panel
o Material Procurement
o Installation of all the instruments and sensor.
o Commissioning the Tire Testing Temperature Control
Project Name: ROHM Electronics Philippines Inc.
Waste Water Treatment Project
Address: IE Tech. - Science Industrial Zone, Carmona Cavite
Assignment: Instrument Supervisor / Project In-Charge
Duties and Responsibilities
o Material Procurement
o Monitoring, scheduling and progress reports
o Punch clearing
Project Name: TOSHIBA Information Equipment Phils. Inc.
Phase 5 Water Treatment Project
Address: Techno Park, Sta. Rosa Laguna, Philippines
Assignment: Instrument Supervisor / Project In-Charge
Duties and Responsibilities
o Material Procurement
o Monitoring of on-going construction works
o Scheduling and progress reports to client
o Punch clearing
Project Name: APMS 48 T/H Boiler Project - Babcock Hitachi (Phil.) Inc.
Blower Control System - Design & Engineering
Address: IICC Office, Makati City, Philippines
Assignment: System Project Supervisor
Duties and Responsibilities
o Logic Diagram Design
o Safety Interlock for the Soot Blower Control System Design
o PLC programming for the Blower.
o Downloading of the control program to PLC before shipping to client.
o Control Panel assembling
o FAT with the client
Project Name: BBSP 116 T/H Boiler Project - Babcock Hitachi (Phil.) Inc. FAM3 R3 System (PLC) - Design & Engineering
Address: IICC Office, Makati City, Philippines / BHK, Kure, Hiroshima, Japan
Assignment: System Project Supervisor
Duties and Responsibilities
o Ladder / Logic Diagram Design
o Safety Interlock for the System Design
o PLC programming.
o Downloading of the control program to PLC before shipping to client.
Project Name: Boiler Rehabilitation Unit 2 & 3, Ajinomoto Philippines Inc.
Address: Pasig City, Philippines
Assignment: Assistant Engineer