Conducts design reviews of telecommunications facilities such as, but not limited to, fiber optic cable (FOC) - including OPGW, OSP, and indoor; UTP cabling; Terrestrial Trunked Radio (TeTRa) network; and voice and data communication network.
Conducts design reviews of telecommunications facilities such as, but not limited to, fiber optic cable (FOC) - including OPGW, OSP, and indoor; UTP cabling; Terrestrial Trunked Radio (TeTRa) network; and voice and data communication network.
Globe Zeal Project
Mindanao Agrregator Ring7 (Vitali-RTLim-Ipil Segment), Huawei Technologies Philippines
Conduct survey, and manage implementation of fiber optic cable (FOC) installation and its required infrastructure such as trenches, conduits, maintenance/man/hand holes, utilizing HDD (Horizontal Directional Drilling)or manual excavations.
Combined Cycle Power Generation & Support Facilities Projects
Shaybah Crude Increment Projects Div. - Oil Facilities Projects Dept. - Saudi Aramco Project Mgt. Team
Conduct survey & review of design drawings, MTOs submitted by contractor; Manage implementation of projects to assure that the projects are done in accordance with safety and quality procedures and requirements; Includes outside plant (OSP) fiber optic (FOC) and copper cables, duct banks, Horizontal distribution - structured cabling system (SCS), telecommunication rooms (TR) electrical power designs - power distribution panels (PDP), Grounding, UPS, Intrusion Detection and Assessment System (IDAS), Tank Cathodic Protection.
Permanent Communications Projects
Early Works & Infrastructure Div. - Shaybah NGL Projects Dept. - Saudi Aramco Project Mgt. Team
Conduct survey & review of design drawings, MTOs, and PRs, submitted by contractor; Manage implementation of projects to assure that the projects are done in accordance with safety and quality procedures and requirements; Interface coordinator for contractor’s and other project contractors’ clashes and interconnections. Includes outside plant (OSP) fiber optic (FOC) and copper cables, duct banks, inside plant (ISP) cabling, PABX, data equipment (routers, switches, wireless access points), structured cabling system (SCS), telecommunication rooms (TR) electrical power designs - power distribution panels (PDP), UPSs, circuit breakers, wire dimensioning .
Karan Sulfur and Manifa Gas Facilities Project
Saudi Aramco Khursaniyah Gas Plant, QC/QA Dept, GS Construction Arabia
Communications QA/QC Inspector - Aramco Approved with SAP Number 70010908
Inspection of drawings, materials, & equipment prior to installation. Checking of conformity to standards such as, NEC, BICSI, ANSI/TIA/EIA, NEMA, Saudi Aramco Engineering Standards (SAES), Saudi Aramco Material Systems Specifications (SAMSS), etc., of materials, equipment, installations, and facilities. Materials such as FOC (Fiber Optic Cable), Category 6/6A 100-ohms Balanced Twisted pair, Layer 2/3 switches, Data Acquisition Servers, Wireless access points, OSAS (Open Substation Automation System), LAN, WAN, Paging System, SCS (Structured Cabling System), and telephony.