Maximum upload file size: 3MB. File types allowed: jpg, jpeg, gif only.

Click the above 'Browse' button to select a photo.
Guidelines
  1. Only upload a photograph of yourself
  2. Photos of children, celebrities, pets, or illustrated cartoon characters will not be approved
  3. Photos containing nudity, gore, or hateful themes are not permissible and may lead to the cancellation of your account
  4. Photos of your passport, ID, or photos containing any personal information such as your address, passport number, or contact details are not permissible for your own security.

Delete Guidelines

Alexander Tolentino

Project Engineer (Civil)

Location:
Philippines
Education:
Bachelor's degree, Civil Engineering
Experience:
26 years, 8 months

Work Experience

What's your work experience? Your experience is one of the most important sections in a CV.
List all relevant responsibilities, skills, projects, and achievements against each role.  If you're a fresh grad, you can add any volunteer work or any internship you've done before.
Add Experience

Total Years of Experience:  26 Years, 8 Months   

July 2008 To December 2012

Project Engineer (Civil)

at Qatar Gas Transport Company Limited (NAKILAT)
Location : Qatar
The project involved the contstruction of ship repair and ship building facilities.

JOB DESCRIPTION:
1. Ensured that the construction activities were in compliance with health and safety rules, quality specification, performance requirements and project objectives called for in the contract.
2. Reviewed thoroughly all contract documents, with the help of discipline engineers and listed out the discrepancies between various documents for discussion.
3. Coordinated with various engineering disciplines to ensure that specifications are complied with and the design meets the requirements laid down in the contract documents.
4. Coordinated with procurement and site management team to ensure that all materials are received at site on time.
5. Coordinated inter discipline checks of various documents in accordance with Contractor’s Work Procedures.
6. Assisted the Project Manager to resolve technical issues/clarifications and preparation of progress reports.
7. Took daily site photos of all ongoing activities and compiled these together in the daily reports.
8. Checked and evaluated shop drawings, quality plans, method statements, inspection test plans, and material approval requests.
9. Directed and supervised field construction activities.
10. Directed the consultant’s and contractors’ supervision staff.
11. Participated in regular meetings.
12. Coordinated and conducted joint inspections of completed works with contractors, consultant, and end-users.
13. Conducted handover of completed works to the end-users and checked submitted project dossiers and as-built drawings.
April 2007 To June 2008

Civil Engineer / Supervisor

at JGC Corporation
Location : Philippines
Coral Bay Nickel HPP2 Project
(Construction of Nickel Processing Plant Phase 2)

JOB DESCRIPTION:
1. Supervised all civil works (earthworks, concreting works, paving works, acid proof lining works).
2. Ensured that the construction activities were in compliance with health and safety rules, quality specification, performance requirements and project objectives called for in the contract.
3. Directed and supervised field construction activities.
4. Directed the subcontractors’ supervision staff.
July 2005 To November 2006

Civil Engineer / Supervisor

at JGC Corporation
Location : Bahrain
Low Sulfur Diesel Production (LSDP) Project
Bahrain Petroleum Company (Bapco)

JOB DESCRIPTION:
1. Supervised civil works (earthworks, foundation works, structural steel erection and installation of underground facilities) on the construction of Hydrogen unit, Hydrocracking unit and Sulfur unit and on the HDU Revamp works at the existing area.
2. Ensured that the construction activities were in compliance with health and safety rules, quality specification, performance requirements and project objectives called for in the contract.
3. Directed and supervised field construction activities.
4. Directed the subcontractors’ supervision staff.
August 2003 To January 2005

Civil Engineer / Supervisor

at JGC Corporation
Location : Kazakhstan
Atyrau Refinery Reconstruction (ARR) Project
Kazmunai Gas

JOB DESCRIPTION:

1. Supervised civil works (pile driving, earthworks, foundation works, building of concrete equipment structures and installation of underground facilities) on the Gasoline Diesel Hydrotreater unit and Hydrogen unit. Weather temperature experience in the performance of work varied from +45°C to -20°C. Coordinated subcontractors’ site activities.
July 2002 To July 2003

Sustaining Technical Employee

at Niagara International Corp.
Location : Philippines
Provided technical support on the acquisition and implementation of various local projects.
September 2001 To March 2002

Project Engineer

at McConnell Dowell Phils. Inc.
Location : Philippines
Joint Oil Companies (Shell, Caltex, Mobil and
Petron) Aviation Storage Plant (JOCASP) Relocation Project
Ninoy Aquino International Airport (NAIA3)

JOB DESCRIPTION:
1. Provided technical support on Civil / Building works.
2. Coordinated geotechnical investigations, survey works, delivery of piping materials from Singapore and various permit acquisition activities.
September 2000 To August 2001

Project Engineer / Sustaining Technical Employee

at McConnell Dowell Phils. Inc.
Location : Philippines
Malampaya Onshore Gas Plant

JOB DESCRIPTION:
1. Involved in securing permit.
2. Supervision of 24” gas pipeline construction through operating oil refinery.
January 2000 To August 2000

Project Engineer / Sustaining Technical Employee

at McConnell Dowell Phils. Inc.
Location : Philippines
Land Fall Project

JOB DESCRIPTION:
1. Involved in Project Design and Procedure Documentation.
2. Supervised the construction of 120 linear meters sheet pile coffer dam, complete with extensive walers and struts and anchor wall structure. The Coffer Dam was constructed 100metres through Fill placed out into the sea. Dredging works were also included.
July 1999 To December 1999

Project Engineer / Sustaining Technical Employee

at McConnell Dowell Phils. Inc.
Location : Philippines
Tabangao - Sta. Rita Natural Gas Pipeline

JOB DESCRIPTION:
1. In charge of Horizontal Direction Drilling (HDD) Subcontractor.
2. Coordinated mobilization of extensive equipment during the drilling, provided support services, followed by relocation of equipment to new Drilling locations. A total of 4 HDD’s were with a total distance of close to 3500 linear meter.
November 1997 To July 1999

Project Engineer

at McConnell Dowell Phils. Inc.
Location : Philippines
Sta. Rita 1000 MW Power Plant

JOB DESCRIPTION:
1. Involved in supervision of construction of jetty with mooring dolphins catering for oil tankers to 100, 000 DWT.
2. Assisted the project manager in all aspect of the mobilization stage of the project including securing government permits, sourcing out of subcontractors, local project workforce and equipment and material requirements of the project.
3. In charge of offshore piling, rebar fabrication, concreting and erection of precast piers.
February 1997 To October 1997

Project Engineer

at McConnell Dowell South East Asia Private Limited
Location : Singapore
Jurong Island Reclamation Project

JOB DESCRIPTION:
1. Supervised the installation of sheet pile protection for existing oil pipeline extending from shore to the offshore loading facility. Vibration caused by the driving of sheet piles on the pipeline was monitored throughout the sheet piling works.
2. Prepared tender documents.
December 1994 To January 1997

Project Engineer

at Kajima Corporation
Location : Singapore
Petro Chemical Singapore (PCS II) Project

JOB DESCRIPTION:
1. Coordinated equipment, manpower and material supply under the direction of the deputy project manager.
2. Supervised piling works, earthworks, road works, form works, rebar works and concreting works.
3. Prepared inspection request and report, manpower, activities and equipment reports.
4. Conducted material testing (i.e. nuclear density test on sub grade and base course of roads).
5. Works supervised include temporary and permanent roads, open ditch, box culverts, equipment foundations, pits and ponds, sea water outlet structure, pipe sleepers, pipe support, pipe rack foundation, sea water pipeline, tank foundation, concrete and gravel pavement, underground piping, duct banks, miscellaneous foundations, etc.
6. Actively involved in the preparation of claims to the client consisting of monthly progress claims as well as variation claims complete with substantiation. Prepared measured quantities of concrete, rebar, formworks, piping, etc.
October 1993 To October 1994

Quality Control Engineer

at YAMAZAKI CONSTRUCTION (S) PTE; LTD.
Location : Singapore
Singapore Refining Company (SRC) RCC Expansion Project

JOB DESCRIPTION:
1. In charge of the proper execution of the work according to project specifications.
2. Coordinated In-situ and laboratory testing of materials.
3. Performed density and compaction tests on soil and base course materials using Nuclear Method.
4. Conducted and coordinated routine inspection of prepared works.
5. Maintained and controlled pertinent documents and drawings.
6. Prepared progress reports.
7. Attended progress meeting with client.
8. Prepared Minutes of the Meeting.
February 1992 To September 1993

Engineer A (Contracts and Specification)

at National Irrigation Administration
Location : Philippines
Pampanga Delta Development Project - Irrigation Component

JOB DESCRIPTION:
1. In charge of estimation of the diversion dam, irrigation canals / structures and Sta. Monica and Bungang Guinto Drainage System.
2. Prepared program of works and quantity / cost estimates including project implementation schedules, CPM Diagrams S-Curves, cash flows, manpower and equipment utilization schedules, reinforcing steel bar diagrams and unit price derivation of various work item.
3. Prepared bid and contract documents.
May 1989 To July 1991

Civil Engineer

at Nippon Kokan KK (NKK) Corporation
Location : India
Ethane Propane Recovery (EPR) Project
Oil and Natural Gas Commission of India (ONGC)

JOB DESCRIPTION:
1. Prepared change orders and claims.
2. Negotiated change orders with the client Oil and Natural Gas Commission of India(ONGC).
3. Responsible for Change Order documentations and filing.
4. Prepared Bill of Quantities and cost estimates for civil, structural, architectural and piping works.
5. Assisted the project coordinator during the precommissioning of the plant.
6. Prepared correspondence / letters.
January 1988 To May 1989

Civil Engineer

at Department of Public Works and Highways
Location : Philippines
Phase I-Construction of Ninoy Aquino Bridge and Baquit Bridge
Phase II-Construction of Access Road from Romulo Highway to Ninoy Aquino Bridge.

JOB DESCRIPTION:
1. Conducted surveys such as traverse, profile and cross section.
2. Established road and bridge centerline and elevation of piers, abutments and other structures such as pipe culverts.
3. Supervised driving of 296 nos. R.C. Piles using diesel hammers.
4. Prepared concrete mix design.
5. Supervised the fabrication and installation of rebar and formworks.
6. Prepared accomplishment reports.
7. Assisted the project engineer in the preparation of charge orders.
August 1987 To December 1987

Associate Civil Engineer

at Department of Public Works and Highways
Location : Philippines
Various Projects

JOB DESCRIPTION:
1. Inspected the proposed project site and conducted preliminary surveys.
2. Prepared the program of works, quantity and cost estimates. CPM and cash flow diagrams and S-curves.
3. Supervised base preparation of the deteriorated concrete pavement such as proof rolling, seating and joint and crack sealing.
4. Supervised placing of bituminous concrete materials.
January 1987 To July 1987

Associate Civil Engineer

at Department of Public Works and Highways
Location : Philippines
Phase I-Restoration of Sulipan Bridge (Bridge No.53+081)

JOB DESCRIPTION:
1. Supervised the demolition of the existing deteriorated concrete slab.
2. Supervised the repair of I-beams, stringers, girders and other components of the steel truss bridge.
3. Supervised formwork preparations, rebar installation and concreting works for the new concrete slab.
4. Prepared accomplishment reports.
November 1985 To December 1986

Associate Civil Engineer

at Department of Public Works and Highways
Location : Philippines
Concreting of Capas Conception Road

JOB DESCRIPTION:
1. Inspected and monitored of the project.
2. Supervised testing of materials.
3. Prepared reports.
September 1984 To September 1985

Civil Engineering Aide

at Department of Public Works and Highways
Location : Philippines
Various Projects

JOB DESCRIPTION:
1. Prepared program of works, quantity and cost estimates of proposed projects.
2. Assisted in the supervision of various roads and bridge projects within the district.

Education

What's your educational background?
Let employers know more about your education; remember, be clear and concise.
January 1984

Bachelor's degree, Civil Engineering

at Mapua Institute of Technology
Location : Intramuros, Manila, Philippines
Bachelor of Science in Civil Engineering Mapua Institute of Technology - Manila Year Graduated - 1984

Specialties & Skills

CONCRETE

DOCUMENTATION

DREDGING

ENGINEER

GAS PIPELINE

OIL REFINERY

PIPELINE

PIPELINE CONSTRUCTION

PROJECT ENGINEER

REFINERY

reinforced concrete construction

Civil Works Construction

Steel Structures

Languages

Do you speak more than one language?
For some jobs, fluency in one or more foreign languages is a plus, so add your language skills to get better results.

English

Expert

Filipino

Expert

Memberships

Are you a member of any organization or professional club?
Your professional memberships provide an informative signal about your career aspirations, so add them!
Organization : Philippine Institute of Civil Engineers
Membership/Role : Member
Member since : July 1985

Training and Certifications

110-100075/PPHK535201 ( Certificate )

Issued in: September 1995 Valid Until: - September 1995

Loading
Loading...
Loading...