الخبرة العملية

مجموع سنوات الخبرة :15 years, 2 أشهر

electrical department section head في MCC
  • مصر - المنيا
  • أشغل هذه الوظيفة منذ مارس 2016

. Applying all the electrical maintenance activities correction,  preventive and predictive.  . Applying the ISO requirements and procedures.  . Cooperation with other department to achieve company goals as possible.  .prepare plant spare parts and communicate with suppliers.  .save pack up for PLC programs S7300 with TIA portal software and S7 SIMATIC MANGER SOTWARE.  .Save pack up for all the system AC motor drives danfoss type.   .leading and training the electrical team.  Senior instrumentation and automation engineer in factory area: from JAN‐2017 to JAN /2018  
My job rules  Responsible for all electrical maintenance power,  instrumentation and automation activities and  troubleshooting.  Record the electrical maintenance reports,  pm schedules and ISO reports.  • Instrument and electrical installation and commissioning activities.  • Inspection of material on receipt at warehouse.  • Onsite inspection of installations and punch listing.  • Witnessing of calibration of instruments,  leak tests,  cable insulation tests etc.  • Connection of Field instruments to RTU panels   • Simulation,  Testing and Pre‐Commissioning of all wired instruments with RTU panel  • Ensure that as‐built drawings are prepared and maintained completed project files including all loop        drawings,  updated interlock and logic drawings.   • Supervision of instrument and control system maintenance activities.   • Trouble shooting,  maintenance of field instruments like transmitters,  control valves.  • Shutdown planning and maintenance.  

senior instrumentation Engineer في ASCOM CCM (ASCOM FOR CALCIUM CARBONAT)
  • أشغل هذه الوظيفة منذ يناير 2014

My Technical Issues
• Instrument installation and commissioning activities.
• Inspection of material on receipt at warehouse.
• Onsite inspection of installations and punch listing.
• Witnessing of calibration of instruments, leak tests, cable insulation tests etc.
• Connection of Field instruments to RTU panels
• Simulation, Testing and Pre-Commissioning of all wired instruments with RTU panel
• Ensure that as-built drawings are prepared and maintained completed project files including all loop drawings, updated interlock and logic drawings.
• Supervision of instrument and control system maintenance activities.
• Trouble shooting, maintenance of field instruments like transmitters, control valves .
• Shutdown planning and maintenance.
• Identifying critical instrumentation and control system spares for procurement. • Review of Basic engineering documents.
• Preparation of Instrument database and specifications for various field instruments packages.

Electrical maintenance Engineer في PEPSICO INTERNATIONAL
  • الإمارات العربية المتحدة
  • ديسمبر 2007 إلى يناير 2011
Electrical maintenance Engineer في PEPSICO INTERBATIONAL
  • ديسمبر 2007 إلى يناير 2011

Understand the process flow sheet of minerals manufacturing.
Modifying and updating sensors
Familiar with water &waste water treatment station.
Applying the preventive maintenance.
Ordering the electrical spare parts of the machines
Work with SAP programme

automation Engineer في ASCOM CCM
  • فبراير 2011 إلى يناير 2011
Instrumentation Engineer
  • فبراير 2011 إلى يناير 2011

My Technical Issues
Understand the process flow sheet of minerals manufacturing.
Work in Installing and commissioning of new coated line and wet line instrumentation and motors list
Work in the modification of ball mill motor starter and old coated line
Monitoring the production Process to achieve the sample properties
Understanding and modifying plc program s7 300, s7 1200 and WINCC 2008 flexible.
Familiar with (ball mill, classifiers, air lift systems, airbag filter, haver packing machines

Electrical maintenance Engineer في BESQUIT FACTORY
  • مايو 2006 إلى نوفمبر 2007
Electrical maintenance engineer في BESQUIT FACTORY
  • مايو 2006 إلى نوفمبر 2007

Understand the process flow sheet of minerals manufacturing.
Modifying and updating sensors, motors list.
Monitoring the production Process to achieve the sample properties.

automation engineer في ASCOM CCM
  • إلى

الخلفية التعليمية

بكالوريوس, Electronic Engineering
  • في Menofia University
  • يناير 2005

Overall Grade: pass Project name: simulation of nuclear reactor control ( temperature , speed and safety) WITH EXCELLANT GRAD Plc Programming Scada system Industrial electronics.

Specialties & Skills

CABLEADO
CALIBRATION
DATABASE ADMINISTRATION
ENGINEERING
PROCUREMENT
SIMULATION
SUPERVISORY SKILLS

اللغات

العربية
متمرّس
الانجليزية
متمرّس