Total Years of Experience: 15 Years, 9 Months
July 2013
To Present
SITE ENGINEER
at AL_NOOR CONSTRUCTION CO.
Location :
Pakistan - Lahore
• Supervised the electrical department of the company for all the construction sites.
• Maintained smooth running of the electric commodities.
• Gave on spot remedy solutions to the problems occurred during the implementation of electric works.
• Lead the electrical team for erecting of electrical and power setups.
• Provided coordination among the different teams working on the projects.
• Maintained smooth running of the electric commodities.
• Gave on spot remedy solutions to the problems occurred during the implementation of electric works.
• Lead the electrical team for erecting of electrical and power setups.
• Provided coordination among the different teams working on the projects.
July 2012
To March 2013
Energy Conservation Manager
at Nishat Chunian Ltd
Location :
Pakistan - Lahore
Tools: Power and Harmonics Analyzer (3-Phase, Single Phase), Anemometer, Bearing Checker, RH Tester, Micro-manometer, Voltmeter, Ammeter, Light Meter, Motion Sensor, Thermal Imager, Earthling current and Leakage Current meter, Electronic Stethoscope, Vibration Checker.
Responsibilities:
• Actively worked for proper development of energy conservation department.
• Established two sub departments mechanical and power conservation departments.
• Lead the mechanical conservation and power conservation teams.
• Ball bearings, winding wires, heating levels, inrush current, current spikes, frequency variations, KVA, KW, KVAR, capacity requirement and other required inspection was done of all the motors and efficiency of motors boosted from 65% to 85%.
• Replaced many out dated motors with new energy efficient IE2 standards having good heat dissipation quality.
• VFDs installed for soft start and speed variations where ever necessary.
• Installed power factor (pf) panels at sub control rooms of power of each department to improve the over-all pf from 0.94 to 0.99.
• Reuse of steam and boiler exhaust for pre-heating of boiler water and furnace oil was successfully accomplished.
• Implemented auto control of office air conditioners, fans and lights of offices, chiller, boiler and other such areas.
• Replaced all the florescent and sodium lamps with power efficient and long life LED lights.
• Light standards and optimization applied to minimize the number of installed lights.
• Transferred the lights from ceiling to on top of the production machines as a result better light on operational areas of machines and number of lights decreased to 1/3rd.
• Transformer tests to check their proper working and take proper measures to fulfill any deficiency.
• Scheduled power load shift from one transformer to other and cut off input supply to the other transformer to save standby power loss.
• Replaced 20x25KW motors with 20x4KW motors by redesigning the RH controlling\’showering system.
• The use of humid air of return fans of humidity system maximized after proper treatment.
• Compressed air boosters were installed to use residual compressed air which replaced many small air compressors.
• Thoroughly inspected pollutants level in the flue gases of power engines and boilers.
• All the HVAC distribution system joints were properly checked for leakages and properly sealed and insulated to avoid any energy loss in distribution system.
• Preparation and implementation of standard operating procedures (SOP) for industry.
Responsibilities:
• Actively worked for proper development of energy conservation department.
• Established two sub departments mechanical and power conservation departments.
• Lead the mechanical conservation and power conservation teams.
• Ball bearings, winding wires, heating levels, inrush current, current spikes, frequency variations, KVA, KW, KVAR, capacity requirement and other required inspection was done of all the motors and efficiency of motors boosted from 65% to 85%.
• Replaced many out dated motors with new energy efficient IE2 standards having good heat dissipation quality.
• VFDs installed for soft start and speed variations where ever necessary.
• Installed power factor (pf) panels at sub control rooms of power of each department to improve the over-all pf from 0.94 to 0.99.
• Reuse of steam and boiler exhaust for pre-heating of boiler water and furnace oil was successfully accomplished.
• Implemented auto control of office air conditioners, fans and lights of offices, chiller, boiler and other such areas.
• Replaced all the florescent and sodium lamps with power efficient and long life LED lights.
• Light standards and optimization applied to minimize the number of installed lights.
• Transferred the lights from ceiling to on top of the production machines as a result better light on operational areas of machines and number of lights decreased to 1/3rd.
• Transformer tests to check their proper working and take proper measures to fulfill any deficiency.
• Scheduled power load shift from one transformer to other and cut off input supply to the other transformer to save standby power loss.
• Replaced 20x25KW motors with 20x4KW motors by redesigning the RH controlling\’showering system.
• The use of humid air of return fans of humidity system maximized after proper treatment.
• Compressed air boosters were installed to use residual compressed air which replaced many small air compressors.
• Thoroughly inspected pollutants level in the flue gases of power engines and boilers.
• All the HVAC distribution system joints were properly checked for leakages and properly sealed and insulated to avoid any energy loss in distribution system.
• Preparation and implementation of standard operating procedures (SOP) for industry.
November 2010
To June 2012
Energy Conservation Engineer
at Remington Pharmaceutical Industries (Pvt.) Ltd
Location :
Pakistan - Lahore
Tools: Anemometer, Bearing Checker, Micro-manometer, Multi-meter, Light meter, Power Analyzer, Motion Sensor, Light tubes, SAP warehouse module-1.
RESPONSIBILITIES:
• To work as leading person to evaluate and implement new projects.
• Designed steam condensate reuse complete system from condensate collection in a single storage tank, purification, then up lifting to boiler inlet in semi steam form. The project designed in AutoCAD 2D and also calculated its cost and payback period.
• Diesel engines were automated to use natural gas in each third cycle to decrease the per unit production cost of power.
• All the air conditioner, fans and lights were shifted to automatic control by the motion sensor in the presence of staff.
• Worked as an acting head of electrical and utilities department.
• Attended daily job orders of the plant for corrective maintenance.
• Maintain the smooth running of power supply systems and production machines.
• Preparation & implementation of corrective and preventive maintenance schedules.
• Checking the bearing condition and motors vibrations regularly.
• Being a day time working unit so maximum sun tubes were installed to save lighting power consumption.
• Defined norms of energy conservation and trained the staff accordingly.
• Generated a daily fuel and power consumption report and daily per production unit cost.
• Generated a primary and secondary fuels report which also shows month wise fuel and power consumption patterns and comparison of each moth final per production unit cost.
• Attend weekly comprehensive meeting of higher authorities of the organization.
• Technical skills and communication skills development in staff.
• To optimize the fuel & power consumption in industry.
• Worked on SAP warehouse module -1 for inventory management and proper record keeping of warehouse.
• Report and presentations preparation in MS Excel, MS Word and MS PowerPoint.
RESPONSIBILITIES:
• To work as leading person to evaluate and implement new projects.
• Designed steam condensate reuse complete system from condensate collection in a single storage tank, purification, then up lifting to boiler inlet in semi steam form. The project designed in AutoCAD 2D and also calculated its cost and payback period.
• Diesel engines were automated to use natural gas in each third cycle to decrease the per unit production cost of power.
• All the air conditioner, fans and lights were shifted to automatic control by the motion sensor in the presence of staff.
• Worked as an acting head of electrical and utilities department.
• Attended daily job orders of the plant for corrective maintenance.
• Maintain the smooth running of power supply systems and production machines.
• Preparation & implementation of corrective and preventive maintenance schedules.
• Checking the bearing condition and motors vibrations regularly.
• Being a day time working unit so maximum sun tubes were installed to save lighting power consumption.
• Defined norms of energy conservation and trained the staff accordingly.
• Generated a daily fuel and power consumption report and daily per production unit cost.
• Generated a primary and secondary fuels report which also shows month wise fuel and power consumption patterns and comparison of each moth final per production unit cost.
• Attend weekly comprehensive meeting of higher authorities of the organization.
• Technical skills and communication skills development in staff.
• To optimize the fuel & power consumption in industry.
• Worked on SAP warehouse module -1 for inventory management and proper record keeping of warehouse.
• Report and presentations preparation in MS Excel, MS Word and MS PowerPoint.
March 2008
To November 2010
Senior Electrical & Design Engineer
at SHANGHAI POST & TELECOMMUNICATION DESIGN INSTITUTE COMPANY
Location :
Pakistan - Lahore
Responsibilities:
• To do project requirements analysis and management.
• To visit problematic sites, suggest the solution and review the their electrical designs.
• To conduct training on AutoCAD designing of electrical designing team.
• To elaborate and specify the electrical requirements of the approved site.
• To review the single line connection diagrams of all the equipments.
• To provide coordination among electrical, designing and surveying teams.
• To arrange the training sessions for electrical team of the company.
• To do project requirements analysis and management.
• To visit problematic sites, suggest the solution and review the their electrical designs.
• To conduct training on AutoCAD designing of electrical designing team.
• To elaborate and specify the electrical requirements of the approved site.
• To review the single line connection diagrams of all the equipments.
• To provide coordination among electrical, designing and surveying teams.
• To arrange the training sessions for electrical team of the company.